Tennessee Gas Pipeline has declared a Force Majeure between MLV 538-2 and 539-2 on Line 2 near Heidelberg, Mississippi, effective July 23, 2026. An unplanned issue requiring immediate repairs will shut in meter 412789 (Leaf/TGP Jasper County), placing all receipts and deliveries at that meter at risk starting with Timely Cycle on July 23. No restoration timeline has been provided; TGP states it will update customers as more information becomes available.
TGP force majeure on Line 2 in Heidelberg, MS shuts in the Leaf/Jasper County meter with no stated restoration timeline, removing an indeterminate volume of Southeast supply and creating bullish pressure on Tennessee Zone 4 and Transco Zone 4 Southeast basis vs Henry Hub.
Reroute: Limited: Transco and Southern Natural Gas (SNG/EGT) serve overlapping Southeast markets, but the specific Leaf/Jasper County receipt point is directly tied to TGP Line 2 with no direct bypass; downstream Southeast deliveries dependent on this meter have limited reroute options.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): FORCE MAJEURE Notice Type Desc (2): FORCE MAJEURE
Notice Eff Date/Time: 07/21/2026 2:32:40PM Notice End Date/Time: 07/22/2026 9:00:00am
Post Date/Time: 7/21/2026 2:32:40 PM Notice ID: 402947
Reqrd Rsp: 1 Rsp Date/Time: 7/21/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: FORCE MAJEURE 538-2 TO 539-2 EFF 7-23-26
Notice Text:
FORCE MAJEURE AT MLV 538-2 TO 539-2 EFFECTIVE 7-23-2026
Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of a Force Majeure event between valve sections 538 and 539 on Line 2 near Heidelberg, Mississippi. An issue has been discovered which requires immediate repairs. Tennessee personnel are on site and have already begun working on a repair plan. Based on current nominations and forecasted demand, Tennessee is providing notice to customers that Primary In the Path capacity at MLV 539 (Segment 534 BH) could be impacted as early as Timely Cycle for the Gas Day of Thursday, July 23, 2026 and throughout the duration of this repair work. The repair work will cause the following meter to be shut in for the duration of the work:
412789 LEAF/TGP Jasper County
All Receipts and all Deliveries at the Leaf TGP Jasper County Meter (412789) will be at risk as early as Timely Cycle for the Gas Day of Thursday, July 23, 2026 and for the duration of this work.
Tennessee will continue to update customers as more information becomes available.
Please contact your Account Representative or Scheduler if you have any questions.
..
ANR Pipeline (TC Energy)
CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
SEV 4/5
Maintenance2.265 Bcf/dUntil Further Notice7 Days
ANR Pipeline has planned maintenance at Eunice Compressor Station in Acadia Parish, Louisiana (Southeast Area) from August 4-10, 2026, resulting in firm primary, firm secondary, and interruptible curtailments. Nine delivery and interconnect locations face full or near-full capacity reductions totaling approximately 2.265 Bcf/d of constrained capacity, with Pine Prairie South Del completely shut (0.6 Bcf/d) and major curtailments at Shadyside/Sonat (0.431 Bcf/d to 0.150 remaining) and Shadyside/TGP (0.443 Bcf/d to 0.030 remaining). ANR estimates firm primary impact at 10% of current net nominations and 27% of contracted MDQ.
ANR Eunice CS maintenance removes approximately 2.265 Bcf/d of Southeast Area delivery capacity for 7 days (8/4-8/10), with firm primary curtailments affecting key interconnects to CGT (Columbia Gulf), TGP, Sonat/SNG, and Trunkline; expect bullish pressure at Henry Hub and Transco Zone 4 as Gulf Coast supply access tightens, with widening ANR Southeast-to-Midwest basis.
Reroute: Moderate: TETCO (monitored), Trunkline/TGC (monitored), and Southern Natural/SNG (EGT, monitored) serve overlapping Gulf Coast northbound corridors, but the scale of curtailments across multiple interconnects simultaneously -- including the Patterson/Trunkline and Patterson/Col Gulf links -- significantly limits the ability of alternatives to absorb the full volume; partial reroute possible but not sufficient to fully offset 2.265 Bcf/d of constrained capacity.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/11/26
Subject: Subject: CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0001027
Notice Text
ANR has planned maintenance in the Southeast Area at the Eunice Compressor Station located in Acadia Parish, Louisiana. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/4 – 8/10:
Pine Prairie South Del (LOC #766185): 600 MMcf/d (leaving 0 MMcf/d)
Patterson/Trunkline (LOC #40317): 94 MMcf/d (leaving 0 MMcf/d)
Patterson to Col Gulf (LOC #43613): 143 MMcf/d (leaving 0 MMcf/d)
Riverway (To Bridgeline) (LOC #42593): 130 MMcf/d (leaving 40 MMcf/d)
Avalon (LOC #38295): 85 MMcf/d (leaving 25 MMcf/d)
Shadyside/Sonat (Del) (LOC #10369): 431 MMcf/d (leaving 150 MMcf/d)
Shadyside/TGP (Del) (LOC #467240): 443 MMcf/d (leaving 30 MMcf/d)
St. Landry/FL Int (LOC #322625): 69 MMcf/d (leaving 30 MMcf/d)
Weeks ISLA/LIG PL (LOC #233620): 270 MMcf/d (leaving 40 MMcf/d)
Evangeline Southbound (LOC #FPEVNGSB): 380 MMcf/d (leaving 926 MMcf/d)
Estimated impact to Firm Primary as follows:
10% - Based on the Current Net Shipper Nominations
27% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - L3162
SEV 4/5
Force Majeure1 Days
El Paso Natural Gas has declared a force majeure on Line 3162 effective 07/21/2026 at 2:01 PM, with an expected restoration by 07/22/2026 at 9:00 AM -- approximately 19 hours of impact. No specific capacity volume is stated in the notice. L3162 is an EPNG mainline segment; as an outbound Permian Basin corridor, this event traps gas at Waha while reducing westbound supply to SoCal Border and Arizona delivery points.
EPNG FM on L3162 removes westbound Permian takeaway capacity for roughly 19 hours; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points -- no volume stated but any mainline FM on EPNG is a firm market signal.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing corridor for SoCal border and Arizona deliveries, but available spare capacity on TW at this time is uncertain and may not fully offset an EPNG mainline FM event.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - L3162
Posted: 07/21/2026 2:01:00PM
Effective: 07/21/2026 2:01:00PM
End Date: 07/22/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Draft
SEV 4/5
Operational Alert1 Days
EPNG has declared a System-Wide Operational Flow Order (OFO) / SOC (System Operational Condition) effective 07/21/2026 at 7:25 AM, expiring 07/22/2026 at 9:00 AM. The system-wide scope indicates EPNG is experiencing line pack stress or imbalance conditions across its entire network, spanning the Permian Basin eastward origin points through to SoCal Border and Arizona delivery points. No specific capacity volume is stated in the notice, but system-wide OFO declarations on EPNG signal operational stress requiring shippers to balance nominations immediately.
EPNG system-wide OFO creates immediate balancing pressure for all shippers; expect bearish Waha/Permian basis as takeaway is operationally constrained and bullish pressure at SoCal Border and Arizona delivery points as westbound deliveries tighten -- shippers out of balance risk cash-out penalties and forced curtailment through 9:00 AM 07/22.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal Border and Arizona delivery points, and may absorb some displaced volumes; however, summer peak demand conditions likely mean TW is operating near capacity, limiting meaningful reroute relief.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Declaration - System Wide Draft
Posted: 07/21/2026 7:25:31AM
Effective: 07/21/2026 7:25:31AM
End Date: 07/22/2026 9:00:00AM
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE 113-2 TO 114-2 EFF 7-22-26
SEV 4/5
Force MajeureUntil Further Notice
Tennessee Gas Pipeline has declared a Force Majeure on Line 2 between MLV 113-2 and MLV 114-2 (Broad Run Lateral) in Boyd County, Kentucky near Catlettsburg, effective July 22, 2026, until further notice. The FM is triggered by a PHMSA Corrective Action Order (CAO) following an emergent repair that began July 8, 2026, which restricts operating pressures on Line 2 from Sta. 110 (Morehead, KY) to Sta. 114 (Catlettsburg, KY). As a result, nominations at Big Sandy Glancy Fork PIN 412742 will be reduced to zero, with potential for additional segment restrictions as nearby scheduled maintenance concludes.
TGP force majeure on Line 2 Appalachian segment (Sta. 110-114, KY) reduces Big Sandy Glancy Fork nominations to zero until further notice, tightening Appalachian southbound/downstream capacity and supporting bullish pressure at Transco Zone 4 Southeast and Dominion South basis vs Henry Hub.
Reroute: Moderate: Transco and Columbia Gas Transmission (TCO) serve overlapping Appalachian and Southeast corridors, but TCO and TETCO M2 capacity availability will determine how much of the stranded Big Sandy volume can be rerouted; additional TGP segment restrictions flagged as possible if nearby maintenance concludes, which could further limit reroute flexibility.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): FORCE MAJEURE Notice Type Desc (2): FORCE MAJEURE
Notice Eff Date/Time: 07/20/2026 1:09:12PM Notice End Date/Time: 07/21/2026 9:00:00am
Post Date/Time: 7/20/2026 1:09:12 PM Notice ID: 402927
Reqrd Rsp: 1 Rsp Date/Time: 7/20/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402639
Subject: FORCE MAJEURE 113-2 TO 114-2 EFF 7-22-26
Notice Text:
EMERGENT REPAIR BETWEEN MLV 113-2 AND MLV 114-2 (BROAD RUN LATERAL) ESCALATED TO FORCE MAJEURE EFFECTIVE 7-22-2026
On July 8, 2026 (Notice Identifier #402639) Tennessee posted notice of an Emergent Repair in Boyd County near Catlettsburg, Kentucky that necessitated repairs and required isolation of the valve segment between MLV 113-2 and MLV 114-2. Tennessee continues the investigation process while making the necessary repairs. To date, there has been no customer impact due to the incident.
Related to this Emergent Repair, Tennessee received a Corrective Action Order (“CAO”) issued by the Pipeline and Hazardous Materials Safety Administration (“PHMSA”), Office of Pipeline Safety (“OPS”) and is now subject to a restriction of operating pressures on Line 2 from Sta. 110 in Moorehead, Kentucky to Sta. 114 in Catlettsburg, Kentucky. In accordance with the restrictions of the CAO, Tennessee is escalating the Emergent Repair and declaring a Force Majeure event effective Wednesday, July 22, 2026, pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff.
The reduction in operating pressure on line 2 from Sta. 110 to Sta. 114 will reduce the available capacity at the following pipeline location effective Wednesday, July 22, 2026 and until further notice:
Nominations at the Big Sandy Glancy Fork PIN (412742) will be reduced to zero.
Based on current nominations and other pipeline maintenance activities in the area, Tennessee anticipates no additional segment restrictions at this time. However, as ongoing scheduled maintenance in the area concludes, additional segment restrictions may become necessary.
Tennessee will continue to update customers as more information becomes available.
Please contact your Account Representative or Scheduler if you have any questions.
..
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure Update - Florida C Station
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a Force Majeure at Florida C Station effective 07/14/2026 at 9:41 AM with an expected end date of 07/15/2026 at 9:00 AM. Florida C is an internal EPNG tariff segment/compressor station designation in the Southwest/Texas-New Mexico corridor, not related to the state of Florida. The notice does not specify a capacity volume loss, but a force majeure at a compressor station on an outbound EPNG segment constrains Permian Basin takeaway moving westward toward SoCal and Arizona delivery points.
EPNG force majeure at Florida C Station constrains Permian-to-west outbound flow for approximately 1 day; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume specified so magnitude of basis move is uncertain.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes, though spare capacity on TW is not guaranteed and cannot be confirmed without operational data.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Update - Florida C Station
Posted: 07/14/2026 9:41:48AM
Effective: 07/14/2026 9:41:48AM
End Date: 07/15/2026 9:00:00AM
ANR Pipeline (TC Energy)
UPDATED CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
SEV 4/5
Maintenance0.025 Bcf/dUntil Further Notice24 Days
ANR Pipeline has extended unplanned maintenance on the Michigan Leg South at the Joliet NGPL interconnect (LOC #2610) in Will County, Illinois, now running from 7/8 through 7/31 (extended from the prior 7/12 end date). Capacity at Joliet NGPL is reduced to 0 MMcf/d from 25 MMcf/d, a complete elimination of deliveries at this location. ANR explicitly anticipates 100% curtailments of Firm Primary, Firm Secondary, and Interruptible service based on both current nominations and contracted MDQ.
ANR unplanned outage eliminates all 0.025 Bcf/d of Joliet NGPL deliveries through 7/31 with 100% firm primary curtailments confirmed; expect bullish pressure at Chicago Citygate and NGPL Midcontinent basis as this supply point goes fully dark for the remainder of the month.
Reroute: Moderate: NGPL, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volume, though 100% firm primary curtailments at this specific Joliet interconnect point mean affected shippers must actively seek alternative paths and may face higher basis costs.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26093019
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/08/26
07/13/26
Subject: Subject: UPDATED CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
Author: Author: T0001027
Notice Text
Since the last posting, ANR has extended the unplanned pipeline maintenance in the Michigan Leg South area at Joliet NGPL in Will County, Illinois. As a result, capacity will be reduced as follows:
7/8 – 7/31 (previously 7/12) Joliet NGPL (LOC #2610): 25 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule and deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - Puckett Station
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a force majeure at Puckett Station effective 07/10/2026 at 7:28 AM, with an end date of 07/11/2026 at 9:00 AM -- approximately one calendar day. Puckett Station is a compressor/measurement station on the EPNG system in the Permian Basin corridor, affecting westbound Permian takeaway capacity. No specific volume restriction was provided in the notice.
EPNG force majeure at Puckett Station restricts Permian Basin westbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points as downstream supply tightens -- monitor for capacity volume disclosure in subsequent revisions.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some displaced Permian volumes, but spare capacity is not guaranteed and a simultaneous TW constraint would eliminate California reroute options entirely.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Puckett Station
Posted: 07/10/2026 7:28:40AM
Effective: 07/10/2026 7:28:40AM
End Date: 07/11/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - Line 1103 Update #2
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a force majeure on Line 1103, effective July 9, 2026 at 2:37 PM with an expected restoration by July 10, 2026 at 9:00 AM. This is a fresh first-revision notice (Revision Number 1, Is Revision: No) covering approximately 18 hours of disruption. No specific capacity volume is stated in the notice, but any EPNG Line 1103 outbound constraint restricts Permian/Waha takeaway westward toward SoCal and Arizona markets.
EPNG Line 1103 force majeure tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points for the July 9-10 gas day.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal Border and Arizona delivery points from the Permian/San Juan Basin, but spare capacity availability is uncertain and may not fully offset EPNG Line 1103 volumes given the short notice window.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103 Update #2
Posted: 07/09/2026 2:37:36PM
Effective: 07/09/2026 2:37:36PM
End Date: 07/10/2026 9:00:00AM
Enable Gas Transmission (EGT)
[Enable Gas Transmission (EGT)] [Force Majeure] LINE S FMJ
SEV 4/5
Force MajeureUntil Further Notice
EGT has declared Force Majeure on Line S in the South Pooling Area effective July 10, 2026 at 09:00 CDT, continuing until further notice, due to unplanned integrity assessment maintenance. All IT and Secondary service flows from West 1, West 2, Flex, and North Pooling Areas into the South Pooling Area are suspended, and receipt nominations from Line AC meters (including MRT at Glendale and NGPL at Hot Springs) to South Pooling Area delivery points are severely limited. Shippers must nominate from primary receipt to primary delivery to maintain highest service priority or face OFO issuance.
EGT Force Majeure on Line S eliminates interpool IT and secondary service into the South Pooling Area with no restoration timeline, isolating Arkla Basin / Oklahoma delivery points and creating tightness at MRT and NGPL Hot Springs interconnects; shippers exposed to curtailment risk should immediately restructure nominations to primary firm paths.
Reroute: Limited: Gulf South and Southern Natural (EGT via Energy Transfer) serve overlapping Arkla Basin and Southeast corridors and may absorb some displaced volume, but the loss of specific receipt-to-delivery paths on EGT Line AC -- particularly the MRT Glendale and NGPL Hot Springs meter points -- limits practical reroute options for shippers with South Pooling Area delivery obligations.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6469
Notice Type: Force Majeure
Subject: LINE S FMJ
Posted: Thu Jul 09 13:20:00 CDT 2026
Effective: Fri Jul 10 09:00:00 CDT 2026
End Date:
EGT Critical Notices
TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Critical notice
Notice Effective Date: 07/10/2026
Notice Effective Time: 09:00
Notice End Date: 00/00/0000
Notice End Time: 00:00
Notice Identifier: 6469
Notice Status Description: Initiate
Notice Type: Force Majeure
Posting Date/Time: 07/09/2026 13:19
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject: LINE S FMJ
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C, of EGT s Tariff, and shall
constitute notice of Force Majeure under Section 8, GT&C, of EGT s Tariff to notify all parties of
unplanned maintenance on EGT s Line S in the South Pooling area as a result of an integrity
assessment.
Effective starting Friday, July 10th at 09:00 and continuing until further notice, EGT will not allow
IT and Secondary services from EGT s West 1, West 2, Flex and North Pooling Areas to EGT s South
Pooling Area. In addition, EGT will have limited ability to schedule receipt nominations from meters
that are located on EGT s Line AC to delivery points or pools located in EGT s South Pooling Area.
Meters include but are not limited to the following;
MP# 802267 MRT at Glendale
MP# 803500 NGPL at Hot Springs
EGT will not be capable of supporting non-ratable IT services in EGT s South Pooling area. Shippers
with delivery points in EGT s South Pooling Area should nominate from their primary receipt point to
their primary delivery point in order to maintain the highest priority level of service.
Failure to comply with this Force Majure notice will result in an OFO.
EGT will notify its shippers of changes regarding its capacity to the South Pooling Area by updating
this posting. EGT will continue to monitor capacity and will schedule receipts and deliveries in
accordance with EGT s Tariff.
If you have any questions concerning this Alert, please contact your scheduling representative.
For a more readable version of this document click
Here
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
SEV 4/5
Maintenance0.025 Bcf/dUntil Further Notice5 Days
ANR Pipeline has declared an unplanned maintenance event on the Michigan Leg South at the Joliet NGPL interconnect (LOC #2610), effective intraday 7/8/2026 through 7/12/2026. The full 25 MMcf/d (0.025 Bcf/d) capacity at this location is reduced to zero, with 100% curtailment of Firm Primary service based on both current net shipper nominations and contracted MDQ. ANR is cutting previously scheduled volumes beginning Gas Day 7/8/2026 and will issue reservation charge credits per tariff Section 6.36 if firm capacity cannot be delivered.
Unplanned ANR Michigan Leg South outage eliminates 0.025 Bcf/d at the Joliet NGPL interconnect with 100% firm primary curtailments through 7/12, tightening NGPL Chicago/Midwest receipts from ANR and widening Chicago Citygate basis vs Henry Hub.
Reroute: Moderate: NGPL, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, though the complete elimination of this specific ANR-to-NGPL interconnect point limits direct substitution for shippers relying on this delivery location.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
07/13/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
Author: Author: T0001027
Notice Text
ANR has unplanned pipeline maintenance in the Michigan Leg South area at Joliet NGPL. As a result, capacity will be reduced as follows:
7/8 (Intraday) – 7/12 Joliet NGPL (LOC #2610): 25 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
ANR will be cutting previously scheduled volumes for Gas Day 7/8/2026. Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule and deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - Line 1103 Update #1
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a force majeure on Line 1103 effective July 7, 2026 at 1:07 PM, with restoration expected by July 8, 2026 at 9:00 AM -- approximately 20 hours of impact. This is a first-notice event (Revision 1, not a revision of a prior notice) on an EPNG mainline segment. No specific capacity volume is stated in the notice, but Line 1103 is a Permian Basin outbound segment, meaning gas cannot move westward toward SoCal/Arizona delivery markets.
EPNG force majeure on Line 1103 creates a split-direction signal: expect bearish pressure at Waha/Permian Basin as westbound takeaway is curtailed, and bullish pressure at SoCal Border and Arizona delivery points as downstream supply is reduced -- no capacity volume disclosed.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal Border and Arizona delivery points and may absorb some diverted Permian volumes, but spare capacity on TW during peak summer conditions may be limited.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103 Update #1
Posted: 07/07/2026 1:07:57PM
Effective: 07/07/2026 1:07:57PM
End Date: 07/08/2026 9:00:00AM
Columbia Gulf Transmission (CGT)
Ridgeline Tie-In Maintenance (HartSEG & 4166), July 14-31, 2026
SEV 4/5
Maintenance0.345 Bcf/d18 Days
CGT has issued a Critical notice for planned Ridgeline Tie-In maintenance on Mainlines 200 and 300 from July 14-31, 2026. Backhaul capacity through HartSEG will be reduced from design capacity of 2.545 Bcf/d to approximately 2.200-2.400 Bcf/d (a loss of roughly 0.145-0.345 Bcf/d), with the midpoint loss near 0.245 Bcf/d. Additionally, the City of Gallatin (meter 4166) will be taken to zero capacity July 14-23. CGT explicitly warns that Interruptible, Secondary Firm, AND Primary Firm service curtailments are possible, triggering a high-severity assessment despite this being planned maintenance.
CGT planned maintenance removes up to 0.345 Bcf/d of backhaul capacity through HartSEG July 14-31, with explicit primary firm curtailment risk flagged -- expect bullish pressure on Transco Zone 4 Southeast basis and tightening at Henry Hub as Gulf Coast-to-Appalachian backhaul throughput is reduced.
Reroute: Moderate: Texas Eastern (TETCO) and Trunkline (TGC) serve overlapping Gulf Coast northbound corridors and may absorb some displaced volumes, but the explicit primary firm curtailment warning suggests CGT system utilization is high enough that partial reroute on competing pipes may not fully offset the constraint.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/07/26
07/07/26
08/07/26
Subject: Subject: Ridgeline Tie-In Maintenance (HartSEG & 4166), July 14-31, 2026
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gulf Transmission LLC (CGT) notifies customers of upcoming Ridgeline Tie-In’s on Mainlines 200 and 300 beginning on Tuesday, July 14, 2026, through Friday, July 31, 2026. As a result, the backhaul capacity through HartSEG will be reduced to a level between 2,200,000 - 2,400,000 Dth effective Timely Cycle for Gas Day Tuesday, July 14, 2026.
Additionally, the City of Gallatin (4166) meter will be taken to 0 Total Capacity effective Timely Cycle for Gas Day Tuesday, July 14, 2026 through Thursday, July 23, 2026.
CGT anticipates this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services. Please see the details provided below for more information.
HartSEG
· Estimated Capacity Setting: 2,200,000 – 2,400,000 Dth
· Design Capacity: 2,544,656 Dth
· Posted Percentage: 86-94%
Due to the potential impact to firm service, CGT encourages customers to monitor the scheduled volumes on the Operationally Available Capacity screen on Informational Postings, as nominations can fluctuate based on market conditions.
Reservation Charge Credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 40 of CGT’s FERC Gas Tariff (Tariff). By means of this notice, CGT is establishing the 7-day Average Usage Quantity to be the period of June 13-19, 2026, pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - Line 1102
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a force majeure on Line 1102 effective 07/07/2026 at 9:59 AM with a stated end date of 07/08/2026 at 9:00 AM. The notice is a first-revision filing with no specific capacity volume disclosed. Line 1102 is an EPNG mainline segment carrying Permian Basin gas westbound toward Southwest and California delivery markets, producing a split directional signal across the constraint.
EPNG force majeure on Line 1102 tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume disclosed but FM status warrants elevated basis vigilance for the ~24-hour duration.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes; however, if TW is also running near capacity during summer cooling demand, full offset is not guaranteed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1102
Posted: 07/07/2026 9:59:24AM
Effective: 07/07/2026 9:59:24AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[FORCE MAJEURE] Force Majeure - Line 1103
SEV 4/5
Force MajeureUntil Further Notice1 Days
EPNG has declared a force majeure on Line 1103, effective 07/07/2026 at 9:55 AM with an end date of 07/08/2026 at 9:00 AM. The event is approximately one day in duration. No specific capacity volume is stated in the notice, but as an EPNG outbound segment, the constraint reduces Permian/Waha takeaway westward toward SoCal and Arizona delivery points.
EPNG Line 1103 force majeure tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no volume stated but any EPNG mainline FM carries significant directional signal.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes, though spare capacity availability on TW is uncertain and full offset is unlikely during a force majeure event.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103
Posted: 07/07/2026 9:55:28AM
Effective: 07/07/2026 9:55:28AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Draft
SEV 4/5
Operational AlertUntil Further Notice2 Days
EPNG has declared a System-Wide Operational Flow Order (SOC Declaration) effective immediately as of 07/07/2026 at 7:14 AM, running through 07/08/2026 at 9:00 AM. This is a system-wide draft OFO, meaning EPNG is experiencing operational stress across the full pipeline and is requiring shippers to take corrective action to balance the system. No specific capacity volume is cited in the notice.
EPNG system-wide OFO signals immediate operational stress on the primary Permian-to-California corridor; expect bearish pressure at Waha as gas backs up in the basin and bullish pressure at SoCal Border and Arizona delivery points as westbound deliveries are constrained.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some diverted Permian volumes, but a system-wide EPNG OFO typically reflects broad operational stress that TW alone cannot fully offset.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Declaration - System Wide Draft
Posted: 07/07/2026 7:14:14AM
Effective: 07/07/2026 7:14:14AM
End Date: 07/08/2026 9:00:00AM
Algonquin Gas Transmission
07/21/2026- AGT Pipeline Conditions for 07/22/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/22/2026
Notice End Date: 07/23/2026
Posting Date: 07/21/2026
Notice Identifier: 180725
Required Response Indicator Description: No response required
For Gas Day July 22, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
59%
Planned Outage
Cromwell
100%
100%
61%
Planned Outage
Burrillville
100%
100%
82%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
51%
Iroquois Receipts
100%
100%
43%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
70%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
43%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
100%
100%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 7/20/2026. 100 Dth / 2% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/29/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance on the Southeast Mainline at the Madisonville Compressor Station located in Hopkins County, Kentucky. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/11 – 8/12 - Cottage Grove Southbound (LOC #FPCTGGSB): 268 MMcf/d (leaving 965 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
19% - Based on the Current Contracted MDQ
8/14 – 8/28 - Cottage Grove Southbound (LOC #FPCTGGSB): 260 MMcf/d (leaving 972 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
18% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/22/2026
Notice End Date: 07/23/2026
Posting Date: 07/21/2026
Notice Identifier: 180722
Required Response Indicator Description: No response required
For Gas Day July 22, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
98%
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
N/A
100%
43%
Access Area
Union Church South
N/A
100%
New Roads South
N/A
100%
70%
White Castle South
N/A
100%
73%
Longview North
N/A
100%
43%
Deliveries to the Castor Line
N/A
100%
21%
Huntsville North
N/A
13%
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
60%
Gillis North
N/A
100%
53%
West Gillis 1
N/A
100%
67%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/21/2026- NEXUS Pipeline Conditions for 7/22/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/22/2026
Notice End Date: 07/23/2026
Posting Date: 07/21/2026
Notice Identifier: 180696
Required Response Indicator Description: No response required
For Gas Day July 22, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/21/2026- ETNG Pipeline Conditions for 7/22/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/22/2026
Notice End Date: 07/23/2026
Posting Date: 07/21/2026
Notice Identifier: 180698
Required Response Indicator Description: No response required
For Gas Day July 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/08/26
Subject: Subject: CAPACITY REDUCTION - Southeast Mainline – Brownsville Southbound
Author: Author: T0000758
Notice Text
ANR has planned pipeline maintenance on the Southeast Mainline at the Brownsville Compressor Station located in Haywood County, Tennessee. As a result, capacity will be reduced as follows:
8/4 – 8/7 - Brownsville Southbound (LOC #FPBRSVSB): 239 MMcf/d (leaving 988 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
17% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Columbia Gulf Transmission (CGT)
East Lateral - 200 Pigging (ELSEG), July 28-30, 2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/21/26
Subject: Subject: East Lateral - 200 Pigging (ELSEG), July 28-30, 2026
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gulf Transmission LLC (CGT) notifies customers of upcoming pigging on East Lateral - 200 beginning on Tuesday, July 28, 2026, through Thursday, July 30, 2026. As a result, the backhaul capacity through ELSEG will be reduced to 700,000 Dth effective Timely Cycle for Gas Day Tuesday, July 28, 2026.
CGT anticipates this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services. Please see the details provided below for more information.
ELSEG
· Estimated Capacity Setting: 700,000 Dth
· Design Capacity: 986,800 Dth
· Posted Percentage: 71%
Due to the potential impact to firm service, CGT encourages customers to monitor the scheduled volumes on the Operationally Available Capacity screen on Informational Postings, as nominations can fluctuate based on market conditions.
Reservation Charge Credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 40 of CGT’s FERC Gas Tariff (Tariff). By means of this notice, CGT is establishing the 7-day Average Usage Quantity to be the period of June 13-19, 2026, pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119446
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 21 2026 7:39AM
Effective: Jul 21 2026 7:38AM
End Date: Jul 22 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119446
Critical Notice Description: Critical notice
Posting Date/Time: Jul 21 2026 7:39AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 21 2026 7:38AM
Notice End Date/Time: Jul 22 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 21, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 21, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 20% Tolerance
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66504
Notice Type: Operational Alert
Subject: Overage Alert Day 20% Tolerance
Posted: Jul 21 2026 6:21 AM
Effective: Jul 21 2026 9:00 AM
End Date: Jul 22 2026 9:00 AM
Notice ID: 66504
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 21 2026 6:21 AM
Subject: Overage Alert Day 20% Tolerance
Notice Effective Date/Time: Jul 21 2026 9:00 AM
Notice End Date/Time: Jul 22 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 21, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 20% (Twenty Percent) tolerance.For the gas day of July 21, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/21/2026
Notice End Date: 07/22/2026
Posting Date: 07/20/2026
Notice Identifier: 180686
Required Response Indicator Description: No response required
For Gas Day July 21, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
100%
94%
Planned Outage
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
N/A
100%
76%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
20%
Deliveries to the Castor Line
N/A
100%
33%
Huntsville North
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
33%
Gillis North
N/A
100%
47%
West Gillis 1
N/A
100%
79%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/20/2026- NEXUS Pipeline Conditions for 7/21/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/21/2026
Notice End Date: 07/22/2026
Posting Date: 07/20/2026
Notice Identifier: 180659
Required Response Indicator Description: No response required
For Gas Day July 21, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/20/2026- ETNG Pipeline Conditions for 07/21/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/21/2026
Notice End Date: 07/22/2026
Posting Date: 07/20/2026
Notice Identifier: 180664
Required Response Indicator Description: No response required
For Gas Day July 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/21/2026
Notice End Date: 07/22/2026
Posting Date: 07/20/2026
Notice Identifier: 180685
Required Response Indicator Description: No response required
For Gas Day July 21, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
48%
Planned Outage
Cromwell
100%
100%
56%
Planned Outage
Burrillville
100%
100%
80%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
59%
Iroquois Receipts
100%
100%
42%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
73%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
26%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 7/20/2026. 100 Dth / 2% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Gas Transmission
Pipeline Incident Impacting Service Update
SEV 3/5
Operational Alert0.285 Bcf/dUntil Further Notice103 Days
Texas Gas Transmission is responding to a pipeline incident in Panola County, Texas on the North Louisiana Supply Lateral west of the Haughton Compressor Station, originally reported in early 2026. This latest revision extends the notice end date to November 1, 2026, with current Sharon Carthage scheduling group capacities capped at SCW=135,000, SCE=100,000, CEW=235,000, and SCP=285,000 MMBtu/day, plus the Sligo Location 2760 reduced to 0 MMBtu. The event originated months ago and has been progressively updated with evolving capacity restrictions and extended timelines.
TGT North Louisiana Supply Lateral constraint of up to 0.285 Bcf/d on the Sharon Carthage system is a long-running restriction now extended to November 1, 2026; expect modest continued bullish pressure on Gulf Coast-to-Midwest basis given TGT's role as a northbound artery, with Henry Hub slightly supported as Haynesville-area receipts remain constrained.
Reroute: Moderate: ANR, TETCO, and Gulf South serve overlapping Gulf Coast-to-Midwest corridors and can absorb some Sharon Carthage/North Louisiana supply rerouting, though TGT serves specific receipt points on the North Louisiana Supply Lateral that may not have direct alternatives.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038446
Notice Type: Operational Alert
Status: Supersede
Posted: 2026-07-21T12:44:00+00:00
Effective: 2026-07-21T12:45:00+00:00
End: 2026-11-01T09:00:00+00:00
Subject: Pipeline Incident Impacting Service Update
Texas Gas Transmission Notice 5038446
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical
Notice Type Desc :
Operational Alert
Notice Stat Desc :
Supersede
Notice ID :
5038446
Prior Notice :
5038052
Reqrd Rsp Desc :
No response required
Subject :
Pipeline Incident Impacting Service Update
TSP :
115972101
Post Date/Time :
07/21/2026 12:44:00 PM
Notice Effective Date/Time :
07/21/2026 12:45:00 PM
Notice End Date/Time :
11/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update Notice End Date to November 1, 2026 @ 9AM.
*************************************************************************************************
4/28/2026:
Superseding to update Notice End Date to July 31, 2026 @ 5PM as well as adding Sligo Location
2760 Capacity to 0.
Effective immediately, capacity will be reduced to 0 MMBtu at the following locations:
Sligo [Tgec], Location 2760.
***********************************************************
Effective 3/16/2026 @ 9:00AM the capacity on the Sharon Carthage System will be as follows:
Sharon Carthage West (SCW)=135,000
Sharon Carthage East (SCE) = 100,000
Sharon Carthage East + West (CEW) = 235,000
Sharon Carthage (SCP) = 285,000
*************************************************
Updating Notice End Date to April 3, 2026, as well as updating capacities for two of the impacted
scheduling groups (SCW and SCP).
*************************************************
Updating Notice End Date to February 27, 2026.
*************************************************
Updating and removing impacted locations were capacities were previously set to 0.
*************************************************
Updating capacities for the impacted scheduling groups and adding an additional location to the
zero-capacity list.
**************************************************
Adding additional impacted scheduling group, Sharon Carthage (SCP), to the notice below.
**************************************************
Notice
Page 1 of 2
07/21/2026 12:44:09 PM
Adding additional impacted scheduling groups to the notice below.
*************************************************************************
Removing Spring Ridge #5 from impacted locations.
*************************************************************************
Texas Gas Transmission is responding to an incident on its pipeline in Panola County, Texas. The
line was isolated and gas flow has been stopped impacting locations on the North Louisiana Supply
Lateral west of the Haughton Compressor Station. There was no fire and no injuries.
As a result of the event, effective immediately, capacity will be reduced to the stated amounts
below for the following scheduling groups:
Sharon Carthage West (SCW)=100,000
Sharon Carthage East (SCE) = 50,000
Sharon Carthage East + West (CEW) = 150,000
Sharon Carthage (SCP) = 200,000
Our continued focus is on the safety of the public and our employees. We are working closely with
local officials as we assess the situation.
The cause of the incident is under investigation. We will provide updates as appropriate.
Please contact your customer service representative if you have any questions.
Page 2 of 2
07/21/2026 12:44:09 PM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical
Post Date/Time :
07/21/2026 12:44:00 PM
Notice Type Desc :
Operational Alert
Notice Effective Date/Time :
07/21/2026 12:45:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
11/01/2026 09:00:00 AM
Notice ID :
5038446
Response Date/Time :
Prior Notice :
5038052
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Pipeline Incident Impacting Service Update
Notice Text :
Superseding to update Notice End Date to November 1, 2026 @ 9AM.
*************************************************************************************************
4/28/2026:
Superseding to update Notice End Date to July 31, 2026 @ 5PM as well as adding Sligo Location
2760 Capacity to 0.
Effective immediately, capacity will be reduced to 0 MMBtu at the following locations:
Sligo [Tgec], Location 2760.
***********************************************************
Effective 3/16/2026 @ 9:00AM the capacity on the Sharon Carthage System will be as follows:
Sharon Carthage West (SCW)=135,000
Sharon Carthage East (SCE) = 100,000
Sharon Carthage East + West (CEW) = 235,000
Sharon Carthage (SCP) = 285,000
*************************************************
Updating Notice End Date to April 3, 2026, as well as updating capacities for two of the impacted
scheduling groups (SCW and SCP).
*************************************************
Updating Notice End Date to February 27, 2026.
*************************************************
Updating and removing impacted locations were capacities were previously set to 0.
*************************************************
Updating capacities for the impacted scheduling groups and adding an additional location to the
zero-capacity list.
**************************************************
Adding additional impacted scheduling group, Sharon Carthage (SCP), to the notice below.
**************************************************
07/21/2026 12:44:09 PM
Page 1 of 2
Adding additional impacted scheduling groups to the notice below.
*************************************************************************
Removing Spring Ridge #5 from impacted locations.
*************************************************************************
Texas Gas Transmission is responding to an incident on its pipeline in Panola County, Texas. The
line was isolated and gas flow has been stopped impacting locations on the North Louisiana Supply
Lateral west of the Haughton Compressor Station. There was no fire and no injuries.
As a result of the event, effective immediately, capacity will be reduced to the stated amounts
below for the following scheduling groups:
Sharon Carthage West (SCW)=100,000
Sharon Carthage East (SCE) = 50,000
Sharon Carthage East + West (CEW) = 150,000
Sharon Carthage (SCP) = 200,000
Our continued focus is on the safety of the public and our employees. We are working closely with
local officials as we assess the situation.
The cause of the incident is under investigation. We will provide updates as appropriate.
Please contact your customer service representative if you have any questions.
07/21/2026 12:44:09 PM
Page 2 of 2
Gulf South Pipeline
System Wide Alert - Limited Operational Flexibility
SEV 3/5
Operational AlertUntil Further Notice
Gulf South Pipeline issued a system-wide operational alert effective July 15, 2026 at 12:00 PM, citing limited operational flexibility on both its Expansion and Legacy systems due to high firm transmission demand. Shippers are required to balance receipts with deliveries at a Uniform Hourly Rate of Flow; non-compliance may trigger a Critical Period declaration or Operational Flow Order with financial penalties. No end date has been specified and no specific capacity volume is cited.
Gulf South system-wide tightness with OFO escalation risk warrants a bullish watch on Transco Zone 4 and Henry Hub basis -- escalation to a formal OFO or Critical Period declaration would tighten Gulf Coast and Southeast supply further, particularly into SNG/EGT and TGP interconnects.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets, but peak summer demand conditions may limit available spare capacity on alternative pipes to absorb displaced Gulf South volumes.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038424
Notice Type: Operational Alert
Status: Initiate
Posted: 2026-07-15T11:31:00+00:00
Effective: 2026-07-15T12:00:00+00:00
End:
Subject: System Wide Alert - Limited Operational Flexibility
Gulf South Pipeline Notice 5038424
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Operational Alert
Notice Stat Desc :
Initiate
Notice ID :
5038424
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
System Wide Alert - Limited Operational Flexibility
TSP :
078444247
Post Date/Time :
07/15/2026 11:31:00 AM
Notice Effective Date/Time :
07/15/2026 12:00:00 PM
Notice End Date/Time :
Response Date/Time :
Critical :
Notice Text :
Gulf South Pipeline Company, LLC (“Gulf South”) has limited operational flexibility. As such,
effective 7/15/2026 at 12:00 PM, Gulf South is informing shippers that it cannot manage shipper
imbalances on the Expansion and Legacy systems, given the firm transmission demands that are
expected on the system during this time period.
Therefore, Gulf South, requests that all shippers balance their transportation and/or storage
contracts by conforming receipts into the system with the deliveries being taken from the system,
and to receive and deliver quantities at a Uniform Hourly Rate of Flow, pursuant to General Terms
and Conditions (“GT&C”) Sections 6.2 [1] and 6.12 of Gulf South’s FERC Gas Tariff (“Tariff”) and
the applicable firm rate schedules. As described in the GT&C Section 6.2[1], Gulf South requires
that the hourly rate of flow conform to a uniform rate during this constrained period, in
response to these current system conditions. Without correction to shippers’ imbalance usage and
flow rates, Gulf South will be required to implement an operational plan pursuant to the GT&C
Section 6.18 of the Tariff.
If shippers do not voluntarily comply with these provisions, the pipeline may be required to
declare a Critical Period or issue an Operational Flow Order, which could result in penalties for
shippers, pursuant to GT&C Section 6.18 of the Tariff.
Shippers should monitor the pipeline’s Informational Postings website for further updates and any
notice(s) regarding possible Critical Periods or Operational Flow Orders.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/15/2026 11:31:49 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/15/2026 11:31:00 AM
Notice Type Desc :
Operational Alert
Notice Effective Date/Time :
07/15/2026 12:00:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
Notice ID :
5038424
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
System Wide Alert - Limited Operational Flexibility
Notice Text :
Gulf South Pipeline Company, LLC (“Gulf South”) has limited operational flexibility. As such,
effective 7/15/2026 at 12:00 PM, Gulf South is informing shippers that it cannot manage shipper
imbalances on the Expansion and Legacy systems, given the firm transmission demands that are
expected on the system during this time period.
Therefore, Gulf South, requests that all shippers balance their transportation and/or storage
contracts by conforming receipts into the system with the deliveries being taken from the system,
and to receive and deliver quantities at a Uniform Hourly Rate of Flow, pursuant to General Terms
and Conditions (“GT&C”) Sections 6.2 [1] and 6.12 of Gulf South’s FERC Gas Tariff (“Tariff”) and
the applicable firm rate schedules. As described in the GT&C Section 6.2[1], Gulf South requires
that the hourly rate of flow conform to a uniform rate during this constrained period, in
response to these current system conditions. Without correction to shippers’ imbalance usage and
flow rates, Gulf South will be required to implement an operational plan pursuant to the GT&C
Section 6.18 of the Tariff.
If shippers do not voluntarily comply with these provisions, the pipeline may be required to
declare a Critical Period or issue an Operational Flow Order, which could result in penalties for
shippers, pursuant to GT&C Section 6.18 of the Tariff.
Shippers should monitor the pipeline’s Informational Postings website for further updates and any
notice(s) regarding possible Critical Periods or Operational Flow Orders.
If you have any questions, please contact your customer service representative.
07/15/2026 11:31:49 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038437
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-16T16:59:00+00:00
Effective: 2026-08-25T09:00:00+00:00
End: 2026-09-29T09:00:00+00:00
Subject: Carthage Compressor Station Maintenance
Gulf South Pipeline Notice 5038437
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038437
Prior Notice :
5038329
Reqrd Rsp Desc :
No response required
Subject :
Carthage Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/16/2026 04:59:00 PM
Notice Effective Date/Time :
08/25/2026 09:00:00 AM
Notice End Date/Time :
09/29/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
---------------------------------------------------------------------
Updated Description:
---------------------------------------------------------------------
Gulf South will be performing maintenance at Carthage Compressor Station.
The following groups are subject to impact:
Carthage Compressor East Scheduling Group
Gas Day 8/25-8/28:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff."
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/16/2026 4:59:46 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/16/2026 04:59:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/25/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
09/29/2026 09:00:00 AM
Notice ID :
5038437
Response Date/Time :
Prior Notice :
5038329
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Carthage Compressor Station Maintenance
Notice Text :
Updated Description:
---------------------------------------------------------------------
Updated Description:
---------------------------------------------------------------------
Gulf South will be performing maintenance at Carthage Compressor Station.
The following groups are subject to impact:
Carthage Compressor East Scheduling Group
Gas Day 8/25-8/28:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff."
If you have any questions, please contact your customer service representative.
07/16/2026 4:59:46 PM
Page 1 of 1
Twin Tier Pipeline
[CAPACITY CONSTRAINT] NORTHERN BORDER HARPER-PRIM ONLY LIFT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
08/20/26
Subject: Subject: Assessment of Extreme Condition 7/14/26 – 7/16/26 with Extreme Condition Penalty Waiver
Author: Author: T0001027
Notice Text
Recent extreme weather conditions led ANR Pipeline (ANR) to declare an Extreme Condition Situation (Extreme Condition) as defined in the General Terms and Conditions (GT&C) §6.1 of ANR’s FERC Gas Tariff (Tariff) for 7/14/26 – 7/16/26. The Extreme Condition was applicable in ANR's ML2, ML3, and ML7 zones. In accordance with ANR's Tariff, the Swing Percentage (as defined in ANR's Tariff GT&C §6.1) was lowered from 10% to 5% in those zones during the Extreme Condition.
As part of the Extreme Condition posting, ANR shippers were directed to ensure adequate supply was nominated and simultaneously flowing and maintain a uniform hourly flow unless contractually allowed to use an alternate hourly flow.
ANR carefully monitors and assesses shipper activities during Extreme Condition periods and is pleased to report that shipper compliance strongly contributed to our success in preserving system integrity and meeting scheduled delivery commitments during this Extreme Condition period. We are, as always, grateful for your spirit of teamwork and cooperation.
Accordingly, ANR is waiving its higher Extreme Condition Daily Scheduling Penalties and Unauthorized Overrun Service penalties pursuant to Section 6.18.13 of its Tariff. Extreme Condition penalty rates would have been "the greater of ten dollars ($10.00) or two (2) times the Spot Price Index for the Service Month" as described in ANR's Tariff under applicable rate schedules, subject to allocation rules set in place at each delivery location. This waiver is not an indication of future waivers. Each Extreme Condition will be evaluated independently.
All penalty waivers are posted at www.tceconnects.com, Informational Postings, Other, Penalty Waiver Log.
To clarify, non-critical penalties will apply for the time period above as they do every day across the ANR system. Details on non-critical penalty rates can be found under applicable rate schedules in ANR's Tariff. Please refer to your preliminary invoices or reach out to your ANR Customer Service Representative or Account Coordinator with questions about your specific penalty exposure.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26087023
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
07/25/26
Subject: Subject: UPDATED CAPACITY REDUCTION Southwest Area
Author: Author: T0001027
Notice Text
Since the last posting, ANR has updated the dates and capacity impact at Barnitz Creek (LOC #513128) in the Southwest Area in Custer, Oklahoma. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
7/13 – 7/24 EG Hill Northbound (LOC #FPEGHLNB): 19 MMcf/d (leaving 196 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/24 Mooreland Northbound (LOC #FPMORLNB): 18 MMcf/d (leaving 188 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/24 Custer Northbound (LOC #FPCSTRNB): 4 MMcf/d (leaving 36 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
0% - Based on the Current Contracted MDQ
7/13 – 7/17 Red River Interconnect (LOC #185837): 125 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/20 – 7/24 Kizer Creek (LOC #513106): 160 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/21 – 7/23 (previously 7/20 - 7/24) Barnitz Creek (LOC #513128): 86 MMcf/d (leaving 30 MMcf/d) (previously shut in)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
23% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Algonquin Gas Transmission
07/20/2026- AGT Customer Specific Operational Flow Order -- EFF 7/20
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Customer Specific Operational Flow Order -- EFF 7/20
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 10/18/2026
Posting Date: 07/20/2026
Notice Identifier: 180651
Required Response Indicator Description: No response required
Operational Area
Gas Day July 19
Gas Day July 20 and until further notice
System Wide - All Customers
No OFO*
NO OFO*
Customer Specific
No OFO*
OFO in Effect: No DS 2% / 100
Hourly Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
08/20/26
Subject: Subject: CAPACITY POSTING - TIM for July 21, 2026
Author: Author: Tom Koontz
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
* 4166 – CITY OF GALLATIN - * 0
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Update - Market and Production Constraints
Posted: 07/20/2026 07:05:54 AM
Notice ID: 17076106
Notice 17076106
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/20/2026
Notice Eff Time:
07:05:54 CDT
Notice End Date:
Notice End Time:
Notice ID:
17076106
Notice Stat Desc:
Supersede
Notice Type Desc:
Constraint
Post Date:
07/20/2026
Post Time:
07:05:54 CDT
Prior Notice:
17033639
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Update - Market and Production Constraints
The available capacity listed below in each section will become effective
July 21, 2026
. Changes from the previous gas day are highlighted in
bold
.
The following chart reflects the quantity of available transportation capacity including Primary, Non-Secondary Reverse Path (NSRP), Secondary Firm, and Interruptible at various Throughput Section Boundary (TSB) locations or segment constraints. These TSBs are identified as receipt or delivery based.
Maintenance TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
Job #
9012663
Compressor Station 160
5
Del
M-L
1,726
PRIMARY
N-S
327549
9011480
Sta 40 MP 389.19 S to N
2
Rec
M-L
534
PRIMARY
S-N
249679
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
System TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
9011140
Mainline MP 438.84
2
Rec
L
709
PRIMARY
S to N
9000000
Compressor Station 60 MP 588.62
3
Rec
Loc
200
NSRP
S to N
9011460
SWLA Lat N to S MP 1.0
2
Del
L
40
NSRP
N to S
9011260
SELA N to S MP 85.93
3
Rec
L
0
PRIMARY
N to S
9011261
SELA S to N MP 85.94
3
Rec
L
0
PRIMARY
S to N
9001620
Mobile Bay Lat South Asc MP 20
4A
Del
L
25
NSRP
N to S
5000048
TSB MP 1412.98 to MP 1369.45
5
Del
S
0
NSRP
N to S
1001280
S Virginia Lat Sta 167 MP 69.12
5
Del
L
0
SECONDARY
N to S
5000033
TSB MP 1413.00 to MP 1519.92
5
Del
S
200
NSRP
N to S
5000039
TSB MP 1519.93 to MP 1586.30
5
Del
S
200
NSRP
N to S
5000040
TSB MP 1586.30 to 1674.56
5,6
Del
S
200
NSRP
N to S
9010778
Central Penn South N to S TSB MP 1.00
6
Del
L
0
SECONDARY
N to S
9008342
Marcus Hook Lateral TSB MP 1.10
6
Del
L
200
SECONDARY
N to S
9012063
Marcus Hook Lateral TSB MP 18.71
6
Del
L
OPEN
N to S
9008343
Trenton Woodbury Lateral TSB MP 1.00
6
Del
L
200
SECONDARY
N to S
9007422
Station 207 Lower Bay Lateral MP 8.57
6
Del
L
447
SECONDARY
W to E
9008482
NY Bay Lateral MP 35.00
6
Del
L
0
SECONDARY
W to E
9008866
Mainline Milltown MP 1790.85
6
Del
L
0
NSRP
S to N
1001300
Linden MP 1808.191
6
Del
L
50
NSRP
S to N
9010838
Rivervale Lat. North NJ Ext. MP 19.0
6
Rec
L
0
SECONDARY
N to S
9010459
Central Penn Line North N to S MP 1.00
6
Rec
L
1,112.4
PRIMARY
N to S
9007462
Leidy Station 517 W MP 127.949
6
Del
L
400
NSRP
E to W
9007463
Leidy Station 520 W MP 170.389
6
Del
L
400
NSRP
E to W
9008462
Leidy Line West End MP 205.00
6
Del
L
400
NSRP
E to W
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
Location TSB (L); Segment TSB (S); Maintenance Location TSB (M-L)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc/Seg ID
HBLV Location/Segment Constraint
Zone
Type of HBLV
Available Swing Mdt/d
Highest Priority Included
5000027
Zone 1 Segment
1
S
1
Secondary
5000028
Zone 2 Segment
2
S
0
Secondary
5000029
Zone 3 Segment
3
S
0
Secondary
5000030
Zone 4 Segment
4
S
0
Secondary
5000031
Zone 5 Segment
5
S
0
Secondary
5000032
Zone 6 Segment
6
S
0
Secondary
Location (L); Segment (S)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc ID
Location Name
Zone
Del/Rec
Single Point or Group
Available Capacity Mdt/d
1005046
Duralde M2856
3
Rec
L
460
9003442
Pine Prairie Stg
3
Rec
L
900
9003442
Pine Prairie Stg
3
Del
L
***
1006218
Ragley Trunkline
3
Rec
L
350
9010378
TOD Leidy West Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9010379
TOD Leidy East Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9007682
Leidy Line Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9001342
Martins Creek #3
6
Rec
L
43
1006561
Algonquin - Ctr M4402
6
Del
L
135**
9007962
Raceland I/C
3
Del
L
40
1004123
Terrebonne Sta 62 I/C
3
Del
L
85
1006304
Vinton FGT Meter 4381
2
Del
L
0
9002300
POOLE ROAD
1
Del
L
80
Location (L); Aggregate of Locations (G)
Leidy Aggregate Receipts consist of: Puddlefield, Carverton and Chapin
Markham Aggregate Deliveries consist of: Markham Channel, Markham Valero, Markham SW #1, and Poole Road
TOD Leidy West consists of: Puddlefield, Carverton and Chapin
TOD Leidy East consists of: Puddlefield, Carverton and Chapin
** Non-Traditional and Lower Priorities
*** Delivery qty. available only by displacement of scheduled receipt qty.
To the extent that the total nominated quantities or requested HBLV quantities exceed the available capacity/swing in the charts identified above, Transco will adjust these quantities based on its priority of service, in accordance with the General Terms and Conditions of Transco's FERC Gas Tariff.
This information is provided as a summary of significant information that coincides with information currently available under Transco's Operational Capacity report and is intended to provide customers with an easy reference source. Transco may be required to institute capacity restrictions at locations or in segments other than those identified above if operational conditions dictate. As operational conditions change, Transco will provide notice, via 1Line, of any additional segments or locations where transportation services or HBLVs may be limited and of any changes in available capacity in any of the identified areas.
If you have any questions, please contact your Commercial Services Representative.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 07/21/2026
Posting Date: 07/19/2026
Notice Identifier: 180646
Required Response Indicator Description: No response required
For Gas Day July 20, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
32%
Planned Outage
Five Points South
N/A
100%
29%
Lebanon
N/A
100%
17%
Lebanon Lateral
Yes
Batesville South
N/A
100%
72%
Access Area
Union Church South
N/A
100%
32%
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
16%
Bald Knob North
N/A
100%
100%
100%
100%
100%
Planned Outatge
Deliveries to the Castor Line
N/A
100%
34%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
61%
Gillis North
N/A
100%
64%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24 and M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/19/2026- ETNG Pipeline Conditions for 7/20/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 07/21/2026
Posting Date: 07/19/2026
Notice Identifier: 180644
Required Response Indicator Description: No response required
For Gas Day July 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 07/21/2026
Posting Date: 07/19/2026
Notice Identifier: 180645
Required Response Indicator Description: No response required
For Gas Day July 20, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
59%
Planned Outage
Cromwell
100%
100%
61%
Planned Outage
Burrillville
100%
100%
87%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
61%
Iroquois Receipts
100%
100%
40%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
46%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
21%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/19/2026- NEXUS Pipeline Conditions for 7/20/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 07/21/2026
Posting Date: 07/19/2026
Notice Identifier: 180620
Required Response Indicator Description: No response required
For Gas Day July 20, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/19/2026
Notice End Date: 07/20/2026
Posting Date: 07/18/2026
Notice Identifier: 180616
Required Response Indicator Description: No response required
For Gas Day July 19, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
32%
Planned Outage
Five Points South
N/A
100%
29%
Lebanon
N/A
100%
17%
Lebanon Lateral
Yes
Batesville South
N/A
100%
72%
Access Area
Union Church South
N/A
100%
32%
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
16%
Bald Knob North
N/A
100%
100%
100%
100%
100%
Planned Outatge
Deliveries to the Castor Line
N/A
100%
34%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
61%
Gillis North
N/A
100%
65%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24 and M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/18/2026- NEXUS Pipeline Conditions for 7/19/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/19/2026
Notice End Date: 07/20/2026
Posting Date: 07/18/2026
Notice Identifier: 180613
Required Response Indicator Description: No response required
For Gas Day July 19, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/18/2026- ETNG Pipeline Conditions for 7/19/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/19/2026
Notice End Date: 07/20/2026
Posting Date: 07/18/2026
Notice Identifier: 180614
Required Response Indicator Description: No response required
For Gas Day July 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/19/2026
Notice End Date: 07/20/2026
Posting Date: 07/18/2026
Notice Identifier: 180615
Required Response Indicator Description: No response required
For Gas Day July 19, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
80%
Planned Outage
Cromwell
100%
100%
62%
Planned Outage
Burrillville
100%
100%
84%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
61%
Iroquois Receipts
100%
100%
40%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
46%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
20%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038442
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-18T15:16:00+00:00
Effective: 2026-07-18T15:18:00+00:00
End: 2026-07-19T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
Gulf South Pipeline Notice 5038442
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038442
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 24329 Stratton
Ridge to Freeport LNG
TSP :
078444247
Post Date/Time :
07/18/2026 03:16:00 PM
Notice Effective Date/Time :
07/18/2026 03:18:00 PM
Notice End Date/Time :
07/19/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 7/18/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
Gulf South Pipeline Company, LLC
Notice
Page 1 of 1
07/18/2026 3:16:27 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/18/2026 03:16:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/18/2026 03:18:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/19/2026 09:00:00 AM
Notice ID :
5038442
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 24329 Stratton
Ridge to Freeport LNG
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 7/18/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
Gulf South Pipeline Company, LLC
07/18/2026 3:16:27 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/18/2026
Notice End Date: 07/19/2026
Posting Date: 07/17/2026
Notice Identifier: 180568
Required Response Indicator Description: No response required
For Gas Day July 18, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
32%
Planned Outage
Five Points South
N/A
100%
29%
Lebanon
N/A
100%
17%
Lebanon Lateral
Yes
Batesville South
N/A
100%
73%
Access Area
Union Church South
N/A
100%
32%
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
17%
Bald Knob North
N/A
100%
100%
100%
100%
100%
Planned Outatge
Deliveries to the Castor Line
N/A
100%
34%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
61%
Gillis North
N/A
100%
64%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24 and M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/17/2026- ETNG Pipeline Conditions for 7/18/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/18/2026
Notice End Date: 07/19/2026
Posting Date: 07/17/2026
Notice Identifier: 180586
Required Response Indicator Description: No response required
For Gas Day July 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038441
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-17T17:21:00+00:00
Effective: 2026-07-18T15:25:00+00:00
End: 2026-08-15T09:00:00+00:00
Subject: Maintenance- Eunice Compressor Station
Texas Gas Transmission Notice 5038441
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038441
Prior Notice :
5038426
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
TSP :
115972101
Post Date/Time :
07/17/2026 05:21:00 PM
Notice Effective Date/Time :
07/18/2026 03:25:00 PM
Notice End Date/Time :
08/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update the Notice Text to state that Locations 9473 & 9493 are increasing -see
notice text below beginning July 18th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 160,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 140,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Notice
Page 1 of 2
07/17/2026 5:21:29 PM
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
Page 2 of 2
07/17/2026 5:21:29 PM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/17/2026 05:21:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/18/2026 03:25:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/15/2026 09:00:00 AM
Notice ID :
5038441
Response Date/Time :
Prior Notice :
5038426
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
Notice Text :
Superseding to update the Notice Text to state that Locations 9473 & 9493 are increasing -see
notice text below beginning July 18th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 160,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 140,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
07/17/2026 5:21:29 PM
Page 1 of 2
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
07/17/2026 5:21:29 PM
Page 2 of 2
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038439
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-17T15:43:00+00:00
Effective: 2026-07-17T15:45:00+00:00
End: 2026-07-18T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
Gulf South Pipeline Notice 5038439
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038439
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 24329 Stratton
Ridge to Freeport LNG
TSP :
078444247
Post Date/Time :
07/17/2026 03:43:00 PM
Notice Effective Date/Time :
07/17/2026 03:45:00 PM
Notice End Date/Time :
07/18/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 7/17/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
Gulf South Pipeline Company, LLC
Notice
Page 1 of 1
07/17/2026 3:43:50 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/17/2026 03:43:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/17/2026 03:45:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/18/2026 09:00:00 AM
Notice ID :
5038439
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 24329 Stratton
Ridge to Freeport LNG
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 7/17/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
Gulf South Pipeline Company, LLC
07/17/2026 3:43:50 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26092016
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/17/26
07/17/26
08/17/26
Subject: Subject: UPDATE: Line 1758 Pipeline Maintenance
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gas Transmission, LLC (TCO) notifies customers that pipeline maintenance on Line 1758 is ongoing. Based on current operating conditions, including forecasted mild temperatures and reduced market demand, TCO anticipates a reduction to firm nominations through the following Internal Constraints may become necessary as early as Gas Day Tuesday, July 21, 2026:
ARTEMAS - Artemas MA25
CLENWAYN - Clendenin to Waynesburg MA35
LONEOAKA - Lone Oak A MA41
SHERWODA - Sherwood A MA42
Reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 38 of TCO’s FERC Gas Tariff (“Tariff”). However, TCO will only issue RCCs if TCO is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day average usage quantity less any scheduled quantities on the contract.
Please contact your Customer Services Representative with any questions.
***Previous Posting***
Columbia Gas Transmission, LLC (TCO) reminds customers of upcoming pipeline maintenance on Line 1758 beginning Wednesday, July 8, 2026, through Tuesday, September 15, 2026
Based on forecasted operating conditions, TCO does not currently anticipate any reduction to firm nominations during the maintenance; however, firm reductions at the following locations may become necessary:
640496 – Range - Day
642452 – CMG Majorsville
642569 – Mojo
642854 – Kryptonite
Customers are encouraged to monitor the Construction and Maintenance Schedule for any non-firm impacts and the Daily Capacity Posting for specific capacity settings each day of the outage.
Reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 38 of TCO’s FERC Gas Tariff (“Tariff”). However, TCO will only issue RCCs if TCO is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day average usage quantity less any scheduled quantities on the contract. By means of this notice, TCO is establishing which specific Gas Days will be included when determining a shipper’s 7-day average usage quantity pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
Natural Gas Pipeline (NGPL)
[OPERATIONAL ALERT] SEG 3/4 - M&M LINE - PIPE INTEG
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/17/26
07/17/26
08/17/26
Subject: Subject: CAPACITY POSTING - TIM for July 18, 2026 through July 20, 2026
Author: Author: John Whited
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Cameron LNG Feed
[OPERATIONAL FLOW ORDER] OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-18
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/17/2026 6:54:22AM Notice End Date/Time: 07/18/2026 9:00:00am
Post Date/Time: 7/17/2026 6:54:22 AM Notice ID: 402861
Reqrd Rsp: 1 Rsp Date/Time: 7/17/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402753
Subject: OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-18
Notice Text:
OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-18-2026
In order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Saturday, July 18, 2026 Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is LIFTING the current OFO Daily Critical Day (“CD”) 1 for all areas East of STA 245 and IMPLEMENTING an OFO Daily Critical Day 1 for overtakes and under deliveries on the 500 Line as well as IMPLEMENTING an OFO Daily Critical Day 1 for undertakes and over deliveries from STA 1 to STA 40 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
This OFO will be effective for LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-17-26
GD 7-18-26 and until further notice
Zone 0
No OFO
Critical Day 1
100 Line Only
(Includes Segments 101, 109, 117, 125, 132 Only)
· Receipts do not overdeliver
· Deliveries do not undertake
Zone L
No OFO
Critical Day 1
500 Line Only
(Includes Segments 527, 529, 530 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 1
No OFO
Critical Day 1
500 Line Only
(Includes Segments 534, 539 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 2
No OFO
No OFO
Zone 3
No OFO
No OFO
Zone 4
No OFO
No OFO
Zone 5
Critical Day 1
All Areas East of STA 245 Only
· Receipts do not underdeliver
· Deliveries do not overtake
NO OFO
Zone 6
Critical Day 1
All areas on the 200 Line Only
· Receipts do not underdeliver
· Deliveries do not overtake
NO OFO
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/17/2026
Notice End Date: 07/18/2026
Posting Date: 07/16/2026
Notice Identifier: 180525
Required Response Indicator Description: No response required
For Gas Day July 17, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
23%
Planned Outage
Five Points South
N/A
100%
17%
Lebanon
N/A
100%
18%
Lebanon Lateral
Yes
Batesville South
N/A
100%
85%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
19%
Bald Knob North
N/A
100%
100%
100%
100%
100%
Planned Outatge
Deliveries to the Castor Line
N/A
100%
41%
Huntsville North
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
57%
Gillis North
N/A
100%
62%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24 and M2-24, issued 7/17/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3.
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones M1-30, M2-30 and M3 are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/16/2026- ETNG Pipeline Conditions for 07/17/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/17/2026
Notice End Date: 07/18/2026
Posting Date: 07/16/2026
Notice Identifier: 180519
Required Response Indicator Description: No response required
For Gas Day July 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
100%
100%
Planned Outage
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/16/2026- AGT Pipeline Conditions for 07/17/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/17/2026
Notice End Date: 07/18/2026
Posting Date: 07/16/2026
Notice Identifier: 180524
Required Response Indicator Description: No response required
For Gas Day July 17, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
87%
Planned Outage
Cromwell
100%
100%
65%
Planned Outage
Burrillville
100%
100%
100%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
64%
Iroquois Receipts
100%
100%
54%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
35%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
19%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/17/2026
Notice End Date: 07/18/2026
Posting Date: 07/16/2026
Notice Identifier: 180517
Required Response Indicator Description: No response required
For Gas Day July 17, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Tryon Lateral Unplanned Immediate Digs 2026 Planned Outage and Maintenance Summary
Posted: 07/16/2026 11:59:47 AM
Notice ID: 17064967
Notice 17064967
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/16/2026
Notice Eff Time:
11:59:47 CDT
Notice End Date:
Notice End Time:
Notice ID:
17064967
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/16/2026
Post Time:
11:59:47 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Tryon Lateral Unplanned Immediate Digs 2026 Planned Outage and Maintenance Summary
Due to findings from the integrity assessment associated with Job #1211808 performed on the Tryon Lateral (located near Station 140) in April 2026, Transco must immediately reduce pressure on the lateral to address certain identified anomalies. During this unplanned maintenance, the below meters will experience lower than normal pressures.
Location Name
Meter #
Location Type
Mill Springs
7225
Del
Columbus
7229
Del
Tryon
7227
Del
Greer Landrum
7326
Del
Inman
7221
Del
West Startex
7294
Del
Transco will coordinate directly with impacted customers as work progresses and more information becomes available. The date for return to normal operations will be determined based upon field assessments.
If you have any questions, please contact your Transportation Services Representative.
Natural Gas Pipeline (NGPL)
[CAPACITY CONSTRAINT] FGT VERM (LOC 7936) - PRIM ONLY LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Supersede
Prior Notice: 26108008
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/16/26
07/16/26
07/18/26
Subject: Subject: UPDATED: Notice of Phase 2 Warm Weather Operational Conditions & OFO Watch (ML2, ML3, & ML7)
Author: Author: T0001375
Notice Text
Since the previous posting, ANR has revised Notice #26108008. The Phase 2 Warm Weather Operational Conditions & OFO Watch (Fuel Segment ML2, ML3, & ML7) is still in effect for 7/16/26. The Phase 2 will be lifted effective tomorrow 7/17/26.
Please note that Phase 1 Critical Notice #26092038 and any notices superseding #26092038 (collectively "Critical Notice #26092038"), is still in effect for all remaining areas.
*Previous posting*
Notice of Warm Weather Operational Conditions Phase 2, Effective 7/14/26 through 7/17/26
Effective for gas day 7/14/2026 through end of gas day 7/17/2026, in order to preserve system integrity and to ensure ANR is able to meet scheduled delivery commitments to all of fuel segments ML2, ML3, and ML7; ANR is, in accordance with the General Terms and Conditions, declaring an "Extreme Condition" as that term is defined in ANR's FERC Gas Tariff §6.1, lowering the Swing Percentage from 10% to 5%.
Please note that Phase 1 Critical Notice #26092038 and any notices superseding #26092038 (collectively "Critical Notice #26092038"), is still in effect for all remaining areas.
ANR is requesting, in accordance with §6.6.4 of its FERC Gas Tariff, that all receipt and delivery services, excluding ETS and FTS-3 delivery services, to be at a uniform hourly flow rate over a twenty-four (24) hour period. Rate Schedule FTS-3 shippers are required to be at their contractually agreed upon hourly rate.
All Rate Schedule ETS shippers with an aggregated ETS Delivery Point Group must comply with this posting at the ETS Delivery Point Group level. ETS shippers are restricted to the lower of 1/16th of the respective Delivery Point MDQ, or the contractually agreed upon hourly rate in their Service Agreement at the ETS Delivery Point Group level.
Requests for interruptible and overrun services including ANR's hourly ITS-3 service will be evaluated on a case-by-case basis. Scheduled flows for these interruptible services must also be at a uniform hourly rate over a twenty-four (24) hour period or for ITS-3 service the hourly flow rate will be the rate of the nominated, approved, and scheduled quantity. ANR is also reminding all MBS shippers that volumes not within operating tolerances and not at a uniform hourly flow rate of 1/24th of scheduled nominations will not be permitted.
In addition, ANR is closely monitoring "Unauthorized Overrun" under Rate Schedules FTS-1, FTS-2, FTS-3, FTS-4, FTS-4L, STS, and ETS. Please refer to ANR's FERC Gas Tariff under each rate schedule for further detail and elevated penalties in effect during an "Extreme Condition Situation". Shippers attempting to deliver gas via Unauthorized Overrun may be subject to an "express order to Shipper to cease and desist" and a shipper specific OFO.
ANR reserves the right to revoke any conditionally approved operational flexibility.
Customers requesting short-notice start-up are expected to provide corresponding supply into ANR later in the Gas Day. For customers without the short-notice startup provision in their transportation agreement, requests for a short-notice startup will be evaluated a case-by-case basis.
ANR is NOT declaring an Operational Flow Order (OFO) at this time but is providing Advance Warning to shippers (per §6.8.7 of its FERC Gas Tariff) that this weather event could create the need for ANR to issue an OFO with no additional prior notice to protect system integrity. Actions that may be necessary include, but are not limited to, further curtailing interruptible services, declining to schedule firm secondary nominations, and issuing an offending Shipper specific OFO, or issuing a non-Shipper specific OFO. ANR will continue to monitor system integrity closely and will update the EBB as required.
As a reminder, The Projected Hourly Consumption Forecast (Burn Sheet) for the power plant operations is required to be submitted to ANR prior to any flow or flow changes.
ANR will continue to monitor the system integrity closely and will update this posting as required.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline Limited Partnership (Canada)
Subject: MNCA Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/14/2026
Posting Date: 07/16/2026
Notice Identifier: 180502
Prior Notice Identifier: 180385
Required Response Indicator Description: No response required
Notice Text:
Maritimes & Northeast Canada (MNCA) has limited operational flexibility to manage imbalances. Effective 9:00 AM CCT, July 17, 2026, MNCA requires all shippers and point operators to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position.
Correspondingly, Effective 9:00 AM CCT, July 17, 2026, the previously posted imbalance notice is no longer in effect.
Shippers are required to coordinate any imbalance payback through MNCA's account representative and actual payback quantities may be limited depending on system operations and conditions.
If necessary, MNCA will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
This imbalance notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/14/2026
Posting Date: 07/16/2026
Notice Identifier: 180501
Prior Notice Identifier: 180384
Required Response Indicator Description: No response required
Notice Text:
Maritimes & Northeast (M&N) has limited operational flexibility to manage imbalances. Effective 9:00 AM CCT, July 17, 2026, M&N requires all shippers and point operators to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position.
Correspondingly, effective 9:00 AM CCT, July 17, 2026, the previously posted imbalance notice is no longer in effect.
Shippers are required to coordinate any imbalance payback through M&N's account representative and actual payback quantities may be limited depending on system operations and conditions.
Additionally, M&N continues to require all Power Plant Operators to provide information mandated by FERC Order No. 698 until further notice. Information required includes the hourly consumption profile of directly connected power generation facilities.
If necessary, M&N will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
This notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/16/26
07/16/26
08/16/26
Subject: Subject: REVISED: CAPACITY POSTING - TIM for July 17, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
***Revised Posting to include taking Smithfield Internal Constraint to 0 Non-Firm***
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
* LONEOAKB - Lone Oak B MA41 - * 0
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
* SMITHFLD - Smithfield MA35 - * 0
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
* WAYNESNO - Waynesburg North MA35 - * 0
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 07/17/2026
Posting Date: 07/15/2026
Notice Identifier: 180482
Required Response Indicator Description: No response required
For Gas Day July 16, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
82%
Leidy Line Receipts
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
17%
Planned Outage
Five Points South
N/A
100%
23%
Lebanon
N/A
100%
13%
Lebanon Lateral
Yes
Batesville South
N/A
100%
71%
Access Area
Union Church South
N/A
100%
21%
New Roads South
N/A
100%
100%
White Castle South
N/A
100%
100%
Longview North
N/A
100%
53%
Deliveries to the Castor Line
N/A
100%
46%
Huntsville North
Yes
Speaks South
N/A
100%
Angleton West
N/A
100%
63%
Gillis North
N/A
100%
52%
West Gillis 1
N/A
100%
56%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M2-24, M2-30 and M3, issued 7/14/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- UPDATE
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/13/2026
Posting Date: 07/15/2026
Notice Identifier: 180466
Prior Notice Identifier: 180386
Required Response Indicator Description: No response required
Zone
Gas Day July 15 and July 16
Gas Day July 17 and until furth notice
M1-24"
No OFO*
OFO In Effect: No Due Pipe 5% / 500
M1-30"
No OFO*
No OFO*
M2-24"
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
M2-30"
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
East Tennessee Natural Gas
07/15/2026- ETNG Pipeline Conditions for 07/16/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 07/17/2026
Posting Date: 07/15/2026
Notice Identifier: 180473
Required Response Indicator Description: No response required
For Gas Day July 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Transco
Station 610 & Central Penn Line South (Jobs 1211835 & 459274) 2026 Planned Outage Maintenance Summar
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Station 610 & Central Penn Line South (Jobs 1211835 & 459274) 2026 Planned Outage Maintenance Summar
Posted: 07/15/2026 01:12:06 PM
Notice ID: 17062172
Notice 17062172
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/15/2026
Notice Eff Time:
13:12:06 CDT
Notice End Date:
Notice End Time:
Notice ID:
17062172
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/15/2026
Post Time:
13:12:06 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Station 610 & Central Penn Line South (Jobs 1211835 & 459274) 2026 Planned Outage Maintenance Summar
Transco will be performing necessary maintenance associated with Jobs 1211835 & 459274 on its 2026 Planned Outage and Maintenance Summary. Transco will be running two inline inspection tools on the Central Penn Line South
.
These runs are a part of an integrity assessment normally completed on a 7-year interval. Additionally, Transco will be performing a turbine exchange on Main Unit 3 at Station 610. These maintenance activities will impact the availability of primary firm transportation services moving north to south on Central Penn Line South. The current schedule for this maintenance is
Tuesday, 08/18/2026
through
Friday, 08/28/2026
. Specific dates of the actual pig runs are provided below.
Pig Runs
Dates
Gauge Tool
08/18
Combo Tool
08/20
Station 610
Dates
Main Unit 3
08/18 – 08/28
The below Throughput Section Boundary (TSB) will be used to manage capacity availability during this planned work. An updated Market and Production constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name- Location
Location ID
Flow Direction
CPLS N TO S TSB MP 1.0
9010778
N to S
Estimated Outage
Design Capacity (Mdt/d)
Total Primary Firm Qty Available (Mdt/d)
%Cuts (Primary)-Potential Shipper Impact (Based on Historical Utilization)
08/18 (Gauge Tool Run)
2,328
2,093
0-8%
08/19
2,328
2,093
0-8%
08/20 (Smart Tool Run)
2,328
1,400
35-40%
08/21 thru 08/28
2,328
2,093
0-8%
*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
Gulf South Pipeline
System Management Plan – Location 24329 Stratton Ridge (to Freeport LNG)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038422
Notice Type: Operational Alert/System Management Plan
Status: Initiate
Posted: 2026-07-15T07:57:00+00:00
Effective: 2026-07-15T08:00:00+00:00
End: 2026-07-16T09:00:00+00:00
Subject: System Management Plan – Location 24329 Stratton Ridge (to Freeport LNG)
Gulf South Pipeline Notice 5038422
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Operational Alert/System Management Plan
Notice Stat Desc :
Initiate
Notice ID :
5038422
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
System Management Plan – Location 24329 Stratton Ridge
(to Freeport LNG)
TSP :
078444247
Post Date/Time :
07/15/2026 07:57:00 AM
Notice Effective Date/Time :
07/15/2026 08:00:00 AM
Notice End Date/Time :
07/16/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 024329 – STRATTON RIDGE
(TO FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (Gulf South) is unable to
flow quantities at Location SLN 024329. Gulf South is implementing the System Management Plan,
pursuant to Section 6.18[5] of Gulf South’s FERC NGA Gas Tariff.
Gulf South is implementing the System Management Plan, pursuant to Section 6.18[5] of Gulf
South’s FERC NGA Gas Tariff. To protect the operational integrity of the pipeline, Gulf South is
unable to provide at least four (4) hours’ notice prior to the effective time of this notice.
Effective 07/15/2026 8:00 AM, scheduled quantities at Location SLN 024329 will be reduced to 0
Dth and nominations will be balanced for all affected customers and such customers must conform
receipts and deliveries to these quantities. Gulf South will continue to confirm nominations to 0
Dth at this location in subsequent nomination cycles until further notice.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/15/2026 7:57:52 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/15/2026 07:57:00 AM
Notice Type Desc :
Operational Alert/System Management Plan
Notice Effective Date/Time :
07/15/2026 08:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/16/2026 09:00:00 AM
Notice ID :
5038422
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
System Management Plan – Location 24329 Stratton Ridge
(to Freeport LNG)
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 024329 – STRATTON RIDGE
(TO FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (Gulf South) is unable to
flow quantities at Location SLN 024329. Gulf South is implementing the System Management Plan,
pursuant to Section 6.18[5] of Gulf South’s FERC NGA Gas Tariff.
Gulf South is implementing the System Management Plan, pursuant to Section 6.18[5] of Gulf
South’s FERC NGA Gas Tariff. To protect the operational integrity of the pipeline, Gulf South is
unable to provide at least four (4) hours’ notice prior to the effective time of this notice.
Effective 07/15/2026 8:00 AM, scheduled quantities at Location SLN 024329 will be reduced to 0
Dth and nominations will be balanced for all affected customers and such customers must conform
receipts and deliveries to these quantities. Gulf South will continue to confirm nominations to 0
Dth at this location in subsequent nomination cycles until further notice.
If you have any questions, please contact your customer service representative.
07/15/2026 7:57:52 AM
Page 1 of 1
East Tennessee Natural Gas
07/13/2026- ETNG Pipeline Conditions for 07/14/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 07/15/2026
Posting Date: 07/13/2026
Notice Identifier: 180399
Required Response Indicator Description: No response required
For Gas Day July 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/14/2026- ETNG Pipeline Conditions for 07/15/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/15/2026
Notice End Date: 07/16/2026
Posting Date: 07/14/2026
Notice Identifier: 180441
Required Response Indicator Description: No response required
For Gas Day July 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/15/2026
Notice End Date: 07/16/2026
Posting Date: 07/14/2026
Notice Identifier: 180445
Required Response Indicator Description: No response required
For Gas Day July 15, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Leidy Line Receipts
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
31%
Five Points South
N/A
100%
23%
Lebanon
N/A
100%
13%
Lebanon Lateral
Yes
Batesville South
N/A
100%
71%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
83%
White Castle South
N/A
100%
89%
Longview North
N/A
100%
62%
Deliveries to the Castor Line
N/A
100%
41%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
57%
Gillis North
N/A
100%
63%
West Gillis 1
N/A
100%
46%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M2-24, M2-30 and M3, issued 7/14/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/15/2026
Notice End Date: 07/16/2026
Posting Date: 07/14/2026
Notice Identifier: 180444
Required Response Indicator Description: No response required
For Gas Day July 15, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
95%
Planned Outage
Cromwell
100%
100%
66%
Planned Outage
Burrillville
100%
100%
99%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
57%
Iroquois Receipts
100%
100%
56%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
38%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
38%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 7/14/2026. 500 Dth / 5% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf Run Transmission
[Gulf Run Transmission] [Maintenance] Panola Unit 2 & 3 Planned Maintenance
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 66227
Notice Type: Maintenance
Subject: Panola Unit 2 & 3 Planned Maintenance
Posted: 2026-07-14 14:17:00.0
Effective: 2026-08-25 09:00:00.0
End Date:
Notice ID: 66227
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-07-14 14:17:00.0
Subject: Panola Unit 2 & 3 Planned Maintenance
Notice Effective Date/Time: 2026-08-25 09:00:00.0
Notice End Date/Time: 2026-11-30 00:00:00.0
Notice Text: This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Panola Compressor Station located in Panola County, Texas and in Gulf Run’s Zone 1. This planned maintenance is scheduled to occur on Tuesday, August 25th, 2026 through Saturday, August 29th, 2026 at 09:00. During this planned maintenance: · Panola will be limited to an estimated throughput capacity of 1,000,000 dth/d · Point Operators located in the impacted area will experience higher pressures. Gulf Run will evaluate nominations, on a case by case basis, based on daily operations to alleviate impacts to the extent possible. During this planned maintenance, shippers should nominate from their contractual MRO location to their contractual MDO location to reduce risk of scheduling reductions. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Gulf Run Transmission
[Gulf Run Transmission] [Maintenance] Panola Unit 1 Planned Maintenance
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 66228
Notice Type: Maintenance
Subject: Panola Unit 1 Planned Maintenance
Posted: 2026-07-14 14:21:00.0
Effective: 2026-09-01 21:00:00.0
End Date:
Notice ID: 66228
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-07-14 14:21:00.0
Subject: Panola Unit 1 Planned Maintenance
Notice Effective Date/Time: 2026-09-01 21:00:00.0
Notice End Date/Time: 2026-12-05 00:00:00.0
Notice Text: This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Panola Compressor Station located in Panola County, Texas and in Gulf Run’s Zone 1. This planned maintenance is scheduled to occur on Tuesday, September 1st, 2026 through Friday, September 4th, 2026 at 09:00. During this planned maintenance: · Panola will be limited to an estimated throughput capacity of 1,000,000 dth/d · Point Operators located in the impacted area will experience higher pressures. Gulf Run will evaluate nominations, on a case by case basis, based on daily operations to alleviate impacts to the extent possible. During this planned maintenance, shippers should nominate from their contractual MRO location to their contractual MDO location to reduce risk of scheduling reductions. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Columbia Gas Transmission (TCO)
Line 1711 Pipeline Maintenance, July 21 – August 17, 2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/14/26
07/14/26
08/14/26
Subject: Subject: Line 1711 Pipeline Maintenance, July 21 – August 17, 2026
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gas Transmission, LLC (TCO) reminds customers of maintenance on Line 1711 beginning Tuesday, July 21, 2026, through Monday, August 17, 2026. As a result, the following restrictions will begin effective Timely Cycle Gas for Day Tuesday, July 21, 2026;
630009 – ECA MKTG-TOBIAS – 0 Total Capacity
642585 – Hurd – 0 Total Capacity
TCO encourages customers to reference the Construction and Maintenance Schedule and the Daily Capacity Posting for any non-firm adjustments related to this maintenance.
Reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 38 of TCO’s FERC Gas Tariff (“Tariff”). However, TCO will only issue RCCs if TCO is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day average usage quantity less any scheduled quantities on the contract. By means of this notice, TCO is establishing which specific Gas Days will be included when determining a shipper’s 7-day average usage quantity pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
Enable Gas Transmission (EGT)
[Enable Gas Transmission (EGT)] [Force Majeure] LINE S FMJ_TERMINATION
SEV 3/5
RestorationUntil Further Notice
EGT is terminating Force Majeure notice #6469 effective July 15, 2026 at 09:00 CDT. The original FM, declared July 10, 2026, restricted IT and Secondary service flows from EGT West 1, West 2, Flex, and North Pooling Areas into EGT's South Pooling Area due to unplanned integrity assessment maintenance on Line S. The termination restores the ability to schedule receipts and deliveries in the South Pooling Area, including from Line AC meters such as MRT at Glendale and NGPL at Hot Springs.
EGT Line S FM termination effective July 15 restores South Pooling Area flow access; expect modest loosening of Arkla Basin supply constraints and slight bearish signal for Oklahoma/Arkansas basis vs Henry Hub as previously restricted IT and secondary service nominations resume.
Reroute: Moderate: Gulf South and Southern Natural (EGT via Energy Transfer) serve overlapping Arkla Basin and Southeast corridors; with FM now lifted, reroute question is moot as primary path is restored.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6472
Notice Type: Force Majeure
Subject: LINE S FMJ_TERMINATION
Posted: Tue Jul 14 07:54:00 CDT 2026
Effective: Wed Jul 15 09:00:00 CDT 2026
End Date:
EGT Critical Notices
TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Critical notice
Notice Effective Date: 07/15/2026
Notice Effective Time: 09:00
Notice End Date: 00/00/0000
Notice End Time: 00:00
Notice Identifier: 6472
Notice Status Description: Initiate
Notice Type: Force Majeure
Posting Date/Time: 07/14/2026 07:54
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject: LINE S FMJ_TERMINATION
Notice Text:
New Information Posted April 14th, 2026
EGT FMJ posting #6469 is terminated effective Wednesday, July15th at 09:00.
Previous Information Posted July 9th, 2026
This Operational Alert is being issued pursuant to Section 20, GT&C, of EGT s Tariff, and shall
constitute notice of Force Majeure under Section 8, GT&C, of EGT s Tariff to notify all parties of
unplanned maintenance on EGT s Line S in the South Pooling area as a result of an integrity
assessment.
Effective starting Friday, July 10th at 09:00 and continuing until further notice, EGT will not allow
IT and Secondary services from EGT s West 1, West 2, Flex and North Pooling Areas to EGT s South
Pooling Area. In addition, EGT will have limited ability to schedule receipt nominations from meters
that are located on EGT s Line AC to delivery points or pools located in EGT s South Pooling Area.
Meters include but are not limited to the following;
MP# 802267 MRT at Glendale
MP# 803500 NGPL at Hot Springs
EGT will not be capable of supporting non-ratable IT services in EGT s South Pooling area. Shippers
with delivery points in EGT s South Pooling Area should nominate from their primary receipt point to
their primary delivery point in order to maintain the highest priority level of service.
Failure to comply with this Force Majure notice will result in an OFO.
EGT will notify its shippers of changes regarding its capacity to the South Pooling Area by updating
this posting. EGT will continue to monitor capacity and will schedule receipts and deliveries in
accordance with EGT s Tariff.
If you have any questions concerning this Alert, please contact your scheduling representative.
For a more readable version of this document click
Here
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/14/26
07/14/26
08/14/26
Subject: Subject: CAPACITY POSTING - TIM for July 15, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 07/15/2026
Posting Date: 07/13/2026
Notice Identifier: 180405
Required Response Indicator Description: No response required
For Gas Day July 14, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
81%
Leidy Line Receipts
87%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
Planned Outage
Five Points South
N/A
100%
24%
Lebanon
N/A
100%
13%
Lebanon Lateral
Yes
Batesville South
N/A
100%
70%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
42%
White Castle South
N/A
100%
88%
Longview North
N/A
100%
61%
Deliveries to the Castor Line
N/A
100%
44%
Huntsville North
Yes
Speaks South
N/A
100%
84%
Angleton West
N/A
100%
60%
Gillis North
N/A
100%
52%
West Gillis 1
N/A
100%
23%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M2-24, M2-30 and M3, issued 7/14/2026. 5% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 07/15/2026
Posting Date: 07/13/2026
Notice Identifier: 180404
Required Response Indicator Description: No response required
For Gas Day July 14, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
95%
Planned Outage
Cromwell
100%
100%
78%
Planned Outage
Burrillville
100%
100%
100%
31%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
65%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
46%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
47%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
18%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 7/14/2026. 500 Dth / 5% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/13/2026- NEXUS Pipeline Conditions for 7/14/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 07/15/2026
Posting Date: 07/13/2026
Notice Identifier: 180400
Required Response Indicator Description: No response required
For Gas Day July 14, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Operational Flow Order - Imbalance
Posted: 07/13/2026 01:31:22 PM
Notice ID: 17055898
Notice 17055898
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/14/2026
Notice Eff Time:
09:00:00 CDT
Notice End Date:
07/18/2026
Notice End Time:
09:00:00 CDT
Notice ID:
17055898
Notice Stat Desc:
Supersede
Notice Type Desc:
OFO
Post Date:
07/13/2026
Post Time:
13:31:22 CDT
Prior Notice:
17053238
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Operational Flow Order - Imbalance
Transco provides notice of limited flexibility to manage imbalances due to recent trends in shipper imbalances and forecasted temperatures in Zones 5 & 6. In order to maintain system line pack and pressures for efficient and reliable firm service, Transco is issuing an Operational Flow Order (OFO) pursuant to Section 52 of its General Terms and Conditions of its Tariff.
Please refer to the table below for the effected zones, dates and tolerance percentages.
Beginning Gas Day:
Tuesday,
July 14, 2026
9:00 AM CT
Wednesday,
July 15, 2026
9:00 AM CT
Friday,
July 17, 2026
9:00 AM CT
Ending Gas Day:
Wednesday,
July 15, 2026
9:00 AM CT
Friday,
July 17, 2026
9:00 AM CT
Saturday,
July 18, 2026
9:00 AM CT
OFO Area(s):
Zone 6
Zones 5, 6
Zones 5, 6
Tariff Reference for OFO Issuance:*
(d)
(d)
(d)
Type of OFO:
Imbalance
Imbalance
Imbalance
Type of Imbalance:
Due From Shipper
Due From Shipper
Due From Shipper
Transactions Include:
Deliveries**
Deliveries**
Deliveries**
Beginning Cycle:
Timely
Timely
Timely
Tolerance % Allowed (or 1000 dth, Zone whichever is greater):
Due From Shipper 7%
Due From Shipper 5%
Due From Shipper 7%
Affected Shipper(s) (DUNS #):****
Affected Location(s) (DRN #/Loc ID):*****
All
All
All
Retro Scheduling Available
Yes
Yes
Yes
OBA Subject to OFO:
No
No
No
If Yes, OBA Parties (DUNS #):***
*Circumstances under which Seller may determine that an OFO must be issued include, but are not limited to in Section 52.2 of Transco's FERC Gas Tariff General Terms and Conditions:
Responding to an event of force majeure;
Accommodating capacity limitations resulting from the need to perform maintenance and/or repairs;
Ensuring current and future storage capabilities and maintenance of line pack;
Maintaining operational pressures and adequate gas supplies required to provide an efficient and reliable firm service;
Responding to any event which Seller believes in its sole judgment may jeopardize the integrity of its system.
** OFO based on all transactions with deliveries in affected OFO area.
***OFO based on all transactions with receipts in affected OFO area.
**** If specific DUNS #s have been identified, only imbalances created by those shippers/OBA parties will be subject to the OFO provisions.
*****If specific DRN #/Loc ID's have been identified, only imbalances created at those location(s) will be subject to the OFO provisions.
This OFO is directed to shippers consistent with Section 52 of Transco's FERC Gas Tariff General Terms and Conditions with a minimum of $50 per dt per day penalty. This OFO will continue until further notice. Buyers with imbalances greater than the allowed tolerance will be subject to penalties specified in Section 52 of Transco's FERC Gas Tariff General Terms and Conditions.
Additional information on Operational Flow Orders is available at this link:
http://www.1line.williams.com/Transco/files/training/Critical_Day.pdf
Please contact your Transportation Services Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/13/26
07/18/26
Subject: Subject: Notice of Phase 2 Warm Weather Operational Conditions & OFO Watch (Fuel Segment ML2, ML3, & ML7)
Author: Author: T0001375
Notice Text
Notice of Warm Weather Operational Conditions Phase 2, Effective 7/14/26 through 7/17/26
Effective for gas day 7/14/2026 through end of gas day 7/17/2026, in order to preserve system integrity and to ensure ANR is able to meet scheduled delivery commitments to all of fuel segments ML2, ML3, and ML7; ANR is, in accordance with the General Terms and Conditions, declaring an "Extreme Condition" as that term is defined in ANR's FERC Gas Tariff §6.1, lowering the Swing Percentage from 10% to 5%.
Please note that Phase 1 Critical Notice #26092038 and any notices superseding #26092038 (collectively "Critical Notice #26092038"), is still in effect for all remaining areas.
ANR is requesting, in accordance with §6.6.4 of its FERC Gas Tariff, that all receipt and delivery services, excluding ETS and FTS-3 delivery services, to be at a uniform hourly flow rate over a twenty-four (24) hour period. Rate Schedule FTS-3 shippers are required to be at their contractually agreed upon hourly rate.
All Rate Schedule ETS shippers with an aggregated ETS Delivery Point Group must comply with this posting at the ETS Delivery Point Group level. ETS shippers are restricted to the lower of 1/16th of the respective Delivery Point MDQ, or the contractually agreed upon hourly rate in their Service Agreement at the ETS Delivery Point Group level.
Requests for interruptible and overrun services including ANR's hourly ITS-3 service will be evaluated on a case-by-case basis. Scheduled flows for these interruptible services must also be at a uniform hourly rate over a twenty-four (24) hour period or for ITS-3 service the hourly flow rate will be the rate of the nominated, approved, and scheduled quantity. ANR is also reminding all MBS shippers that volumes not within operating tolerances and not at a uniform hourly flow rate of 1/24th of scheduled nominations will not be permitted.
In addition, ANR is closely monitoring "Unauthorized Overrun" under Rate Schedules FTS-1, FTS-2, FTS-3, FTS-4, FTS-4L, STS, and ETS. Please refer to ANR's FERC Gas Tariff under each rate schedule for further detail and elevated penalties in effect during an "Extreme Condition Situation". Shippers attempting to deliver gas via Unauthorized Overrun may be subject to an "express order to Shipper to cease and desist" and a shipper specific OFO.
ANR reserves the right to revoke any conditionally approved operational flexibility.
Customers requesting short-notice start-up are expected to provide corresponding supply into ANR later in the Gas Day. For customers without the short-notice startup provision in their transportation agreement, requests for a short-notice startup will be evaluated a case-by-case basis.
ANR is NOT declaring an Operational Flow Order (OFO) at this time but is providing Advance Warning to shippers (per §6.8.7 of its FERC Gas Tariff) that this weather event could create the need for ANR to issue an OFO with no additional prior notice to protect system integrity. Actions that may be necessary include, but are not limited to, further curtailing interruptible services, declining to schedule firm secondary nominations, and issuing an offending Shipper specific OFO, or issuing a non-Shipper specific OFO. ANR will continue to monitor system integrity closely and will update the EBB as required.
As a reminder, The Projected Hourly Consumption Forecast (Burn Sheet) for the power plant operations is required to be submitted to ANR prior to any flow or flow changes.
ANR will continue to monitor the system integrity closely and will update this posting as required.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- EFF 7/14
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 10/11/2026
Posting Date: 07/13/2026
Notice Identifier: 180386
Required Response Indicator Description: No response required
Zone
Gas Day July 13
Gas Day July 14 and until further notice
M1-24"
No OFO*
No OFO*
M1-30"
No OFO*
No OFO*
M2-24"
No OFO*
OFO In Effect: No Due Pipe 5% / 500
M2-30"
No OFO*
OFO In Effect: No Due Pipe 5% / 500
No OFO*
OFO In Effect: No Due Pipe 5% / 500
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/14/2026
Notice End Date: 10/11/2026
Posting Date: 07/13/2026
Notice Identifier: 180384
Prior Notice Identifier: 180054
Required Response Indicator Description: No response required
Notice Text:
Maritimes & Northeast (M&N) has limited operational flexibility to manage imbalances. Effective 9:00 AM CCT, July 14, 2026, M&N requires all shippers and point operators to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.
Correspondingly, effective 9:00 AM CCT, July 14, 2026, the previously posted imbalance notice is no longer in effect.
Additionally, M&N continues to require all Power Plant Operators to provide information mandated by FERC Order No. 698 until further notice. Information required includes the hourly consumption profile of directly connected power generation facilities.
To the extent shippers and/or point operators do not adhere to this requirement,
M&N will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
This notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/13/2026 6:53:39AM Notice End Date/Time: 07/14/2026 9:00:00am
Post Date/Time: 7/13/2026 6:53:39 AM Notice ID: 402753
Reqrd Rsp: 1 Rsp Date: 7/13/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: OFO DAILY CD1 DS 245 EFF 7-14-26
Notice Text:
OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-14-2026
Due to forecasted hotter weather with associated greater demand moving into the Northeast areas of its system along with ongoing scheduled maintenance, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Tuesday, July 14, 2026 Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is implementing an OFO Daily Critical Day (“CD”) 1 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
This OFO will be effective for LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-13-26
GD 7-14-26 and until further notice
Zone 0
No OFO
No OFO
Zone L
No OFO
No OFO
Zone 1
No OFO
No OFO
Zone 2
No OFO
No OFO
Zone 3
No OFO
No OFO
Zone 4
No OFO
No OFO
Zone 5
No OFO
Critical Day 1
All Areas East of STA 245 Only
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 6
No OFO
Critical Day 1
All areas on the 200 Line Only
· Receipts do not underdeliver
· Deliveries do not overtake
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: REMINDER: Operational Flow Order - Imbalance
Posted: 07/13/2026 06:20:41 AM
Notice ID: 17055061
Notice 17055061
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/14/2026
Notice Eff Time:
09:00:00 CDT
Notice End Date:
07/17/2026
Notice End Time:
09:00:00 CDT
Notice ID:
17055061
Notice Stat Desc:
Initiate
Notice Type Desc:
OFO
Post Date:
07/13/2026
Post Time:
06:20:41 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
REMINDER: Operational Flow Order - Imbalance
Transco provides notice of limited flexibility to manage imbalances due to recent trends in shipper imbalances and forecasted temperatures in Zones 6. In order to maintain system line pack and pressures for efficient and reliable firm service, Transco is issuing an Operational Flow
Please refer to the table below for the effected zones, dates and tolerance percentages.
Beginning Gas Day:
Tuesday,
July 14, 2026
9:00 AM CT
Ending Gas Day:
Friday,
July 17, 2026
9:00 AM CT
OFO Area(s):
Zones 6
Tariff Reference for OFO Issuance:*
(d)
Type of OFO:
Imbalance
Type of Imbalance:
Due From Shipper
Transactions Include:
Deliveries**
Beginning Cycle:
Timely
Tolerance % Allowed (or 1000 dth, Zone whichever is greater):
Due From Shipper 7%
Affected Shipper(s) (DUNS #):****
Affected Location(s) (DRN #/Loc ID):*****
All
Retro Scheduling Available
Yes
OBA Subject to OFO:
No
If Yes, OBA Parties (DUNS #):***
*Circumstances under which Seller may determine that an OFO must be issued include, but are not limited to in Section 52.2 of Transco's FERC Gas Tariff General Terms and Conditions:
Responding to an event of force majeure;
Accommodating capacity limitations resulting from the need to perform maintenance and/or repairs;
Ensuring current and future storage capabilities and maintenance of line pack;
Maintaining operational pressures and adequate gas supplies required to provide an efficient and reliable firm service;
Responding to any event which Seller believes in its sole judgment may jeopardize the integrity of its system.
** OFO based on all transactions with deliveries in affected OFO area.
***OFO based on all transactions with receipts in affected OFO area.
**** If specific DUNS #s have been identified, only imbalances created by those shippers/OBA parties will be subject to the OFO provisions.
*****If specific DRN #/Loc ID's have been identified, only imbalances created at those location(s) will be subject to the OFO provisions.
This OFO is directed to shippers consistent with Section 52 of Transco's FERC Gas Tariff General Terms and Conditions with a minimum of $50 per dt per day penalty. This OFO will continue until further notice. Buyers with imbalances greater than the allowed tolerance will be subject to penalties specified in Section 52 of Transco's FERC Gas Tariff General Terms and Conditions.
Additional information on Operational Flow Orders is available at this link:
http://www.1line.williams.com/Transco/files/training/Critical_Day.pdf
Please contact your Transportation Services Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/13/2026
Notice End Date: 07/14/2026
Posting Date: 07/12/2026
Notice Identifier: 180366
Required Response Indicator Description: No response required
For Gas Day July 13, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
34%
Five Points South
N/A
100%
23%
Lebanon
N/A
100%
13%
Lebanon Lateral
Yes
Batesville South
N/A
100%
71%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
83%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
60%
Deliveries to the Castor Line
N/A
100%
23%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
59%
Gillis North
N/A
100%
46%
West Gillis 1
N/A
100%
60%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/12/2026- NEXUS Pipeline Conditions for 7/13/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/13/2026
Notice End Date: 07/14/2026
Posting Date: 07/12/2026
Notice Identifier: 180353
Required Response Indicator Description: No response required
For Gas Day July 13, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/13/2026
Notice End Date: 07/14/2026
Posting Date: 07/12/2026
Notice Identifier: 180365
Required Response Indicator Description: No response required
For Gas Day July 13, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
79%
Planned Outage
Cromwell
100%
100%
58%
Planned Outage
Burrillville
100%
100%
83%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
58%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
34%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Operational Flow Order - Imbalance
Posted: 07/12/2026 03:57:47 PM
Notice ID: 17053238
Notice 17053238
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/14/2026
Notice Eff Time:
09:00:00 CDT
Notice End Date:
07/17/2026
Notice End Time:
09:00:00 CDT
Notice ID:
17053238
Notice Stat Desc:
Initiate
Notice Type Desc:
OFO
Post Date:
07/12/2026
Post Time:
15:57:47 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Operational Flow Order - Imbalance
Transco provides notice of limited flexibility to manage imbalances due to recent trends in shipper imbalances and forecasted temperatures in Zones 6. In order to maintain system line pack and pressures for efficient and reliable firm service, Transco is issuing an Operational Flow
Please refer to the table below for the effected zones, dates and tolerance percentages.
Beginning Gas Day:
Tuesday,
July 14, 2026
9:00 AM CT
Ending Gas Day:
Friday,
July 17, 2026
9:00 AM CT
OFO Area(s):
Zones 6
Tariff Reference for OFO Issuance:*
(d)
Type of OFO:
Imbalance
Type of Imbalance:
Due From Shipper
Transactions Include:
Deliveries**
Beginning Cycle:
Timely
Tolerance % Allowed (or 1000 dth, Zone whichever is greater):
Due From Shipper 7%
Affected Shipper(s) (DUNS #):****
Affected Location(s) (DRN #/Loc ID):*****
All
Retro Scheduling Available
Yes
OBA Subject to OFO:
No
If Yes, OBA Parties (DUNS #):***
*Circumstances under which Seller may determine that an OFO must be issued include, but are not limited to in Section 52.2 of Transco's FERC Gas Tariff General Terms and Conditions:
Responding to an event of force majeure;
Accommodating capacity limitations resulting from the need to perform maintenance and/or repairs;
Ensuring current and future storage capabilities and maintenance of line pack;
Maintaining operational pressures and adequate gas supplies required to provide an efficient and reliable firm service;
Responding to any event which Seller believes in its sole judgment may jeopardize the integrity of its system.
** OFO based on all transactions with deliveries in affected OFO area.
***OFO based on all transactions with receipts in affected OFO area.
**** If specific DUNS #s have been identified, only imbalances created by those shippers/OBA parties will be subject to the OFO provisions.
*****If specific DRN #/Loc ID's have been identified, only imbalances created at those location(s) will be subject to the OFO provisions.
This OFO is directed to shippers consistent with Section 52 of Transco's FERC Gas Tariff General Terms and Conditions with a minimum of $50 per dt per day penalty. This OFO will continue until further notice. Buyers with imbalances greater than the allowed tolerance will be subject to penalties specified in Section 52 of Transco's FERC Gas Tariff General Terms and Conditions.
Additional information on Operational Flow Orders is available at this link:
http://www.1line.williams.com/Transco/files/training/Critical_Day.pdf
Please contact your Transportation Services Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/12/2026
Notice End Date: 07/13/2026
Posting Date: 07/11/2026
Notice Identifier: 180349
Required Response Indicator Description: No response required
For Gas Day July 12, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Bedford East (1)
Yes
Unplanned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
33%
Five Points South
N/A
100%
23%
Lebanon
N/A
100%
13%
Lebanon Lateral
N/A
100%
92%
Batesville South
N/A
100%
71%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
86%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
50%
Deliveries to the Castor Line
N/A
100%
23%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
59%
Gillis North
N/A
100%
45%
West Gillis 1
N/A
100%
61%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
(1) No increases in nominations for deliveries between Bedford and Lambertville on TE's 36 inch line for receipts sourced outside this delivery area.
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/11/2026- NEXUS Pipeline Conditions for 7/12/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/12/2026
Notice End Date: 07/13/2026
Posting Date: 07/11/2026
Notice Identifier: 180322
Required Response Indicator Description: No response required
For Gas Day July 12, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180305
Required Response Indicator Description: No response required
For Gas Day July 11, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Leidy Line Receipts
100%
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
33%
Five Points South
N/A
100%
23%
Lebanon
N/A
100%
13%
Lebanon Lateral
Yes
Batesville South
N/A
100%
71%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
89%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
60%
Deliveries to the Castor Line
N/A
100%
23%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
59%
Gillis North
N/A
100%
46%
West Gillis 1
N/A
100%
67%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/10/2026- ETNG Pipeline Conditions for 07/11/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180278
Required Response Indicator Description: No response required
For Gas Day July 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DP - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/10/2026- ETNG Pipeline Conditions for 07/11/2026 -- CORRECTION
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/11/2026 -- CORRECTION
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180308
Prior Notice Identifier: 180278
Required Response Indicator Description: No response required
For Gas Day July 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #3
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Rockies Express
Notice ID: 13920
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #3
Posted: 7/10/2026 3:42:31 PM
Effective: 7/10/2026 3:42:31 PM
End Date: 12/31/9000
REX MAINTENANCE SCHEDULE FOR JULY 2026 – UPDATE #3
REX is updating the Maintenance Schedule to adjust the Bertrand Compressor Station Maintenance
for July 13 through July 17, that has been moved to July 20 through July 24 with adjusted capacities.
All other items remain the same as posted under notice ID 13883.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, REX will be performing maintenance at
its Bertrand Compressor Station (Seg 250). Operating capacity will be limited to the following capacities
in the West to East direction through Segment 250.
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 1,115 MDth/d.
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 914 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026, REX will be performing
maintenance at its Chandlersville Compressor Station (Segment 380). Operating capacity will be limited
to 2,903 MDth/d in the East to West direction through Segment 380. At this capacity level, primary and
secondary firm quantities, as well as ITS/AOR are at risk of not being scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
REX will be performing maintenance at its Washington Courthouse Compressor Station (Segment 380).
Operating capacity will be limited to the following capacities on the following gas days in the East to
West direction through Segment 380:
• Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026: 2,903 MDth/d.
• Gas Day Monday, July 13, 2026, through Gas Day Thursday, July 16, 2026: 2,922 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHEYENNE HUB COMPRESSOR STATION MAINTENANCE (SEG 160 and 200)
REX will be performing maintenance at its Cheyenne Hub Compressor Station (Segment 160 and 200).
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 200:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 467 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 838 MDth/d
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 160:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 1,777 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 1,913 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
REX will be performing maintenance at its Bertrand Compressor Station (Seg 250). Operating capacity
will be limited to the following in the West to East direction through Segment 250:
• Gas Day Tuesday, July 8, 2026: 467 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
REX will be performing maintenance at the Julesburg Compressor Station (Segment 240). Operating
capacity will be limited to the following in the West to East direction through Segment 240:
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 838 MDth/d
• Gas Day Wednesday, July 15, 2026 and Gas Day Friday, July 17, 2026: 937 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038410
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-10T12:32:00+00:00
Effective: 2026-07-10T16:45:00+00:00
End: 2026-07-14T09:00:00+00:00
Subject: Unplanned Vixen Compressor Station Maintenance
Gulf South Pipeline Notice 5038410
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038410
Prior Notice :
5038403
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Vixen Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/10/2026 12:32:00 PM
Notice Effective Date/Time :
07/10/2026 04:45:00 PM
Notice End Date/Time :
07/14/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised End Date
----------------------------------------------------------------------------------
Gulf South will be performing maintenance at Vixen Compressor Station.
Vixen Compressor East Scheduling Group
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gulf South is currently assessing compression availability at Vixen Compressor Station and will
communicate as soon as possible if further action or additional outage time is deemed necessary.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Please contact your customer service representative if you have any questions.
Notice
Page 1 of 1
07/10/2026 12:33:01 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/10/2026 12:32:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/10/2026 04:45:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
07/14/2026 09:00:00 AM
Notice ID :
5038410
Response Date/Time :
Prior Notice :
5038403
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Vixen Compressor Station Maintenance
Notice Text :
Revised End Date
----------------------------------------------------------------------------------
Gulf South will be performing maintenance at Vixen Compressor Station.
Vixen Compressor East Scheduling Group
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gulf South is currently assessing compression availability at Vixen Compressor Station and will
communicate as soon as possible if further action or additional outage time is deemed necessary.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Please contact your customer service representative if you have any questions.
07/10/2026 12:33:01 PM
Page 1 of 1
El Paso Natural Gas (EPNG)
[CAPACITY CONSTRAINT] NORTHERN BORDER HARPER-PRIM ONLY LIFT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: EPNG MOORE (LOC 3251) - PRIM ONLY LIFT
Posted: 06/29/2026 6:59:31AM
Effective: 06/29/2026 6:59:31AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[CAPACITY CONSTRAINT] CHEYENNE PLAINS FORD-PRIM ONLY LIFT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: SEGMENT 23 EAST - STA 342 - PRIMARY ONLY
Posted: 07/01/2026 7:53:45AM
Effective: 07/01/2026 7:53:45AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)
[CAPACITY CONSTRAINT] SEGMENT 24 EAST - STA 346 - PRIMARY ONLY
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: SEGMENT 24 EAST - STA 346 - PRIMARY ONLY
Posted: 07/01/2026 7:54:18AM
Effective: 07/01/2026 7:54:18AM
End Date: 07/31/2026 9:00:00AM
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26092035
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/10/26
07/10/26
08/10/26
Subject: Subject: UPDATE: Ridgeline Tie-In Maintenance (4166)
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gulf Transmission, LLC (CGT) notifies customers that ridgeline tie-ins are still on schedule to begin on Tuesday, July 14, 2026, reducing the backhaul capacity through HartSEG to a level between 2,200,000 – 2,400,000 Dth.
However, the City of Gallatin (4166) meter will now be taken to 0 Total Capacity effective Timely Cycle July 21, 2026, through July 31, 2026.
Reservation Charge Credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 40 of CGT’s FERC Gas Tariff (Tariff).
Please contact your Customer Services Representative with any questions.
***Previous Posting***
Columbia Gulf Transmission LLC (CGT) notifies customers of upcoming Ridgeline Tie-In’s on Mainlines 200 and 300 beginning on Tuesday, July 14, 2026, through Friday, July 31, 2026. As a result, the backhaul capacity through HartSEG will be reduced to a level between 2,200,000 - 2,400,000 Dth effective Timely Cycle for Gas Day Tuesday, July 14, 2026.
Additionally, the City of Gallatin (4166) meter will be taken to 0 Total Capacity effective Timely Cycle for Gas Day Tuesday, July 14, 2026 through Thursday, July 23, 2026.
CGT anticipates this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services. Please see the details provided below for more information.
HartSEG
· Estimated Capacity Setting: 2,200,000 – 2,400,000 Dth
· Design Capacity: 2,544,656 Dth
· Posted Percentage: 86-94%
Due to the potential impact to firm service, CGT encourages customers to monitor the scheduled volumes on the Operationally Available Capacity screen on Informational Postings, as nominations can fluctuate based on market conditions.
Reservation Charge Credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 40 of CGT’s FERC Gas Tariff (Tariff). By means of this notice, CGT is establishing the 7-day Average Usage Quantity to be the period of June 13-19, 2026, pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/10/2026 7:07:53AM Notice End Date/Time: 07/11/2026 9:00:00am
Post Date/Time: 7/10/2026 7:07:53 AM Notice ID: 402689
Reqrd Rsp: 1 Rsp Date: 7/10/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: OFO DAILY CD1 EFFECTIVE 7-11-2026
Notice Text:
OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-11-2026
Due to forecasted milder weather with associated lesser demand moving into areas of its system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Saturday, July 11, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is implementing an OFO Daily Critical Day (“CD”) 1 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
This OFO will be effective for LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-10-26
GD 7-11-26 and until further notice
Zone 0
No OFO
No OFO
Zone L
No OFO
No OFO
Zone 1
No OFO
No OFO
Zone 2
No OFO
No OFO
Zone 3
No OFO
No OFO
Zone 4
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
Zone 5
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
Zone 6
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/10/26
07/10/26
08/10/26
Subject: Subject: CAPACITY POSTING - TIM for July 11, 2026, through July 13, 2026
Author: Author: Dillon Schoolcraft
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - 2,450,000
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Columbia Gas Transmission (TCO)
CAPACITY POSTING - TIM for July 11, 2026 through July 13, 2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/10/26
07/10/26
08/10/26
Subject: Subject: CAPACITY POSTING - TIM for July 11, 2026 through July 13, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038403
Notice Type: Maintenance
Status: Initiate
Posted: 2026-07-09T16:35:00+00:00
Effective: 2026-07-10T16:45:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Unplanned Vixen Compressor Station Maintenance
Gulf South Pipeline Notice 5038403
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038403
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Vixen Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/09/2026 04:35:00 PM
Notice Effective Date/Time :
07/10/2026 04:45:00 PM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Vixen Compressor Station.
Vixen Compressor East Scheduling Group
Gas Day 7/10:
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gulf South is currently assessing compression availability at Vixen Compressor Station and will
communicate as soon as possible if further action or additional outage time is deemed necessary.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Please contact your customer service representative if you have any questions.
Notice
Page 1 of 1
07/09/2026 4:35:57 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 04:35:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/10/2026 04:45:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038403
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Vixen Compressor Station Maintenance
Notice Text :
Gulf South will be performing maintenance at Vixen Compressor Station.
Vixen Compressor East Scheduling Group
Gas Day 7/10:
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gulf South is currently assessing compression availability at Vixen Compressor Station and will
communicate as soon as possible if further action or additional outage time is deemed necessary.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Please contact your customer service representative if you have any questions.
07/09/2026 4:35:57 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 07/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 07/11/2026
Posting Date: 07/09/2026
Notice Identifier: 180243
Required Response Indicator Description: No response required
For Gas Day July 10, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
30%
Five Points South
N/A
100%
23%
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
Yes
Access Area
Union Church South
N/A
100%
41%
New Roads South
N/A
100%
94%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
61%
Deliveries to the Castor Line
N/A
100%
43%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
62%
Gillis North
N/A
100%
46%
West Gillis 1
N/A
100%
40%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/09/2026- ETNG Pipeline Conditions for 07/10/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 07/11/2026
Posting Date: 07/09/2026
Notice Identifier: 180236
Required Response Indicator Description: No response required
For Gas Day July 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 7/11
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/13/2026
Posting Date: 07/09/2026
Notice Identifier: 180224
Required Response Indicator Description: No response required
Operational Areas
Gas Day July 9 - July 10
Gas Day July 11 - July 13
Gas Day July 14 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO/No Action Alert
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 07/11/2026
Posting Date: 07/09/2026
Notice Identifier: 180242
Required Response Indicator Description: No response required
For Gas Day July 10, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
100%
51%
Planned Outage
Cromwell
100%
100%
96%
Planned Outage
Burrillville
100%
100%
100%
100%
100%
77%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
51%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
92%
Mendon Receipts
100%
100%
100%
100%
88%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
45%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
100%
100%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 7/9/2026. 500 Dth / 8% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 07/08/2026
Posting Date: 07/06/2026
Notice Identifier: 180070
Required Response Indicator Description: No response required
For Gas Day July 7, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
84%
Leidy Line Receipts
Yes
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
80%
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
N/A
100%
76%
Access Area
Union Church South
Yes
New Roads South
N/A
100%
90%
White Castle South
N/A
100%
90%
Longview North
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
39%
Huntsville North
Yes
Speaks South
N/A
100%
81%
Angleton West
N/A
100%
43%
Gillis North
N/A
100%
28%
West Gillis 1
N/A
100%
56%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/08/2026
Notice End Date: 07/09/2026
Posting Date: 07/07/2026
Notice Identifier: 180117
Required Response Indicator Description: No response required
For Gas Day July 8, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Leidy Line Receipts
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
22%
Five Points South
N/A
100%
78%
Lebanon
N/A
100%
81%
Lebanon Lateral
N/A
100%
96%
Batesville South
N/A
100%
69%
Access Area
Union Church South
N/A
100%
47%
New Roads South
N/A
100%
93%
White Castle South
N/A
100%
96%
Longview North
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
22%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
54%
Gillis North
N/A
100%
40%
West Gillis 1
N/A
100%
60%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/10/2026
Posting Date: 07/08/2026
Notice Identifier: 180206
Required Response Indicator Description: No response required
For Gas Day July 9, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
84%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
32%
Five Points South
N/A
100%
42%
Lebanon
N/A
100%
32%
Lebanon Lateral
Yes
Batesville South
N/A
100%
67%
Access Area
Union Church South
N/A
100%
33%
New Roads South
N/A
100%
94%
White Castle South
N/A
100%
96%
Longview North
N/A
100%
39%
Deliveries to the Castor Line
N/A
100%
17%
Huntsville North
Yes
Speaks South
N/A
100%
83%
Angleton West
N/A
100%
59%
Gillis North
N/A
100%
42%
West Gillis 1
N/A
100%
37%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/06/2026
Notice End Date: 10/04/2026
Posting Date: 07/06/2026
Notice Identifier: 180054
Prior Notice Identifier: 179765
Required Response Indicator Description: No response required
Notice Text:
Maritimes & Northeast (M&N) has limited operational flexibility to manage imbalances. Effective 9:00 AM CCT, July 6, 2026, M&N requires all shippers and point operators to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position.
Correspondingly, effective 9:00 AM CCT, July 6, 2026, the previously posted imbalance notice is no longer in effect.
Shippers are required to coordinate any imbalance payback through M&N's account representative and actual payback quantities may be limited depending on system operations and conditions.
Additionally, M&N continues to require all Power Plant Operators to provide information mandated by FERC Order No. 698 until further notice. Information required includes the hourly consumption profile of directly connected power generation facilities.
If necessary, M&N will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
This notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038392
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-08T15:45:00+00:00
Effective: 2026-07-08T16:50:00+00:00
End: 2026-07-31T09:00:00+00:00
Subject: Update: Index 330 Pipeline Maintenance
Gulf South Pipeline Notice 5038392
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038392
Prior Notice :
5038332
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
07/08/2026 03:45:00 PM
Notice Effective Date/Time :
07/08/2026 04:50:00 PM
Notice End Date/Time :
07/31/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Notice
Page 1 of 2
07/08/2026 3:45:40 PM
Tariff.
The following scheduling groups will be subject to impact:
Gas Day 6/15-6/25:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 6/26-7/31:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 550,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Page 2 of 2
07/08/2026 3:45:40 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/08/2026 03:45:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/08/2026 04:50:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
07/31/2026 09:00:00 AM
Notice ID :
5038392
Response Date/Time :
Prior Notice :
5038332
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
07/08/2026 3:45:40 PM
Page 1 of 2
Tariff.
The following scheduling groups will be subject to impact:
Gas Day 6/15-6/25:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 6/26-7/31:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 550,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
07/08/2026 3:45:40 PM
Page 2 of 2
East Tennessee Natural Gas
07/08/2026- ETNG Pipeline Conditions for 07/09/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/10/2026
Posting Date: 07/08/2026
Notice Identifier: 180200
Required Response Indicator Description: No response required
For Gas Day July 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/08/2026- AGT Pipeline Conditions for 07/09/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/10/2026
Posting Date: 07/08/2026
Notice Identifier: 180207
Required Response Indicator Description: No response required
For Gas Day July 9, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
100%
68%
Planned Outage
Cromwell
100%
100%
93%
Planned Outage
Burrillville
100%
100%
100%
100%
100%
100%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
50%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
92%
Mendon Receipts
100%
100%
100%
100%
81%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
49%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
100%
100%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 7/9/2026. 500 Dth / 8% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
08/01/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Shelbyville Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance on the Southeast Mainline at the Shelbyville Compressor Station located in Shelby County, Indiana. As a result, capacity will be reduced as follows:
7/21 – 7/31 Shelbyville Southbound (LOC #FPSHBVSB): 190 MMcf/d (leaving 850 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
16% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Transco
Station 60 MLA (Job 130950) 2026 Planned Outage and Maintenance Summary
SEV 3/5
Maintenance0.340 Bcf/d7 Days
Transco has scheduled a planned line outage for integrity assessments on Mainline A between valves 60A10 and 60A20 at Station 60 (MP 588.62) from August 4-10, 2026. Available throughput will be reduced from 2,133 MDth/d to 1,793 MDth/d, a reduction of 340 MDth/d (0.340 Bcf/d), representing approximately 16% of design capacity at this TSB. Primary firm shippers face an estimated 0-5% cut based on historical utilization, with an updated Market and Production Area constraint notice to follow.
Transco Station 60 planned maintenance removes 0.340 Bcf/d of southbound-to-northbound capacity for seven days in early August, expect modest basis widening at Transco Zone 4 and downstream Southeast/Mid-Atlantic points relative to Henry Hub with primary firm cuts projected at 0-5%.
Reroute: Limited: Southern Natural Gas (SNG/EGT) provides partial alternative routing for Southeast markets, but Transco is the dominant pipeline in this corridor and SNG capacity is significantly smaller; full offset of 0.340 Bcf/d is unlikely.
View original notice text
Pipeline: Transco
Notice: Station 60 MLA (Job 130950) 2026 Planned Outage and Maintenance Summary
Posted: 07/08/2026 01:48:10 PM
Notice ID: 17040930
Notice 17040930
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/08/2026
Notice Eff Time:
13:48:10 CDT
Notice End Date:
Notice End Time:
Notice ID:
17040930
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/08/2026
Post Time:
13:48:10 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Station 60 MLA (Job 130950) 2026 Planned Outage and Maintenance Summary
Transco will be performing a necessary line outage for integrity assessments between the 60A10 and 60A20 valves on Transco’s Mainline A associated with Job # 130950 on its 2026 Planned Outage and Maintenance Summary. The current schedule for this maintenance is
August 4, 2026 through August 10, 2026
.
The Throughput Section Boundary (TSB) at mainline MP 588.62 (Station 60) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name Location
Location ID
Flow Direction
Compressor Station 60 MP 588.62
9000000
South to North
Date
Design Capacity (Mdt/d)
Total Qty Available (Mdt/d)
% Available Total Primary-Firm vs Design Capacity
% Cuts (Primary) Potential Shipper Impact (Based on Historical Utilization)*
Aug 4-10
2,133
1,793
84%
0-5%
*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
Transco
Meter Outage McComb & GS Magnolia (Job 130940) 2026 Planned Outage and Maintenance Summary
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Meter Outage McComb & GS Magnolia (Job 130940) 2026 Planned Outage and Maintenance Summary
Posted: 07/08/2026 01:52:39 PM
Notice ID: 17040935
Notice 17040935
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/08/2026
Notice Eff Time:
13:52:39 CDT
Notice End Date:
Notice End Time:
Notice ID:
17040935
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/08/2026
Post Time:
13:52:39 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Meter Outage McComb & GS Magnolia (Job 130940) 2026 Planned Outage and Maintenance Summary
Transco will be performing necessary line outage for integrity assessments between the 65A10 – 65A20 valve sections associated with Job #130940 on its 2026 Planned Outage and Maintenance Summary. The current schedule for this maintenance is
August 18, 2026 through August 24, 2026.
During the maintenance outage, the location(s) identified below will not be available for scheduling or flow:
Location Name
Location ID
Location Type
MCCOMB M4483
1002726
Delivery
GULF SOUTH-MAGNOLIA M4150
1006175
Delivery
If you have any questions, please contact your Transportation Services Representative.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order-- EFF 7/9
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/11/2026
Posting Date: 07/08/2026
Notice Identifier: 180137
Required Response Indicator Description: No response required
Operational Area
Gas day July 8
Gas Day July 9 and July 10
Gas Day July 11 and until further Notice
System Wide - All Customers
No OFO*
OFO In Effect: No DP 8% / 500
No OFO*
Customer Specific
OFO In Effect: No DS 5% / 500
OFO In Effect: No DS 5% / 500
OFO In Effect: No DS 5% / 500
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/07/2026 9:06:03AM Notice End Date/Time: 07/08/2026 9:00:00am
Post Date/Time: 7/7/2026 9:06:03 AM Notice ID: 402616
Reqrd Rsp: 1 Rsp Date: 7/7/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: EMERGENT REPAIR 559-2A TO 560-2 EFF 7-7
Notice Text:
EMERGENT REPAIR BETWEEN MLV 559-2A TO 560-2 EFFECTIVE 7-7-2026
Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair issue at MLV 559-2A to 560-2 near Centerville, TN. Tennessee has discovered an issue that necessitates repairs. Tennessee will need to isolate this area for pipeline inspections. Tennessee is estimating the current impact to be up to 175,000 Dths. Based upon current demand and nominations, Secondary Out of the Path nominations pathed through STA 860 South 500 Line (Segment 548 BH) may be at risk as early as Timely Cycle for the gas day of Wednesday, July 8, 2026 and until further notice. Previously scheduled volumes will not be curtailed for the current gas day of June 7, 2026; however, increases pathed through STA 860 South 500 Line (Segment 548 BH) for the remainder of the gas day are at risk.
Updates will be posted as more information becomes available.
Please contact your Scheduler if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/08/2026
Notice End Date: 07/09/2026
Posting Date: 07/07/2026
Notice Identifier: 180111
Required Response Indicator Description: No response required
For Gas Day July 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/07/2026- AGT Pipeline Conditions for 07/08/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/08/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/08/2026
Notice End Date: 07/09/2026
Posting Date: 07/07/2026
Notice Identifier: 180116
Required Response Indicator Description: No response required
For Gas Day July 8, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
100%
26%
Planned Outage
Cromwell
100%
100%
100%
100%
100%
Planned Outage
Burrillville
100%
100%
100%
100%
100%
100%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
24%
Iroquois Receipts
100%
100%
54%
Hanover West
100%
100%
92%
Mendon Receipts
100%
100%
100%
100%
86%
Lincoln Receipts
100%
100%
86%
G System
100%
100%
35%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
100%
100%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 7/7/2026. 500 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/06/26
07/06/26
08/06/26
Subject: Subject: CAPACITY POSTING - TIM for July 7, 2026
Author: Author: Dillon Schoolcraft
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG – Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Cameron LNG Feed
[MAINTENANCE] EMERGENT REPAIR 559-2A TO 560-2 EFF 7-7
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Customer Specific Operational Flow Order -- EFF 7/7
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 10/05/2026
Posting Date: 07/07/2026
Notice Identifier: 180093
Required Response Indicator Description: No response required
Operational Area
Gas Day July 6
Gas Day July 7 and until further notice
System Wide - All Customers
No OFO*
No OFO*
Customer Specific
No OFO*
OFO in Effect: No DS 5% / 500
Hourly Customer Specific
No OFO*
No OFO*
Natural Gas Pipeline (NGPL)
[CAPACITY CONSTRAINT] SEGS 5 & 6 REC POINTS - PRIM ONLY LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 07/08/2026
Posting Date: 07/06/2026
Notice Identifier: 180067
Required Response Indicator Description: No response required
For Gas Day July 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/06/2026- AGT Pipeline Conditions for 07/07/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/07/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 07/08/2026
Posting Date: 07/06/2026
Notice Identifier: 180091
Required Response Indicator Description: No response required
For Gas Day July 7, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
67%
Planned Outage
Cromwell
100%
100%
100%
100%
100%
Planned Outage
Burrillville
100%
100%
100%
100%
100%
100%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
14%
Iroquois Receipts
100%
100%
50%
Hanover West
100%
100%
90%
Mendon Receipts
100%
100%
100%
100%
73%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
27%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/04/2026
Notice End Date: 07/05/2026
Posting Date: 07/03/2026
Notice Identifier: 179973
Required Response Indicator Description: No response required
For Gas Day July 4, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Leidy Line Receipts
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
31%
Planned Outage
Five Points South
N/A
100%
77%
Lebanon
N/A
100%
70%
Lebanon Lateral
Yes
Batesville South
N/A
100%
81%
Access Area
Union Church South
N/A
100%
33%
New Roads South
N/A
100%
93%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
27%
Deliveries to the Castor Line
N/A
100%
16%
Huntsville North
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
43%
Gillis North
N/A
100%
54%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, M2-30 and M3, issued 6/30/2026. 2% / 500 Dth Tolerance
OFO
No DP - M1-30, issued 6/29/2026. 10% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/05/2026
Notice End Date: 07/06/2026
Posting Date: 07/04/2026
Notice Identifier: 180004
Required Response Indicator Description: No response required
For Gas Day July 5, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Leidy Line Receipts
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
31%
Planned Outage
Five Points South
N/A
100%
77%
Lebanon
N/A
100%
70%
Lebanon Lateral
Yes
Batesville South
N/A
100%
81%
Access Area
Union Church South
N/A
100%
33%
New Roads South
N/A
100%
93%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
27%
Deliveries to the Castor Line
N/A
100%
16%
Huntsville North
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
40%
Gillis North
N/A
100%
44%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, M2-30 and M3, issued 6/30/2026. 2% / 500 Dth Tolerance
OFO
No DP - M1-30, issued 6/29/2026. 10% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Warning - System Wide Draft
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Update - Market and Production Constraints
Posted: 07/06/2026 07:23:20 AM
Notice ID: 17033639
Notice 17033639
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/06/2026
Notice Eff Time:
07:23:20 CDT
Notice End Date:
Notice End Time:
Notice ID:
17033639
Notice Stat Desc:
Supersede
Notice Type Desc:
Constraint
Post Date:
07/06/2026
Post Time:
07:23:20 CDT
Prior Notice:
17033632
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Update - Market and Production Constraints
The available capacity listed below in each section will become effective
July 7, 2026
. Changes from the previous gas day are highlighted in
bold
.
The following chart reflects the quantity of available transportation capacity including Primary, Non-Secondary Reverse Path (NSRP), Secondary Firm, and Interruptible at various Throughput Section Boundary (TSB) locations or segment constraints. These TSBs are identified as receipt or delivery based.
Maintenance TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
Job #
9012663
Compressor Station 160
5
Del
M-L
1,726
All
N-S
327549
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
System TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
9011140
Mainline MP 438.84
2
Rec
L
709
PRIMARY
S to N
9000000
Compressor Station 60 MP 588.62
3
Rec
Loc
200
NSRP
S to N
9011460
SWLA Lat N to S MP 1.0
2
Del
L
40
NSRP
N to S
9011260
SELA N to S MP 85.93
3
Rec
L
0
PRIMARY
N to S
9011261
SELA S to N MP 85.94
3
Rec
L
0
PRIMARY
S to N
9001620
Mobile Bay Lat South Asc MP 20
4A
Del
L
25
NSRP
N to S
5000048
TSB MP 1412.98 to MP 1369.45
5
Del
S
0
NSRP
N to S
1001280
S Virginia Lat Sta 167 MP 69.12
5
Del
L
0
SECONDARY
N to S
5000033
TSB MP 1413.00 to MP 1519.92
5
Del
S
200
NSRP
N to S
5000039
TSB MP 1519.93 to MP 1586.30
5
Del
S
200
NSRP
N to S
5000040
TSB MP 1586.30 to 1674.56
5,6
Del
S
200
NSRP
N to S
9010778
Central Penn South N to S TSB MP 1.00
6
Del
L
0
SECONDARY
N to S
9008342
Marcus Hook Lateral TSB MP 1.10
6
Del
L
200
SECONDARY
N to S
9012063
Marcus Hook Lateral TSB MP 18.71
6
Del
L
OPEN
N to S
9008343
Trenton Woodbury Lateral TSB MP 1.00
6
Del
L
200
SECONDARY
N to S
9007422
Station 207 Lower Bay Lateral MP 8.57
6
Del
L
447
SECONDARY
W to E
9008482
NY Bay Lateral MP 35.00
6
Del
L
0
SECONDARY
W to E
9008866
Mainline Milltown MP 1790.85
6
Del
L
0
NSRP
S to N
1001300
Linden MP 1808.191
6
Del
L
50
NSRP
S to N
9010838
Rivervale Lat. North NJ Ext. MP 19.0
6
Rec
L
0
SECONDARY
N to S
9010459
Central Penn Line North N to S MP 1.00
6
Rec
L
1,112.4
PRIMARY
N to S
9007462
Leidy Station 517 W MP 127.949
6
Del
L
400
NSRP
E to W
9007463
Leidy Station 520 W MP 170.389
6
Del
L
400
NSRP
E to W
9008462
Leidy Line West End MP 205.00
6
Del
L
400
NSRP
E to W
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
Location TSB (L); Segment TSB (S); Maintenance Location TSB (M-L)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc/Seg ID
HBLV Location/Segment Constraint
Zone
Type of HBLV
Available Swing Mdt/d
Highest Priority Included
5000027
Zone 1 Segment
1
S
1
Secondary
5000028
Zone 2 Segment
2
S
0
Secondary
5000029
Zone 3 Segment
3
S
0
Secondary
5000030
Zone 4 Segment
4
S
0
Secondary
5000031
Zone 5 Segment
5
S
0
Secondary
5000032
Zone 6 Segment
6
S
0
Secondary
Location (L); Segment (S)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc ID
Location Name
Zone
Del/Rec
Single Point or Group
Available Capacity Mdt/d
1005046
Duralde M2856
3
Rec
L
460
9003442
Pine Prairie Stg
3
Rec
L
900
9003442
Pine Prairie Stg
3
Del
L
***
1006218
Ragley Trunkline
3
Rec
L
350
9010378
TOD Leidy West Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9010379
TOD Leidy East Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9007682
Leidy Line Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9001342
Martins Creek #3
6
Rec
L
43
1006561
Algonquin - Ctr M4402
6
Del
L
135**
9007962
Raceland I/C
3
Del
L
40
1004123
Terrebonne Sta 62 I/C
3
Del
L
85
1006304
Vinton FGT Meter 4381
2
Del
L
0
9002300
POOLE ROAD
1
Del
L
80
Location (L); Aggregate of Locations (G)
Leidy Aggregate Receipts consist of: Puddlefield, Carverton and Chapin
Markham Aggregate Deliveries consist of: Markham Channel, Markham Valero, Markham SW #1, and Poole Road
TOD Leidy West consists of: Puddlefield, Carverton and Chapin
TOD Leidy East consists of: Puddlefield, Carverton and Chapin
** Non-Traditional and Lower Priorities
*** Delivery qty. available only by displacement of scheduled receipt qty.
To the extent that the total nominated quantities or requested HBLV quantities exceed the available capacity/swing in the charts identified above, Transco will adjust these quantities based on its priority of service, in accordance with the General Terms and Conditions of Transco's FERC Gas Tariff.
This information is provided as a summary of significant information that coincides with information currently available under Transco's Operational Capacity report and is intended to provide customers with an easy reference source. Transco may be required to institute capacity restrictions at locations or in segments other than those identified above if operational conditions dictate. As operational conditions change, Transco will provide notice, via 1Line, of any additional segments or locations where transportation services or HBLVs may be limited and of any changes in available capacity in any of the identified areas.
If you have any questions, please contact your Commercial Services Representative.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Update - Market and Production Constraints
Posted: 07/06/2026 07:05:58 AM
Notice ID: 17033632
Notice 17033632
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/06/2026
Notice Eff Time:
07:05:58 CDT
Notice End Date:
Notice End Time:
Notice ID:
17033632
Notice Stat Desc:
Supersede
Notice Type Desc:
Constraint
Post Date:
07/06/2026
Post Time:
07:05:58 CDT
Prior Notice:
17014293
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Update - Market and Production Constraints
The available capacity listed below in each section will become effective
July 7, 2026
. Changes from the previous gas day are highlighted in
bold
.
The following chart reflects the quantity of available transportation capacity including Primary, Non-Secondary Reverse Path (NSRP), Secondary Firm, and Interruptible at various Throughput Section Boundary (TSB) locations or segment constraints. These TSBs are identified as receipt or delivery based.
Maintenance TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
Job #
9012663
Compressor Station 60
5
Del
M-L
1,726
All
N-S
327549
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
System TSB Constraints
Loc ID
Location Name
ZN
Del/Rec
Type of TSB
Available Capacity Mdt/d
Highest Priority Included*
Flow Dir
9011140
Mainline MP 438.84
2
Rec
L
709
PRIMARY
S to N
9000000
Compressor Station 60 MP 588.62
3
Rec
Loc
200
NSRP
S to N
9011460
SWLA Lat N to S MP 1.0
2
Del
L
40
NSRP
N to S
9011260
SELA N to S MP 85.93
3
Rec
L
0
PRIMARY
N to S
9011261
SELA S to N MP 85.94
3
Rec
L
0
PRIMARY
S to N
9001620
Mobile Bay Lat South Asc MP 20
4A
Del
L
25
NSRP
N to S
5000048
TSB MP 1412.98 to MP 1369.45
5
Del
S
0
NSRP
N to S
1001280
S Virginia Lat Sta 167 MP 69.12
5
Del
L
0
SECONDARY
N to S
5000033
TSB MP 1413.00 to MP 1519.92
5
Del
S
200
NSRP
N to S
5000039
TSB MP 1519.93 to MP 1586.30
5
Del
S
200
NSRP
N to S
5000040
TSB MP 1586.30 to 1674.56
5,6
Del
S
200
NSRP
N to S
9010778
Central Penn South N to S TSB MP 1.00
6
Del
L
0
SECONDARY
N to S
9008342
Marcus Hook Lateral TSB MP 1.10
6
Del
L
200
SECONDARY
N to S
9012063
Marcus Hook Lateral TSB MP 18.71
6
Del
L
OPEN
N to S
9008343
Trenton Woodbury Lateral TSB MP 1.00
6
Del
L
200
SECONDARY
N to S
9007422
Station 207 Lower Bay Lateral MP 8.57
6
Del
L
447
SECONDARY
W to E
9008482
NY Bay Lateral MP 35.00
6
Del
L
0
SECONDARY
W to E
9008866
Mainline Milltown MP 1790.85
6
Del
L
0
NSRP
S to N
1001300
Linden MP 1808.191
6
Del
L
50
NSRP
S to N
9010838
Rivervale Lat. North NJ Ext. MP 19.0
6
Rec
L
0
SECONDARY
N to S
9010459
Central Penn Line North N to S MP 1.00
6
Rec
L
1,112.4
PRIMARY
N to S
9007462
Leidy Station 517 W MP 127.949
6
Del
L
400
NSRP
E to W
9007463
Leidy Station 520 W MP 170.389
6
Del
L
400
NSRP
E to W
9008462
Leidy Line West End MP 205.00
6
Del
L
400
NSRP
E to W
*The priority listed in addition to all lower priorities will be subject to the Available Capacity. If the priority listed references “Only”, only the priority listed will be allowed and subject to the Available Capacity; All lower priorities will not be allowed.
Location TSB (L); Segment TSB (S); Maintenance Location TSB (M-L)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc/Seg ID
HBLV Location/Segment Constraint
Zone
Type of HBLV
Available Swing Mdt/d
Highest Priority Included
5000027
Zone 1 Segment
1
S
1
Secondary
5000028
Zone 2 Segment
2
S
0
Secondary
5000029
Zone 3 Segment
3
S
0
Secondary
5000030
Zone 4 Segment
4
S
0
Secondary
5000031
Zone 5 Segment
5
S
0
Secondary
5000032
Zone 6 Segment
6
S
0
Secondary
Location (L); Segment (S)
The following chart reflects the quantity of available High Burn Limit Value (HBLV) no-notice swing service including Non-Traditional (NT Swing), Secondary (Sec Swing) and Interruptible (IT Swing) at various location or segment HBLV constraints.
Loc ID
Location Name
Zone
Del/Rec
Single Point or Group
Available Capacity Mdt/d
1005046
Duralde M2856
3
Rec
L
460
9003442
Pine Prairie Stg
3
Rec
L
900
9003442
Pine Prairie Stg
3
Del
L
***
1006218
Ragley Trunkline
3
Rec
L
350
9010378
TOD Leidy West Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9010379
TOD Leidy East Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9007682
Leidy Line Aggregate Receipt MP 101.00
6
Rec
G
OPEN
9001342
Martins Creek #3
6
Rec
L
43
1006561
Algonquin - Ctr M4402
6
Del
L
135**
9007962
Raceland I/C
3
Del
L
40
1004123
Terrebonne Sta 62 I/C
3
Del
L
85
1006304
Vinton FGT Meter 4381
2
Del
L
0
9002300
POOLE ROAD
1
Del
L
80
Location (L); Aggregate of Locations (G)
Leidy Aggregate Receipts consist of: Puddlefield, Carverton and Chapin
Markham Aggregate Deliveries consist of: Markham Channel, Markham Valero, Markham SW #1, and Poole Road
TOD Leidy West consists of: Puddlefield, Carverton and Chapin
TOD Leidy East consists of: Puddlefield, Carverton and Chapin
** Non-Traditional and Lower Priorities
*** Delivery qty. available only by displacement of scheduled receipt qty.
To the extent that the total nominated quantities or requested HBLV quantities exceed the available capacity/swing in the charts identified above, Transco will adjust these quantities based on its priority of service, in accordance with the General Terms and Conditions of Transco's FERC Gas Tariff.
This information is provided as a summary of significant information that coincides with information currently available under Transco's Operational Capacity report and is intended to provide customers with an easy reference source. Transco may be required to institute capacity restrictions at locations or in segments other than those identified above if operational conditions dictate. As operational conditions change, Transco will provide notice, via 1Line, of any additional segments or locations where transportation services or HBLVs may be limited and of any changes in available capacity in any of the identified areas.
If you have any questions, please contact your Commercial Services Representative.
Freeport LNG Feed
[CAPACITY CONSTRAINT] ANT PIP RESTRICTION SEG187BH EFF 7-7 REM
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/06/2026
Notice End Date: 07/07/2026
Posting Date: 07/05/2026
Notice Identifier: 180036
Required Response Indicator Description: No response required
For Gas Day July 6, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Leidy Line Receipts
Yes
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
31%
Planned Outage
Five Points South
N/A
100%
77%
Lebanon
N/A
100%
70%
Lebanon Lateral
Yes
Batesville South
N/A
100%
81%
Access Area
Union Church South
N/A
100%
33%
New Roads South
N/A
100%
93%
White Castle South
N/A
100%
97%
Longview North
N/A
100%
27%
Deliveries to the Castor Line
N/A
100%
16%
Huntsville North
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
42%
Gillis North
N/A
100%
54%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/05/2026- NEXUS Pipeline Conditions for 7/6/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/06/2026
Notice End Date: 07/07/2026
Posting Date: 07/05/2026
Notice Identifier: 180024
Required Response Indicator Description: No response required
For Gas Day July 6, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/06/2026
Notice End Date: 07/07/2026
Posting Date: 07/05/2026
Notice Identifier: 180034
Required Response Indicator Description: No response required
For Gas Day July 6, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline Limited Partnership (Canada)
Subject: MNCA Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/05/2026
Notice End Date: 10/03/2026
Posting Date: 07/05/2026
Notice Identifier: 180022
Prior Notice Identifier: 179769
Required Response Indicator Description: No response required
Notice Text:
Maritimes & Northeast Canada (MNCA) has limited operational flexibility to manage imbalances. Effective immediately, MNCA requires all shippers and point operators to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position.
Correspondingly, effective immediately, the previously posted imbalance notice is no longer in effect.
Shippers are required to coordinate any imbalance payback through MNCA's account representative and actual payback quantities may be limited depending on system operations and conditions.
If necessary, MNCA will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
This imbalance notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
NEXUS Gas Transmission (U.S.)
07/04/2026- NEXUS Pipeline Conditions for 7/5/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/05/2026
Notice End Date: 07/06/2026
Posting Date: 07/04/2026
Notice Identifier: 179998
Required Response Indicator Description: No response required
For Gas Day July 5, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/05/2026
Notice End Date: 07/06/2026
Posting Date: 07/04/2026
Notice Identifier: 180001
Required Response Indicator Description: No response required
For Gas Day July 5, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/04/2026
Notice End Date: 07/05/2026
Posting Date: 07/03/2026
Notice Identifier: 179971
Required Response Indicator Description: No response required
For Gas Day July 4, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/03/2026- NEXUS Pipeline Conditions for 7/4/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/04/2026
Notice End Date: 07/05/2026
Posting Date: 07/03/2026
Notice Identifier: 179960
Required Response Indicator Description: No response required
For Gas Day July 4, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
TransColorado Gas Transmission
[CAPACITY CONSTRAINT] NORTHERN BORDER HARPER-PRIM ONLY LIFT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/3/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/03/2026
Notice End Date: 07/04/2026
Posting Date: 07/02/2026
Notice Identifier: 179941
Required Response Indicator Description: No response required
For Gas Day July 3, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Leidy Line Receipts
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
100%
100%
22%
Planned Outage
Five Points South
N/A
100%
77%
Lebanon
N/A
100%
69%
Lebanon Lateral
Yes
Batesville South
N/A
100%
81%
Access Area
Union Church South
N/A
100%
33%
New Roads South
N/A
100%
96%
White Castle South
N/A
100%
95%
Longview North
N/A
100%
27%
Deliveries to the Castor Line
N/A
100%
16%
Huntsville North
Yes
Speaks South
N/A
100%
81%
Angleton West
N/A
100%
44%
Gillis North
N/A
100%
54%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, M2-30 and M3, issued 6/30/2026. 2% / 500 Dth Tolerance
OFO
No DP - M1-30, issued 6/29/2026. 10% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/02/2026- NEXUS Pipeline Conditions for 07/03/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/03/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/03/2026
Notice End Date: 07/04/2026
Posting Date: 07/02/2026
Notice Identifier: 179930
Required Response Indicator Description: No response required
For Gas Day July 3, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/3/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/03/2026
Notice End Date: 07/04/2026
Posting Date: 07/02/2026
Notice Identifier: 179942
Required Response Indicator Description: No response required
For Gas Day July 3, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/02/2026- AGT Pipeline Conditions for 07/03/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/03/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/03/2026
Notice End Date: 07/04/2026
Posting Date: 07/02/2026
Notice Identifier: 179940
Required Response Indicator Description: No response required
For Gas Day July 3, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
60%
Cromwell
100%
100%
58%
Burrillville
100%
100%
97%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
39%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
82%
Lincoln Receipts
100%
100%
84%
G System
100%
100%
59%
C System
Yes
I-8 West to East
100%
100%
19%
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - issued 7/1/26. 500 Dth / 2% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- UPDATE
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/03/2026
Notice End Date: 09/30/2026
Posting Date: 07/02/2026
Notice Identifier: 179927
Prior Notice Identifier: 179763
Required Response Indicator Description: No response required
Zone
Gas Day July 2
Gas Day July 3 and until further notice
M1-24"
OFO In Effect: No Due Pipe 2% / 500
OFO In Effect: No Due Pipe 2% / 500
M1-30"
OFO In Effect: No Due Pipe 10% / 500
OFO In Effect: No Due Pipe 10% / 500
M2-24"
OFO In Effect: No Due Pipe 2% / 500
OFO In Effect: No Due Pipe 2% / 500
M2-30"
OFO In Effect: No Due Pipe 2% / 500
OFO In Effect: No Due Pipe 2% / 500
OFO In Effect: No Due Pipe 2% / 500
OFO In Effect: No Due Pipe 2% / 500
ETX
OFO In Effect: No Due Pipe 10% / 500
No OFO*
STX
OFO In Effect: No Due Pipe 10% / 500
No OFO*
WLA
OFO In Effect: No Due Pipe 10% / 500
No OFO*
ELA
OFO In Effect: No Due Pipe 10% / 500
No OFO*
Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 7/2/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/02/2026
Notice End Date: 07/03/2026
Posting Date: 07/01/2026
Notice Identifier: 179908
Required Response Indicator Description: No response required
For Gas Day July 2, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Leidy Line Receipts
100%
100%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Tompkinsville
N/A
100%
100%
Barton
N/A
100%
100%
24"
Sarahsville South
N/A
100%
98%
Planned Outage
Five Points South
N/A
100%
54%
Lebanon
N/A
100%
45%
Lebanon Lateral
Yes
Batesville South
N/A
100%
82%
Access Area
Union Church
Yes
New Roads South
N/A
100%
91%
White Castle South
N/A
100%
92%
Hope North
N/A
100%
100%
Planned Outage
Deliveries to the Castor Line
N/A
100%
34%
Huntsville
Yes
Speaks South
N/A
100%
82%
Angleton West
N/A
100%
43%
Gillis North
N/A
100%
50%
West Gillis 1
Yes
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, M2-30 and M3, issued 6/30/2026. 2% / 500 Dth Tolerance
OFO
No DP - Access Area and M1-30, issued 6/29/2026. 10% / 500 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
---
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in all Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas
07/01/2026- ETNG Pipeline Conditions for 07/02/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/02/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/02/2026
Notice End Date: 07/03/2026
Posting Date: 07/01/2026
Notice Identifier: 179887
Required Response Indicator Description: No response required
For Gas Day July 2, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
'No DP - System Wide effective 7/1/26. 500 Dth / 10% Tolerance
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Operation Flow Order - Imbalance
Posted: 07/01/2026 03:18:22 PM
Notice ID: 17019542
Notice 17019542
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/05/2026
Notice Eff Time:
09:00:00 CDT
Notice End Date:
07/06/2026
Notice End Time:
09:00:00 CDT
Notice ID:
17019542
Notice Stat Desc:
Initiate
Notice Type Desc:
OFO
Post Date:
07/01/2026
Post Time:
15:18:22 CDT
Prior Notice:
0
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Operation Flow Order - Imbalance
Transco provides notice of limited flexibility to manage imbalances. In order to maintain operational pressures and adequate gas supplies required to provide an efficient and reliable firm service, Transco is issuing an Operational Flow Order (OFO) pursuant to Section 52 of its General Terms and Conditions of its Tariff.
Please refer to the table below for the effected zones, dates and tolerance percentages.
Beginning Gas Day:
Sunday,
July 5, 2026
9:00 AM CT
Ending Gas Day:
Monday,
July 6, 2026
9:00 AM CT
OFO Area(s):
Zone 6
Tariff Reference for OFO Issuance:*
(d)
Type of OFO:
Imbalance
Type of Imbalance:
Due To Shipper
Transactions Include:
Deliveries**
Beginning Cycle:
Timely
Tolerance % Allowed (or 1000 dth, Zone whichever is greater):
Due To Shipper 7%
Affected Shipper(s) (DUNS #):****
Affected Location(s) (DRN #/Loc ID):*****
All
Retro Scheduling Available
Yes
OBA Subject to OFO:
No
If Yes, OBA Parties (DUNS #):***
*Circumstances under which Seller may determine that an OFO must be issued include, but are not limited to in Section 52.2 of Transco's FERC Gas Tariff General Terms and Conditions:
Responding to an event of force majeure;
Accommodating capacity limitations resulting from the need to perform maintenance and/or repairs;
Ensuring current and future storage capabilities and maintenance of line pack;
Maintaining operational pressures and adequate gas supplies required to provide an efficient and reliable firm service;
Responding to any event which Seller believes in its sole judgment may jeopardize the integrity of its system.
** OFO based on all transactions with deliveries in affected OFO area.
***OFO based on all transactions with receipts in affected OFO area.
**** If specific DUNS #s have been identified, only imbalances created by those shippers/OBA parties will be subject to the OFO provisions.
*****If specific DRN #/Loc ID's have been identified, only imbalances created at those location(s) will be subject to the OFO provisions.
This OFO is directed to shippers consistent with Section 52 of Transco's FERC Gas Tariff General Terms and Conditions with a minimum of $50 per dt per day penalty. This OFO will continue until further notice. Buyers with imbalances greater than the allowed tolerance will be subject to penalties specified in Section 52 of Transco's FERC Gas Tariff General Terms and Conditions.
Additional information on Operational Flow Orders is available at this link:
http://www.1line.williams.com/Transco/files/training/Critical_Day.pdf
Please contact your Transportation Services Representative if you have any questions.
NEXUS Gas Transmission (U.S.)
07/01/2026- NEXUS Pipeline Conditions for 07/02/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/02/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/02/2026
Notice End Date: 07/03/2026
Posting Date: 07/01/2026
Notice Identifier: 179882
Required Response Indicator Description: No response required
For Gas Day July 2, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Cameron LNG Feed
[CAPACITY CONSTRAINT] ANT PIP RESTRICTION SEG 187BH EFF 7-7-26
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): CAPACITY CONSTRAINT Notice Type Desc (2): SEGMENTS
Notice Eff Date/Time: 07/01/2026 1:01:00PM Notice End Date/Time: 07/02/2026 9:00:00am
Post Date/Time: 7/1/2026 1:01:00 PM Notice ID: 402464
Reqrd Rsp: 1 Rsp Date: 7/1/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: ANT PIP RESTRICTION SEG 187BH EFF 7-7-26
Notice Text:
ANTICIPATED PRIMARY IN THE PATH RESTRICTION AT STA 110 (SEGMENT 187 BH) EFFECTIVE 7-7-2026
Based on current nominations, maintenance updates and operational conditions, effective Timely Cycle for gas day of Tuesday, July 7, 2026, and continuing until further notice, Tennessee anticipates scheduling Primary In the Path (“PIP”) transports to no less than 88% of contract MDQ pathed through STA 110 (Segment 187 BH).
The stated scheduling percentage is based upon the current level of firm capacity contracted for during this restriction and is subject to change based upon operational conditions and Shipper utilization.
Please contact your Account Director or Scheduling Representative if you have any questions.
..
Natural Gas Pipeline (NGPL)
[CAPACITY CONSTRAINT] SEGMENT 25 EAST- STA 302 - PRIMARY ONLY
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038449
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-21T19:28:00+00:00
Effective: 2026-07-21T19:30:00+00:00
End: 2026-07-22T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
Gulf South Pipeline Notice 5038449
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038449
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
TSP :
078444247
Post Date/Time :
07/21/2026 07:28:00 PM
Notice Effective Date/Time :
07/21/2026 07:30:00 PM
Notice End Date/Time :
07/22/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Calcasieu Power Lake Charles (SLN 20862) is currently underperforming.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/21/2026 7:28:36 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/21/2026 07:28:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/21/2026 07:30:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/22/2026 09:00:00 AM
Notice ID :
5038449
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
Notice Text :
Calcasieu Power Lake Charles (SLN 20862) is currently underperforming.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/21/2026 7:28:36 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038448
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-21T16:42:00+00:00
Effective: 2026-07-21T16:45:00+00:00
End: 2026-07-22T09:00:00+00:00
Subject: Failure to Take Confirmed Quantities at Interconnecting Location
Gulf South Pipeline Notice 5038448
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038448
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at Interconnecting
Location
TSP :
078444247
Post Date/Time :
07/21/2026 04:42:00 PM
Notice Effective Date/Time :
07/21/2026 04:45:00 PM
Notice End Date/Time :
07/22/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
26024 Socagee Midstream Gas Services Llc is currently underperforming by 100%. Intraday
nomination adjustments may be made if performance doesn't Improve.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/21/2026 4:42:53 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/21/2026 04:42:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/21/2026 04:45:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/22/2026 09:00:00 AM
Notice ID :
5038448
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at Interconnecting
Location
Notice Text :
26024 Socagee Midstream Gas Services Llc is currently underperforming by 100%. Intraday
nomination adjustments may be made if performance doesn't Improve.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/21/2026 4:42:53 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/22/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Delhi Southbound
Author: Author: T0001375
Notice Text
ANR has planned maintenance on the Southeast Mainline located in Richland Parish, Louisiana. As a result, capacity will be reduced as follows:
8/10 – 8/21 Delhi Southbound (LOC #FPDELHSB): 150 MMcf/d (leaving 1,064 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
10% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Gulf South Pipeline
Failure to Take Confirmed Quantities at Interconnecting Location
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038447
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-21T14:46:00+00:00
Effective: 2026-07-21T14:50:00+00:00
End: 2026-07-22T09:00:00+00:00
Subject: Failure to Take Confirmed Quantities at Interconnecting Location
Gulf South Pipeline Notice 5038447
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038447
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at Interconnecting
Location
TSP :
078444247
Post Date/Time :
07/21/2026 02:46:00 PM
Notice Effective Date/Time :
07/21/2026 02:50:00 PM
Notice End Date/Time :
07/22/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Bayou Sale/Shadyside (To Sng) (SLN 177) is currently underperforming by 100%. Intraday
nomination adjustments may be made if performance doesn't Improve.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/21/2026 2:47:01 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/21/2026 02:46:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/21/2026 02:50:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/22/2026 09:00:00 AM
Notice ID :
5038447
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at Interconnecting
Location
Notice Text :
Bayou Sale/Shadyside (To Sng) (SLN 177) is currently underperforming by 100%. Intraday
nomination adjustments may be made if performance doesn't Improve.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/21/2026 2:47:01 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/21/2026 6:52:57AM Notice End Date/Time: 07/22/2026 9:00:00am
Post Date/Time: 7/21/2026 6:52:57 AM Notice ID: 402938
Reqrd Rsp: 1 Rsp Date/Time: 7/21/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402615
Subject: TGP SUMMER MAINTENANCE UPDATE MTG TODAY
Notice Text:
TGP's 2026 SUMMER MAINTENANCE TEAMS MEETING 7-21-2026 TODAY
As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its next 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of July and all of August and September 2026 today, Tuesday, July, 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only. Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems. There will be a question and answer segment immediately following.
The presentation will be posted to the EBB no later than 12:00 PM CST today.
Please see TEAMS info below:
TGP Summer Maintenance and Outages TEAMS Meeting
Join on your computer, mobile app or room device
________________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK
Meeting ID: 235 794 931 318 69
Passcode: Vg6AB2AN
Need help | System reference
Dial in by phone
+1 346-410-0970,,694003306# United States, Houston
Find a local number
Phone conference ID: 694 003 306#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
..
Transco
Station 50 (Job 361708) Outage 2026 Planned Outage and Maintenance Summary
SEV 2/5
Maintenance0.100 Bcf/d1 Days
Transco is performing a planned one-day compressor station outage at Station 50 West (MP 517.23) on September 9, 2026 for safety systems testing. The event restricts south-to-north flow through the TSB, reducing available throughput from 1,535 MDt/d design capacity to 1,435 MDt/d, a loss of approximately 0.100 Bcf/d. Estimated shipper impact is 0-5% of primary firm volumes based on historical utilization.
Single-day planned Transco maintenance on September 9 removes approximately 0.100 Bcf/d of southbound-to-northbound capacity at Station 50 West; impact is negligible with 94% of design capacity remaining available and no firm curtailments expected.
Reroute: Moderate: Southern Natural Gas (SNG/EGT) and Tennessee Gas Pipeline serve overlapping Southeast-to-Northeast corridors and can absorb minor displacement volumes given the small capacity reduction involved.
View original notice text
Pipeline: Transco
Notice: Station 50 (Job 361708) Outage 2026 Planned Outage and Maintenance Summary
Posted: 07/21/2026 11:52:53 AM
Notice ID: 17080814
Notice 17080814
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/21/2026
Notice Eff Time:
11:52:53 CDT
Notice End Date:
Notice End Time:
Notice ID:
17080814
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/21/2026
Post Time:
11:52:53 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Station 50 (Job 361708) Outage 2026 Planned Outage and Maintenance Summary
Transco will be performing a necessary compressor station outage associated with Job #361708 on its 2026 Planned Outage and Maintenance Summary. This outage is required to perform testing of safety systems at the facility. The current schedule for this maintenance is for
one day on September 9, 2026
.
Operating conditions resulting from this work will require Transco to limit scheduled quantities for all transportation priorities moving south to north through the location indicated below.
The Throughput Section Boundary (TSB) at mainline MP 517.23 (Station 50 West) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name - Location
Location ID
Flow Direction
COMPRESSOR STATION W 50 MP 517.23
9013363
South to North
Design Capacity (MDt/d)
Total Quantity Available (Mdt/d)
% Available Total Primary-Firm vs Design Capacity
% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*
1,535
1,435
94%
0-5%
*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
08/20/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gulf Transmission, LLC (CGT) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. CGT reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised dates – Mainline-100 Casey Creek HDD Pipe Replacement – September 14-30, 2026 (Previously scheduled for September 9-28, 2026)
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
CGT Construction and Maintenance Schedule 7-20-2026.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/22/26
Subject: Subject: CAPACITY POSTING - TIM for July 22, 2026
Author: Author: Tom Koontz
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4166 – CITY OF GALLATIN - 0
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/21/26
Subject: Subject: CAPACITY POSTING - TIM for July 22, 2026
Author: Author: Zachery Heaver
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
630009 - ECA MKTG-TOBIAS - 0 Total Capacity
632810 - OLANTA #1 - 0
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
640616 - Anadarko Midstream Beech Creek - 0
642585 - Hurd - 0 Total Capacity
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 - 0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 - 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - No Restriction
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 - 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 - 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 - 0
LONEOAKB - Lone Oak B MA41 - 0
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 - 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 - 0
SHERWODB - Sherwood B MA42 - 100,000
SMITHFLD - Smithfield MA35 - 0
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 0
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038425
Notice Type: Maintenance/Planned Service Outage
Status: Terminate
Posted: 2026-07-15T11:43:00+00:00
Effective: 2026-07-15T11:45:00+00:00
End:
Subject: Maintenance - Location 8040 Florida
Texas Gas Transmission Notice 5038425
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance/Planned Service Outage
Notice Stat Desc :
Terminate
Notice ID :
5038425
Prior Notice :
5038269
Reqrd Rsp Desc :
No response required
Subject :
Maintenance - Location 8040 Florida
TSP :
115972101
Post Date/Time :
07/15/2026 11:43:00 AM
Notice Effective Date/Time :
07/15/2026 11:45:00 AM
Notice End Date/Time :
Response Date/Time :
Critical :
Notice Text :
Terminating posting due to overlapping outages.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from July 20, 2026 to July 27, 2026
and Notice End Date to August 2, 2026.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from July 13, 2026 to July 20, 2026,
and Notice End Date to July 28, 2026.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from August 10, 2026, to July 13,
2026, and Notice End Date to July 20, 2026.
**************************************************************************************
Superseding previous posting to reflect the correct location name and number.
**************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at Location Name: Florida, Location
Number: 8040, resulting in an outage beginning July 13, 2026. During this maintenance period,
capacity will be reduced to 0 MMBtu/d at this meter location.
Please contact your customer service representative if you have any questions.
For internal purposes only: GCSR 41234
Notice
Page 1 of 1
07/15/2026 11:43:11 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/15/2026 11:43:00 AM
Notice Type Desc :
Maintenance/Planned Service Outage
Notice Effective Date/Time :
07/15/2026 11:45:00 AM
Notice Stat Desc :
Terminate
Notice End Date/Time :
Notice ID :
5038425
Response Date/Time :
Prior Notice :
5038269
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance - Location 8040 Florida
Notice Text :
Terminating posting due to overlapping outages.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from July 20, 2026 to July 27, 2026
and Notice End Date to August 2, 2026.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from July 13, 2026 to July 20, 2026,
and Notice End Date to July 28, 2026.
**************************************************************************************
Superseding previous posting to update Notice Effective Date from August 10, 2026, to July 13,
2026, and Notice End Date to July 20, 2026.
**************************************************************************************
Superseding previous posting to reflect the correct location name and number.
**************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at Location Name: Florida, Location
Number: 8040, resulting in an outage beginning July 13, 2026. During this maintenance period,
capacity will be reduced to 0 MMBtu/d at this meter location.
Please contact your customer service representative if you have any questions.
For internal purposes only: GCSR 41234
07/15/2026 11:43:11 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038427
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-15T11:48:00+00:00
Effective: 2026-08-18T09:00:00+00:00
End: 2026-08-26T09:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission Notice 5038427
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038427
Prior Notice :
5038395
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Youngsville Compressor Station
TSP :
115972101
Post Date/Time :
07/15/2026 11:48:00 AM
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice End Date/Time :
08/26/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding the Notice Text
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day August 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 80,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 80,000 Dth/d
Youngsville East (YVE) will be limited to 200,000 MMBtu/d of flow beginning August 18, 2026.
*******************************************************************************************
Superseding Notice Effective Date to August 18, 2026 and Notice End Date to August 26, 2026
*******************************************************************************************
Superseding Notice Effective Date to July 20, 2026, and Notice End Date to July 27, 2026
*******************************************************************************************
Superseding to correct the capitalization of the Youngsville Compressor Station.
*****************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 280,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
GCSR for internal purposes only: 42240
Notice
Page 1 of 1
07/15/2026 11:48:39 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/15/2026 11:48:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/26/2026 09:00:00 AM
Notice ID :
5038427
Response Date/Time :
Prior Notice :
5038395
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Youngsville Compressor Station
Notice Text :
Superseding the Notice Text
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day August 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 80,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 80,000 Dth/d
Youngsville East (YVE) will be limited to 200,000 MMBtu/d of flow beginning August 18, 2026.
*******************************************************************************************
Superseding Notice Effective Date to August 18, 2026 and Notice End Date to August 26, 2026
*******************************************************************************************
Superseding Notice Effective Date to July 20, 2026, and Notice End Date to July 27, 2026
*******************************************************************************************
Superseding to correct the capitalization of the Youngsville Compressor Station.
*****************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 280,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
GCSR for internal purposes only: 42240
07/15/2026 11:48:39 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038445
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-21T12:31:00+00:00
Effective: 2026-07-21T12:32:00+00:00
End: 2026-09-12T09:00:00+00:00
Subject: Maintenance- Eunice Compressor Station
Texas Gas Transmission Notice 5038445
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038445
Prior Notice :
5038441
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
TSP :
115972101
Post Date/Time :
07/21/2026 12:31:00 PM
Notice Effective Date/Time :
07/21/2026 12:32:00 PM
Notice End Date/Time :
09/12/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update the Notice End Date from August 15th, 2026 to September 12, 2026 at 9:00
********************************************************************************************************************
Superseding to update the Notice Text to state that Locations 9473 & 9493 are increasing -see
notice text below beginning July 18th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 160,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 140,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
Notice
Page 1 of 2
07/21/2026 12:31:59 PM
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
Page 2 of 2
07/21/2026 12:31:59 PM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/21/2026 12:31:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/21/2026 12:32:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
09/12/2026 09:00:00 AM
Notice ID :
5038445
Response Date/Time :
Prior Notice :
5038441
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
Notice Text :
Superseding to update the Notice End Date from August 15th, 2026 to September 12, 2026 at 9:00
********************************************************************************************************************
Superseding to update the Notice Text to state that Locations 9473 & 9493 are increasing -see
notice text below beginning July 18th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 18, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 160,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 140,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
07/21/2026 12:31:59 PM
Page 1 of 2
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
07/21/2026 12:31:59 PM
Page 2 of 2
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038429
Notice Type: Maintenance
Status: Initiate
Posted: 2026-07-15T13:59:00+00:00
Effective: 2026-07-17T09:00:00+00:00
End: 2026-07-24T09:00:00+00:00
Subject: Posted Maintenance Events for 07/17/2026 - 07/23/2026
Gulf South Pipeline Notice 5038429
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038429
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 07/17/2026 - 07/23/2026
TSP :
078444247
Post Date/Time :
07/15/2026 01:59:00 PM
Notice Effective Date/Time :
07/17/2026 09:00:00 AM
Notice End Date/Time :
07/24/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=830912
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/15/2026 1:59:56 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical/Planned Service Outage
Post Date/Time :
07/15/2026 01:59:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/17/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/24/2026 09:00:00 AM
Notice ID :
5038429
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 07/17/2026 - 07/23/2026
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=830912
If you have any questions, please contact your customer service representative.
07/15/2026 1:59:56 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038433
Notice Type: Maintenance
Status: Initiate
Posted: 2026-07-16T16:46:00+00:00
Effective: 2026-08-18T09:00:00+00:00
End: 2026-08-22T09:00:00+00:00
Subject: Index 816-1 Meter Maintenance
Gulf South Pipeline Notice 5038433
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038433
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Index 816-1 Meter Maintenance
TSP :
078444247
Post Date/Time :
07/16/2026 04:46:00 PM
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice End Date/Time :
08/22/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at Index 816-1.
The following Scheduling Groups are subject to impact:
Expansion Receipts Upstream Tallulah Scheduling Group
Gas Day 8/18-8/21:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/16/2026 4:47:02 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/16/2026 04:46:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
08/22/2026 09:00:00 AM
Notice ID :
5038433
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 816-1 Meter Maintenance
Notice Text :
Gulf South is performing maintenance at Index 816-1.
The following Scheduling Groups are subject to impact:
Expansion Receipts Upstream Tallulah Scheduling Group
Gas Day 8/18-8/21:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
07/16/2026 4:47:02 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038434
Notice Type: Maintenance
Status: Initiate
Posted: 2026-07-16T16:48:00+00:00
Effective: 2026-09-14T09:00:00+00:00
End: 2026-09-26T09:00:00+00:00
Subject: Heidelberg Compressor Station Maintenance
Gulf South Pipeline Notice 5038434
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038434
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Heidelberg Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/16/2026 04:48:00 PM
Notice Effective Date/Time :
09/14/2026 09:00:00 AM
Notice End Date/Time :
09/26/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
- Loc 23373 (Transco (Petal Pipeline))
- Loc 23370 (Transco Hattiesburg)
Combined receipt capacity between Location 23373 and Location 23370 will be limited to 125,000
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Notice
Page 1 of 1
07/16/2026 4:48:47 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/16/2026 04:48:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
09/14/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
09/26/2026 09:00:00 AM
Notice ID :
5038434
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Heidelberg Compressor Station Maintenance
Notice Text :
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
- Loc 23373 (Transco (Petal Pipeline))
- Loc 23370 (Transco Hattiesburg)
Combined receipt capacity between Location 23373 and Location 23370 will be limited to 125,000
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
07/16/2026 4:48:47 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038435
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-16T16:49:00+00:00
Effective: 2026-09-15T09:00:00+00:00
End: 2026-09-16T09:00:00+00:00
Subject: Update: Index 818 Pipeline Maintenance
Gulf South Pipeline Notice 5038435
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038435
Prior Notice :
5038247
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 818 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
07/16/2026 04:49:00 PM
Notice Effective Date/Time :
09/15/2026 09:00:00 AM
Notice End Date/Time :
09/16/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
------------------------------------------------------------------------------------------------
Updated Description:
------------------------------------------------------------------------------------------------
Gulf South will be performing maintenance on Index 818.
The following locations will temporarily be shut-in as the pig passes:
- Loc 22723 (Bay Springs (To SNG) Expansion)
- Loc 23378 (Leaf River Storage)
- Loc 22129 (Tennessee Heidelburg (Expansion))
- Loc 22128 (Clark County (To Destin))
- Loc 24504 (NextEra (Lowman) Choctaw County)
- Loc 22108 (Rock Springs/Scott Mtn (To Transco 85))
Based on current operating conditions, no capacity impact is expected.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/16/2026 4:49:59 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/16/2026 04:49:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
09/15/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
09/16/2026 09:00:00 AM
Notice ID :
5038435
Response Date/Time :
Prior Notice :
5038247
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 818 Pipeline Maintenance
Notice Text :
Updated Description:
------------------------------------------------------------------------------------------------
Updated Description:
------------------------------------------------------------------------------------------------
Gulf South will be performing maintenance on Index 818.
The following locations will temporarily be shut-in as the pig passes:
- Loc 22723 (Bay Springs (To SNG) Expansion)
- Loc 23378 (Leaf River Storage)
- Loc 22129 (Tennessee Heidelburg (Expansion))
- Loc 22128 (Clark County (To Destin))
- Loc 24504 (NextEra (Lowman) Choctaw County)
- Loc 22108 (Rock Springs/Scott Mtn (To Transco 85))
Based on current operating conditions, no capacity impact is expected.
If you have any questions, please contact your customer service representative.
07/16/2026 4:49:59 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038436
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-16T16:56:00+00:00
Effective: 2026-08-18T09:00:00+00:00
End: 2026-08-22T09:00:00+00:00
Subject: Tallulah Compressor Station Maintenance
Gulf South Pipeline Notice 5038436
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038436
Prior Notice :
5038328
Reqrd Rsp Desc :
No response required
Subject :
Tallulah Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/16/2026 04:56:00 PM
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice End Date/Time :
08/22/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
-----------------------------------------------------------------------------
Gulf South will be performing maintenance at Tallulah Compressor Station.
The following groups are subject to impact:
Expansion Receipts Upstream Tallulah Scheduling Group
Gas Day 8/18-8/21:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/16/2026 4:56:15 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/16/2026 04:56:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/22/2026 09:00:00 AM
Notice ID :
5038436
Response Date/Time :
Prior Notice :
5038328
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Tallulah Compressor Station Maintenance
Notice Text :
Updated Description:
-----------------------------------------------------------------------------
Gulf South will be performing maintenance at Tallulah Compressor Station.
The following groups are subject to impact:
Expansion Receipts Upstream Tallulah Scheduling Group
Gas Day 8/18-8/21:
Capacity could be impacted by as much as 100,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
07/16/2026 4:56:15 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038440
Notice Type: Maintenance
Status: Initiate
Posted: 2026-07-17T16:08:00+00:00
Effective: 2026-08-25T09:00:00+00:00
End: 2026-08-29T09:00:00+00:00
Subject: Mira Compressor Station Maintenance
Gulf South Pipeline Notice 5038440
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038440
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Mira Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/17/2026 04:08:00 PM
Notice Effective Date/Time :
08/25/2026 09:00:00 AM
Notice End Date/Time :
08/29/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Mira Compressor Station.
Higher than normal operating pressures are expected in the Bennington/Sherman Area.
The following scheduling group is subject to impact:
Gulf Crossing Paris Throughput Scheduling Group
Gas Day 8/25-8/27:
Capacity could be impacted by as much as 200,000 dth/d for the duration of the maintenance.
This maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 8/28:
Capacity could be impacted by as much as 425,000 dth/d for the duration of the maintenance.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/17/2026 4:08:10 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/17/2026 04:08:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/25/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
08/29/2026 09:00:00 AM
Notice ID :
5038440
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Mira Compressor Station Maintenance
Notice Text :
Gulf South will be performing maintenance at Mira Compressor Station.
Higher than normal operating pressures are expected in the Bennington/Sherman Area.
The following scheduling group is subject to impact:
Gulf Crossing Paris Throughput Scheduling Group
Gas Day 8/25-8/27:
Capacity could be impacted by as much as 200,000 dth/d for the duration of the maintenance.
This maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 8/28:
Capacity could be impacted by as much as 425,000 dth/d for the duration of the maintenance.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
07/17/2026 4:08:10 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038443
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-20T08:51:00+00:00
Effective: 2026-07-28T09:00:00+00:00
End: 2026-08-01T09:00:00+00:00
Subject: Update: Index 296 Pipeline Maintenance
Gulf South Pipeline Notice 5038443
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038443
Prior Notice :
5038280
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 296 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
07/20/2026 08:51:00 AM
Notice Effective Date/Time :
07/28/2026 09:00:00 AM
Notice End Date/Time :
08/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised date range:
-------------------------------------------------------------------------------------------------
Revised date range:
-------------------------------------------------------------------------------------------------
Gulf South will be performing maintenance on Index 296
The following location will be temporarily shut-in as the pig passes:
- Loc 21805 (Discovery Gas Transmission)
- Loc 9694 (Bully Camp Fld Gas Lift Operations)
- Loc 9154 (Sabine Fee #1 Well)
- Loc 45 (Golden Meadow City Gate)
- 1 ATMOS Farmtap
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/20/2026 8:52:04 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/20/2026 08:51:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/28/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/01/2026 09:00:00 AM
Notice ID :
5038443
Response Date/Time :
Prior Notice :
5038280
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 296 Pipeline Maintenance
Notice Text :
Revised date range:
-------------------------------------------------------------------------------------------------
Revised date range:
-------------------------------------------------------------------------------------------------
Gulf South will be performing maintenance on Index 296
The following location will be temporarily shut-in as the pig passes:
- Loc 21805 (Discovery Gas Transmission)
- Loc 9694 (Bully Camp Fld Gas Lift Operations)
- Loc 9154 (Sabine Fee #1 Well)
- Loc 45 (Golden Meadow City Gate)
- 1 ATMOS Farmtap
If you have any questions, please contact your customer service representative.
07/20/2026 8:52:04 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order --- LIFTED EFF 7/20
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/20/2026
Notice End Date: 10/18/2026
Posting Date: 07/20/2026
Notice Identifier: 180658
Prior Notice Identifier: 180503
Required Response Indicator Description: No response required
Zone
Gas Day July 19
Gas Day July 20 and until further notice
M1-24"
OFO In Effect: No Due Pipe 5% / 500
No OFO*
M1-30"
No OFO*
No OFO*
M2-24"
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
M2-30"
No OFO*
No OFO*
No OFO*
No OFO*
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6481
Notice Type: Maintenance
Subject: LINE AC INTEGRITY DIGS
Posted: Mon Jul 20 09:07:00 CDT 2026
Effective: Wed Aug 26 09:00:00 CDT 2026
End Date: Thu Oct 01 09:00:00 CDT 2026
EGT Critical Notices
TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Critical notice
Notice Effective Date: 08/26/2026
Notice Effective Time: 09:00
Notice End Date: 10/01/2026
Notice End Time: 09:00
Notice Identifier: 6481
Notice Status Description: Initiate
Notice Type: Maintenance
Posting Date/Time: 07/20/2026 09:07
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject: LINE AC INTEGRITY DIGS
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C of EGT s Tariff to notify all parties of
planned maintenance on EGT s Line AC in the South Pooling Area beginning Wednesday, August 26th,
2026, with an expected completion date of Thursday, October 1st, 2026 at 09:00.
During this maintenance, a series of integrity digs will be conducted along EGT s Line AC. Be advised,
there is no capacity impact associated with the integrity digs, but should a determination be made that a
repair is necessary, there could be a capacity reduction associated with the repair. Depending upon the
nature of any required repair, the announcement of a capacity reduction could come at short notice.
This alert will be updated should more information become available throughout the series of digs.
If you have any questions concerning this Alert, please contact your scheduling representative.
For a more readable version of this document click
Here
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26093016
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/20/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260720.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
08/20/26
Subject: Subject: CAPACITY POSTING - TIM for July 21, 2026
Author: Author: John Whited
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
* 630009 - ECA MKTG-TOBIAS - * 0 Total Capacity
* 632810 - OLANTA #1 - * 0 Total Capacity
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
* 640616 - Anadarko Midstream Beech Creek - * 0 Total Capacity
* 642585 - Hurd - * 0 Total Capacity
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 - 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - No Restriction
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 - 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 - 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 - 0
LONEOAKB - Lone Oak B MA41 - 0
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 - 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 - 0
SHERWODB - Sherwood B MA42 - 100,000
SMITHFLD - Smithfield MA35 - 0
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 0
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/20/2026 6:57:07AM Notice End Date/Time: 07/21/2026 9:00:00am
Post Date/Time: 7/20/2026 6:57:07 AM Notice ID: 402921
Reqrd Rsp: 1 Rsp Date/Time: 7/20/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402615
Subject: TGP SUMMER MAINTENANCE UPDATE REMINDER
Notice Text:
TGP's 2026 SUMMER MAINTENANCE TEAMS MEETING 7-21-2026 REMINDER
As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its next 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of July and all of August and September 2026 on Tuesday, July, 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only. Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems. There will be a question and answer segment immediately following.
Please see TEAMS info below:
TGP Summer Maintenance and Outages TEAMS Meeting
Join on your computer, mobile app or room device
________________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK
Meeting ID: 235 794 931 318 69
Passcode: Vg6AB2AN
Need help | System reference
Dial in by phone
+1 346-410-0970,,694003306# United States, Houston
Find a local number
Phone conference ID: 694 003 306#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/20/2026 6:48:01AM Notice End Date/Time: 07/21/2026 9:00:00am
Post Date/Time: 7/20/2026 6:48:01 AM Notice ID: 402920
Reqrd Rsp: 1 Rsp Date/Time: 7/20/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402753
Subject: OFO CD1 LIFTED STA 1-STA 40 EFF 7-20
Notice Text:
OFO DAILY CRITICAL DAY 1 FROM STA 1 TO STA 40 LIFTED EFFECTIVE 7-20-2026
Effective for the Gas Day (“GD”) of Monday, July 20, 2026 Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is LIFTING the current OFO Daily Critical Day (“CD”) 1 from STA 1 to STA 40 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
The current OFO remains effective for LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-19-26
GD 7-20-26 and until further notice
Zone 0
Critical Day 1
100 Line Only
(Includes Segments 101, 109, 117, 125, 132 Only)
· Receipts do not overdeliver
· Deliveries do not undertake
NO OFO
Zone L
Critical Day 1
500 Line Only
(Includes Segments 527, 529, 530 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Critical Day 1
500 Line Only
(Includes Segments 527, 529, 530 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 1
Critical Day 1
500 Line Only
(Includes Segments 534, 539 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Critical Day 1
500 Line Only
(Includes Segments 534, 539 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 2
No OFO
No OFO
Zone 3
No OFO
No OFO
Zone 4
No OFO
No OFO
Zone 5
NO OFO
NO OFO
Zone 6
NO OFO
NO OFO
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Pipeline Conditions
Posted: 07/17/2026 01:01:46 PM
Notice ID: 17068542
Notice 17068542
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/17/2026
Notice Eff Time:
13:01:46 CDT
Notice End Date:
Notice End Time:
Notice ID:
17068542
Notice Stat Desc:
Supersede
Notice Type Desc:
Oper Alert
Post Date:
07/17/2026
Post Time:
13:01:46 CDT
Prior Notice:
17058967
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Pipeline Conditions
Posting Date: 07/17/2026 13:01
Effective Date: 07/18/2026
Available Make Up Quantity (Dts)
Zone
Shipper
OBA
Incremental
TT03
TT04
TT03
TT63
TT04
TT64
Park
Loan
1
Y
Y
Y
Y
Y
Y
Y
Y
2
Y
Y
Y
Y
Y
Y
Y
Y
3
Y
Y
Y
Y
Y
Y
Y
Y
4
Y
Y
Y
Y
Y
Y
Y
Y
4A
Y
Y
Y
Y
Y
Y
Y
Y
4B
Y
Y
Y
Y
Y
Y
N/A
N/A
5
Y
Y
Y
Y
Y
Y
Y
Y
6
Y
Y
Y
Y
Y
Y
Y
Y
Leidy Line
Y
Y
Y
Y
Y
Y
N/A
N/A
TT03 - Imbalance Payback From TSP (Due To Shipper/OBA)
TT04 - Imbalance Payback To TSP (Due From Shipper/OBA)
TT63 - Prior Month Imbalance Payback From TSP (Due To OBA)
TT64 - Prior Month Imbalance Payback To TSP (Due From OBA)
Park/Loan/ISS: For more information regarding availability, any shipper interested in receiving daily park and loan specifics over ICE chat, and prior to scheduling, please call: Chris 713.215.2566 or Collin 281.253.6885.
Excess WSS Injection - Not Available
Excess GSS Injection - Not Available
Excess ESS Injection - Not Available
Excess GSS Withdrawal - Not Available
Excess WSS Withdrawal - Not Available
Excess ESS Withdrawal - Not Available
WSS/GSS/ESS: For more information, please contact your Transportation Services representative
Pool tolerance - .5%
Transco force balances the pool during the ID 3 cycle
For OFO information - Watch Critical Notices
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #6
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13945
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #6
Posted: 7/17/2026 11:50:42 AM
Effective: 7/17/2026 11:50:42 AM
End Date: 12/31/9000
TRAILBLAZER MAINTENANCE SCHEDULE JULY 2026 – UPDATE #6
Trailblazer is updating the Maintenance Schedule to remove the Bertrand Compressor Station
Maintenance for July 20, through July 24. It will be rescheduled at a later date.
All other items remain the same as posted under notice ID 13942.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, Rockies Express Pipeline LLC (“REX”) will be
performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This
maintenance event is posted under notice ID 13755 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to the following through Segment 20
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 808 MDth/d
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 663 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – CHEYENNE HUB COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 200 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). The following receipt locations in the Cheyenne Hub will be impacted:
• WIC/TPC Dull Knife (Location 5001)
• CIG/TPC Tomahawk (Location 3856)
• TIGT/TPC Beacon Camp (Location 56127P)
• REX/TPC Lone Tree (Location 42717PR)
• PSCO/TPC Weld (Location 3907)
These locations will be scheduled to the following net receipts quantities by day:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 399 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 689 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 250 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Wednesday, July 8, 2026: 348 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 240 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13940 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Monday, July 20, 2026 through Gas Day Friday, July 24, 2026: 698 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #6
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Rockies Express
Notice ID: 13944
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #6
Posted: 7/17/2026 11:49:23 AM
Effective: 7/17/2026 11:49:23 AM
End Date: 12/31/9000
REX MAINTENANCE SCHEDULE FOR JULY 2026 – UPDATE #6
REX is updating the Maintenance Schedule to remove the Bertrand Compressor Station Maintenance
for July 20, through July 24. It will be rescheduled at a later date.
All other items remain the same as posted under notice ID 13940.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, REX will be performing maintenance at
its Bertrand Compressor Station (Seg 250). Operating capacity will be limited to the following capacities
in the West to East direction through Segment 250.
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 1,115 MDth/d.
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 914 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026, REX will be performing
maintenance at its Chandlersville Compressor Station (Segment 380). Operating capacity will be limited
to 2,903 MDth/d in the East to West direction through Segment 380. At this capacity level, primary and
secondary firm quantities, as well as ITS/AOR are at risk of not being scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
REX will be performing maintenance at its Washington Courthouse Compressor Station (Segment 380).
Operating capacity will be limited to the following capacities on the following gas days in the East to
West direction through Segment 380:
• Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026: 2,903 MDth/d.
• Gas Day Monday, July 13, 2026, through Gas Day Thursday, July 16, 2026: 2,922 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHEYENNE HUB COMPRESSOR STATION MAINTENANCE (SEG 160 and 200)
REX will be performing maintenance at its Cheyenne Hub Compressor Station (Segment 160 and 200).
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 200:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 467 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 838 MDth/d
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 160:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 1,777 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 1,913 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
REX will be performing maintenance at its Bertrand Compressor Station (Seg 250). Operating capacity
will be limited to the following in the West to East direction through Segment 250:
• Gas Day Tuesday, July 8, 2026: 467 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
REX will be performing maintenance at the Julesburg Compressor Station (Segment 240). Operating
capacity will be limited to the following in the West to East direction through Segment 240:
• Gas Day Monday, July 20, 2026 through Gas Day Friday, July 24, 2026: 937 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/17/26
07/17/26
08/17/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gas Transmission, LLC (TCO) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. TCO reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised end date – VM-107/VM-108 Pipeline Maintenance – July 8-30, 2026 (Previously scheduled to end on July 20, 2026)
* Revised restrictions – Line 1758 Pipeline Maintenance – July 21 – September 15, 2026
* Revised dates – Summerfield Compressor Station Maintenance – August 2026
* O1463 Pipeline Maintenance – August 31 – September 8, 2026
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
TCO Construction and Maintenance Schedule 07-17-2026.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/17/26
07/17/26
08/17/26
Subject: Subject: CAPACITY POSTING - TIM for July 18, 2026 through July 20, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 0
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 0
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 0
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/16/2026 2:31:39PM Notice End Date/Time: 07/17/2026 9:00:00am
Post Date/Time: 7/16/2026 2:31:39 PM Notice ID: 402843
Reqrd Rsp: 1 Rsp Date/Time: 7/16/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: TGP Outage Impact Report
Notice Text:
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
Seven Day Forecast (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station / Seg
Est Nominal
Operating Capacity (Thousand Dth)
Monday
(7/20)
Tuesday
(7/21)
Wednesday
(7/22)
Thursday
(7/23)
Friday
(7/24)
Saturday
(7/25)
Sunday
(7/26)
Primary Outage(s) that may Impact Throughput
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 409
(Donna Line) (segment 490 FH)
564
564
564
564
564
564
564
564
Station 1
(segment 101 BH)
399
399
399
399
399
399
399
399
Station 9
(segment 109 BH)
1,027
890
(137)
890
(137)
890
(137)
890
(137)
890
(137)
890
(137)
890
(137)
MLV 11-1A to MLV 11-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 12-1 to MLV 11-1A: PHMSA Immediate (7/15/2026 - 7/27/2026)
MLV 13-1 to MLV 12-1: Anomaly Remediation (7/15/2026 - 7/27/2026)
Station 17
(segment 117 FH)
1,122
1000
(122)
1000
(122)
1000
(122)
1000
(122)
1000
(122)
1000
(122)
1000
(122)
MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
Station 25
(segment 125 FH)
1,078
1070
(8)
1070
(8)
1070
(8)
1070
(8)
1070
(8)
1070
(8)
1070
(8)
MLV 25-2 to MLV 26-2: Pipe Replacement (7/15/2026 - 7/29/2026) MLV 26-2 Relocation: Highway 59 Widening (M) (7/15/2026 - 7/29/2026)
Station 47
(segment 143 FH)
1,343
1330
(13)
1330
(13)
1330
(13)
1330
(13)
1330
(13)
1330
(13)
1330
(13)
MLV 55-1 to MLV 56-1: PHMSA Immediate (5/11/2026 - 7/31/2026)
MLV 61-1 to MLV 62-1: Anomaly Remediation (7/23/2026 - 7/30/2026)
Station 63
(segment 163 FH)
1,242
1117
(125)
1117
(125)
1117
(125)
1117
(125)
1117
(125)
1117
(125)
1117
(125)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)
Station 823
(segment 823 BH)
734
734
734
734
734
734
734
734
Station 534 South of Pool (segment 530 BH)
1,550
985
(565)
985
(565)
985
(565)
985
(565)
985
(565)
985
(565)
985
(565)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 529: Unit 1A - Engine Inspection (7/21/2026)
Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)
MLV 548
(segment 542 BH)
1,647
1600
(47)
1600
(47)
1600
(47)
1600
(47)
1600
(47)
1600
(47)
1600
(47)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026)
Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 7/31/2026)
Station 860
(segment 548 BH)
1,593
1580
(13)
1580
(13)
1580
(13)
1580
(13)
1580
(13)
1,593
1,593
Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 7/24/2026)
Station 860 North (Segment 860
BH)
1,874
1846
(28)
1846
(28)
1846
(28)
1846
(28)
1846
(28)
1846
(28)
1846
(28)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)
Station 110
(segment 187 BH)
(south thru Kentucky)
2,685
2150
(535)
2150
(535)
2150
(535)
2150
(535)
2150
(535)
2150
(535)
2150
(535)
MLV 101-1 to MLV 102-1: Anomaly Remediation (7/20/2026 - 7/25/2026) MLV 102-1 to MLV 103-1: Anomaly Remediation (7/26/2026 - 7/30/2026) MLV 107-7 to 110-7: Valve Installation & Crossover Work (7/7/2026 - 7/27/2026)
MLV 109-7 to MLV 110-7: Pipe Replacement (7/7/2026 - 7/27/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026)
Sta 871: Unit 1A - Emergent Repair (7/10/2026 - 8/7/2026)
Station 114
(segment 114 BH)
907
726
(181)
726
(181)
726
(181)
726
(181)
726
(181)
726
(181)
726
(181)
MLV 113-2 to MLV 114-2: Emergent Repair (M) (7/7/2026 - 12/31/2026)
Station 204
(Segment 204 BH)
1,828
1,828
1,828
1,828
1,828
1,828
1,828
1,828
Station 245
(segment 245 FH)
986
970
(16)
970
(16)
970
(16)
970
(16)
970
(16)
970
(16)
970
(16)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)
MLV 256 West
(segment 249 FH)
1,203
535
(668)
535
(668)
1,203
535
(668)
1,203
1,203
1,203
MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (7/20/2026) MLV 249-2 to MLV 254-2: Hardspot/Geo (7/23/2026)
MLV 249-2 to MLV 254-2: MFL-A/IMU (7/21/2026)
Station 261 Discharge East (segment 261
FH)
888
888
888
888
888
888
888
888
Station 307
(segment 307 BH)
1,153
1115
(38)
1115
(38)
1115
(38)
1115
(38)
1115
(38)
1115
(38)
1115
(38)
Sta 219: Unit 1B - Protective Device Checks & GHG (7/20/2026 - 7/24/2026) Sta 219: Unit 1B - Save Air System (7/20/2026 - 7/31/2026)
Station 315
(segment 315 BH)
1,823
1,823
1,823
1,823
1,823
1,823
1,823
1,823
Station 321
(segment 321 FH)
2,102
2,102
1715
(387)
1715
(387)
1715
(387)
2,102
2,102
2,102
Sta 321: Station Valves for ESD System (7/21/2026 - 7/23/2026)
MLV 324
(segment 324 FH)
1,767
1,767
1,767
1,767
1,767
1,767
1,767
1,767
Station 405 HC Line (segment 299
FH)
794
794
794
794
794
794
794
794
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.
Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
July 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(6/29 - 7/5)
Week 2
(7/6 - 7/12)
Week 3
(7/13 - 7/19)
Week 4
(7/20 - 7/26)
Week 5
(7/27 - 8/2)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 409 (Donna Line) (segment 490
FH)
564
564
Station 1
(segment 101 BH)
399
399
Station 9
(segment 109 BH)
1,027
885
(142)
MLV 11-1A to MLV 11-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 12-1 to MLV 11-1A: PHMSA Immediate (7/15/2026 - 7/27/2026)
MLV 13-1 to MLV 12-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 16-1 to MLV 15-1: PHMSA Immediate (7/28/2026 - 8/3/2026)
MLV 16-1R to MLV 16-1: PHMSA Immediate (7/28/2026 - 8/3/2026)
Station 17
(segment 117 FH)
1,122
1000
(122)
MLV 17-3DL to MLV 18-3A: Anomaly Remediation (7/27/2026 - 8/2/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
Station 25
(segment 125 FH)
1,078
1070
(8)
MLV 25-2 to MLV 26-2: Pipe Replacement (7/15/2026 - 7/29/2026) MLV 26-2 Relocation: Highway 59 Widening (M) (7/15/2026 - 7/29/2026)
Station 47
(segment 143 FH)
1,343
1025
(318)
MLV 55-1 to MLV 56-1: PHMSA Immediate (5/11/2026 - 7/31/2026)
MLV 61-1 to MLV 62-1: Anomaly Remediation (7/23/2026 - 7/30/2026) Sta 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (7/27/2026 -
7/31/2026)
Station 63
(segment 163 FH)
1,242
1117
(125)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)
Station 823
(segment 823 BH)
734
734
Station 834
(segment 834 BH)
683
600
(83)
Sta 834: Station Outage (7/29/2026 - 7/31/2026)
Station 534 South of Pool (segment 530
BH)
1,550
985
(565)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026)
Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)
MLV 548
(segment 542 BH)
1,647
1600
(47)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026)
Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 7/31/2026)
Station 860
(segment 548 BH)
1,593
1580
(13)
Sta 555: Unit 4A - Engine Maintenance (7/27/2026 - 8/1/2026)
Station 860 North (Segment 860
BH)
1,874
1846
(28)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)
Station 110
(segment 187 BH)
(south thru Kentucky)
2,685
2150
(535)
MLV 102-1 to MLV 103-1: Anomaly Remediation (7/26/2026 - 7/30/2026) MLV 107-7 to 110-7: Valve Installation & Crossover Work (7/7/2026 - 7/27/2026)
MLV 109-4 to 110-4: Valve Installation & Crossover Work (7/28/2026 - 8/11/2026)
MLV 109-4 to MLV 110-4: Pipe Replacement (7/28/2026 - 8/11/2026) MLV 109-7 to MLV 110-7: Pipe Replacement (7/7/2026 - 7/27/2026)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (7/27/2026 - 8/31/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026)
Sta 871: Unit 1A - Emergent Repair (7/10/2026 - 8/7/2026)
Station 114
(segment 114 BH)
907
726
(181)
MLV 113-2 to MLV 114-2: Emergent Repair (M) (7/7/2026 - 12/31/2026)
Station 204
(Segment 204 BH)
1,828
1,828
Station 237
(segment 237 FH)
1,006
780
(226)
MLV 237-1 to MLV 245-1: Pig Run - Cleaning/Gauge (7/27/2026) MLV 237-1 to MLV 245-1: Pig Run - MFL-C (7/29/2026)
Station 245
(segment 245 FH)
986
970
(16)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)
MLV 256 West
(segment 249 FH)
1,203
1045
(158)
MLV 253-1 to MLV 253-1R: Anomaly Remediation (7/27/2026 - 8/1/2026)
Station 261 Discharge East (segment 261
FH)
888
888
Station 307
(segment 307 BH)
1,153
1115
(38)
Sta 219: Unit 1B - Save Air System (7/20/2026 - 7/31/2026)
Sta 307: Unit 1A - Protective Device Checks (7/27/2026 - 7/31/2026) Sta 307: Unit 2A - Protective Device Checks (7/27/2026 - 7/31/2026) Sta 307: Unit 3A - Protective Device Checks (7/27/2026 - 7/31/2026) Sta 307: Unit 4A - Protective Device Checks (7/27/2026 - 7/31/2026)
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
July 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(6/29 - 7/5)
Week 2
(7/6 - 7/12)
Week 3
(7/13 - 7/19)
Week 4
(7/20 - 7/26)
Week 5
(7/27 - 8/2)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 313 Discharge (segment 399
FH)
797
720
(77)
Sta 313: Unit 1C - Substation Inspection (7/30/2026 - 7/31/2026)
Station 315
(segment 315 BH)
1,823
1,823
MLV 324
(segment 324 FH)
1,767
1450
(317)
Sta 325: Station Outage (7/28/2026 - 7/30/2026)
Station 405 HC Line (segment 299
FH)
794
794
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
August 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(8/3 - 8/9)
Week 2
(8/10 - 8/16)
Week 3
(8/17 - 8/23)
Week 4
(8/24 - 8/30)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 409 (Donna Line) (segment 490
FH)
564
564
564
564
564
Station 1
(segment 101 BH)
399
399
399
399
399
Station 9
(segment 109 BH)
1,027
885
(142)
640
(387)
640
(387)
1,027
MLV 16-1 to MLV 15-1: PHMSA Immediate (7/28/2026 - 8/3/2026) MLV 16-1R to MLV 16-1: PHMSA Immediate (7/28/2026 - 8/3/2026)
MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/13/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/14/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/15/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/16/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/17/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/18/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/19/2026)
MLV 5-2 to MLV 1-2D: Pig Run - TDW MDS (M) (8/20/2026)
Station 17
(segment 117 FH)
1,122
1000
(122)
1100
(22)
1100
(22)
1100
(22)
MLV 19-1 TO MLV 20-1A: Pipe Replacement (M) (8/6/2026 - 9/15/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
Station 25
(segment 125 FH)
1,078
925
(153)
925
(153)
925
(153)
1,078
MLV 26-3 Relocation: Highway 59 Widening (M) (8/3/2026 - 8/20/2026)
Station 47
(segment 143 FH)
1,343
1,343
1105
(238)
1,343
1,343
MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (8/11/2026) MLV 40-4D to MLV 47-4S: Pig Run - Maintenance (8/13/2026)
Station 63
(segment 163 FH)
1,242
901
(341)
901
(341)
1117
(125)
1117
(125)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 77-3 to MLV 77-3A: Pipe Replacements (8/3/2026 - 8/13/2026)
MLV 82-2C to MLV 83-2: Anomaly Remediation (8/3/2026 - 8/7/2026)
Station 823
(segment 823 BH)
734
734
734
734
734
Station 534 South of Pool (segment 530
BH)
1,550
985
(565)
985
(565)
985
(565)
985
(565)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026)
Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)
MLV 548
(segment 542 BH)
1,647
1635
(12)
1635
(12)
1635
(12)
1240
(407)
Sta 542 Dekalb: Annual ESD Test (8/25/2026 - 8/27/2026)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026)
Station 860
(segment 548 BH)
1,593
1,593
1460
(133)
1460
(133)
1460
(133)
Sta 555: Unit 1B - Hot Gas Path (8/10/2026 - 9/11/2026)
Station 860 North (Segment 860
BH)
1,874
1846
(28)
1846
(28)
1846
(28)
1846
(28)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)
Station 110
(segment 187 BH)
(south thru Kentucky)
2,685
2246
(439)
2281
(404)
2070
(615)
1883
(802)
MLV 104-1 to MLV 105-1: Anomaly Remediation (8/6/2026 - 9/6/2026) MLV 109-4 to 110-4: Valve Installation & Crossover Work (7/28/2026 - 8/11/2026)
MLV 109-4 to MLV 110-4: Pipe Replacement (7/28/2026 - 8/11/2026) MLV 109-5 to MLV 109-5A: Pipe Replacement (8/18/2026 - 9/1/2026) MLV 109-5A to MLV 110-5: Pipe Replacement (8/18/2026 - 9/1/2026)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - Cleaning / Gauge (8/25/2026)
MLV 87-3 to MLV 96-3: Pig Run - EMAT (8/27/2026)
MLV 96-3BR to MLV 96-3BL: Spike Test (7/27/2026 - 8/31/2026)
Sta 106: Unit 1D - 4K Solar Turbine Inspection (8/18/2026 - 8/20/2026) Sta 110: Install ESD Silence Covers (8/24/2026 - 8/28/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026) Sta 871: Unit 1A - Emergent Repair (7/10/2026 - 8/7/2026)
Sta 871: Unit 3A - Engine Maintenance (8/24/2026 - 9/11/2026) Sta 875: Unit 1A- 8K Solar Turbine Inspection (8/17/2026 - 8/21/2026)
Sta 96: Unit 2D - Install Ball Grove Valve (8/3/2026 - 8/7/2026)
Station 114
(segment 114 BH)
907
726
(181)
381
(526)
381
(526)
381
(526)
MLV 113-2 to MLV 114-2: Emergent Repair (M) (7/7/2026 - 12/31/2026) MLV 117-3 to MLV 118-3: Special Permit Pipe Replacement (8/10/2026 - 8/30/2026)
MLV 119-2 to MLV 119-2A: Special Permit Pipe Replacement (8/10/2026 -
8/30/2026)
Station 204
(Segment 204 BH)
1,828
1,828
1,828
1,828
1,828
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
August 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(8/3 - 8/9)
Week 2
(8/10 - 8/16)
Week 3
(8/17 - 8/23)
Week 4
(8/24 - 8/30)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 245
(segment 245 FH)
986
970
(16)
970
(16)
970
(16)
970
(16)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)
Station 261 Discharge East (segment 261
FH)
888
888
888
888
888
Station 307
(segment 307 BH)
1,153
965
(188)
1,153
765
(388)
965
(188)
Sta 219: Annual ESD Test & Scrubber Maintenance (8/17/2026 - 8/21/2026) Sta 307 (Pigeon): Annual ESD Test & Maintenance (8/3/2026 - 8/7/2026) Sta 307 (Pigeon): MLV Operators / Air Comp Install / Fuel Skid (8/24/2026 - 8/28/2026)
Station 313 Discharge (segment 399
FH)
797
797
797
515
(282)
797
Sta 313 Coudersport: Annual ESD Test & Maintenance (8/17/2026 - 8/20/2026)
Station 315
(segment 315 BH)
1,823
1,823
1,823
1,823
1,823
Station 317
(segment 317 BH)
1,548
1,548
1,548
1,548
1345
(203)
Sta 317: Annual ESD Test & Maintenance (8/24/2026 - 8/28/2026)
MLV 324
(segment 324 FH)
1,767
1,767
1,767
1,767
1700
(67)
MLV 324-1 to MLV 324-1A: Anomaly Remediation (8/24/2026 - 8/29/2026)
Station 405 HC Line (segment 299
FH)
794
794
794
794
794
Station 224
(segment 224 FH)
388
388
388
388
280
(108)
Station 224: Scrubber Inspections & Filter Change (8/25/2026 - 8/26/2026)
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.
Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
September 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(8/31 - 9/6)
Week 2
(9/7 - 9/13)
Week 3
(9/14 - 9/20)
Week 4
(9/21 - 9/27)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 409A (Alamo) (segment 492 FH)
274
274
125
(149)
274
274
MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/7/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/8/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/9/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - EMAT (M) (9/11/2026)
MLV 409A-101.1 to MLV 409A-103: Pig Runs - MFL-C (M) (9/10/2026)
Station 409 (Donna Line) (segment 490
FH)
564
505
(59)
505
(59)
505
(59)
505
(59)
MLV 409-1 to MLV 406-1: Spike Test (9/1/2026 - 10/31/2026)
Station 1
(segment 101 BH)
399
300
(99)
300
(99)
300
(99)
300
(99)
MLV 1-1D to MLV 5-1: Spike Test (M) (9/1/2026 - 11/2/2026)
Station 9
(segment 109 BH)
1,027
1,027
1,027
1,027
1,027
Station 17
(segment 117 FH)
1,122
1100
(22)
1100
(22)
1100
(22)
1085
(37)
MLV 17-1D to MLV 20-1A: Pig Run - CLEANING (9/21/2026) MLV 17-1D to MLV 20-1A: Pig Run - EMAT (9/24/2026)
MLV 17-1D to MLV 20-1A: Pig Run - GAUGE PLATE (9/22/2026) MLV 17-1D to MLV 20-1A: Pig Run - MFL-C (9/23/2026)
MLV 19-1 TO MLV 20-1A: Pipe Replacement (M) (8/6/2026 - 9/15/2026)
Station 25
(segment 125 FH)
1,078
1,078
1,078
1,078
1,078
Station 47
(segment 143 FH)
1,343
1045
(298)
1045
(298)
1,343
1,343
MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (9/8/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (9/10/2026)
MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (8/31/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (9/1/2026)
MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (9/2/2026)
Station 63
(segment 163 FH)
1,242
1117
(125)
1117
(125)
1117
(125)
1117
(125)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)
Station 823
(segment 823 BH)
734
734
734
734
734
Station 834
(segment 834 BH)
683
683
670
(13)
670
(13)
670
(13)
Sta 834: Unit 1A - Replace Insulation Blanket (9/14/2026 - 9/15/2026) Sta 834: Unit 2A - Replace Insulation Blanket (9/16/2026 - 9/17/2026) Sta 834: Unit 3A - Replace Insulation Blanket (9/18/2026 - 9/19/2026) Sta 834: Unit 4A - Replace Insulation Blanket (9/21/2026 - 9/22/2026)
Sta 834: Unit 4A - Replace Lubrication System (9/7/2026 - 9/11/2026)
Station 534 South of Pool (segment 530
BH)
1,550
985
(565)
1528
(22)
1528
(22)
1528
(22)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026)
Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)
MLV 548
(segment 542 BH)
1,647
1635
(12)
1640
(7)
1640
(7)
1640
(7)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026)
Station 860
(segment 548 BH)
1,593
1460
(133)
790
(803)
1430
(163)
1,593
MLV 546-2 to MLV 547-2: Line Recoat (9/8/2026 - 9/10/2026)
Sta 546: Annual ESD Tests & Maintenance (9/7/2026 - 9/11/2026)
Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (9/14/2026) Sta 555: Unit 1B - Hot Gas Path (8/10/2026 - 9/11/2026)
Station 860 North (Segment 860 BH)
1,874
1846
(28)
1846
(28)
1530
(344)
1846
(28)
Sta 563: Unit 1A - Annual Inspection & Safety Device Check (9/14/2026 - 9/16/2026)
Sta 563: Unit 2A - Annual Inspection/CAV (9/16/2026 - 9/18/2026)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026) Sta 860: Unit 1B - Replace Turbocharger (8/31/2026 - 9/4/2026)
Station 110
(segment 187 BH)
(south thru Kentucky)
2,685
1655
(1030)
2386
(299)
2534
(151)
2534
(151)
MLV 104-1 to MLV 105-1: Anomaly Remediation (8/6/2026 - 9/6/2026) MLV 104-3 to MLV 106-3S: HDD at Kentucky River (9/2/2026 - 9/6/2026) MLV 105-1 to MLV 105-1A: Anomaly Remediation (9/7/2026 - 9/12/2026) MLV 109-3A to MLV 110-3: Pipe Replacement (9/8/2026 - 9/15/2026) MLV 109-5 to MLV 109-5A: Pipe Replacement (8/18/2026 - 9/1/2026) MLV 109-5A to MLV 110-5: Pipe Replacement (8/18/2026 - 9/1/2026)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (7/27/2026 - 8/31/2026)
Sta 106: Unit 2D - 4K Solar Turbine Inspection (9/16/2026 - 9/18/2026) Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026)
Sta 871 Campbellsville: Annual ESD Test (9/1/2026)
Sta 871: Unit 3A - Engine Maintenance (8/24/2026 - 9/11/2026)
-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
September 2026 (updated 07/16/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(8/31 - 9/6)
Week 2
(9/7 - 9/13)
Week 3
(9/14 - 9/20)
Week 4
(9/21 - 9/27)
Primary Outage(s)
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 114
(segment 114 BH)
907
726
(181)
726
(181)
721
(186)
726
(181)
MLV 113-2 to MLV 114-2: Emergent Repair (M) (7/7/2026 - 12/31/2026)
Sta 119A: Unit 1A - Solar Turbine Inspection (9/14/2026 - 9/16/2026)
Station 204
(Segment 204 BH)
1,828
1,828
1760
(68)
1,828
1375
(453)
MLV 214-3 to MLV 219-3: Pig Run - Cal/IMU/MFL-A Combo (M) (9/10/2026)
MLV 214-3 to MLV 219-3: Pig Run - Gauge/Cleaning (M) (9/8/2026) Sta 204: Scrubber Filter Change (9/24/2026 - 9/26/2026)
Sta 209 Cambridge: Scrubber Filter (9/21/2026 - 9/23/2026)
Station 230C (segment 296
FH)
743
743
370
(373)
743
743
Sta 230C: Scrubber / Filter Inspection (M) (9/9/2026 - 9/10/2026)
Station 245
(segment 245 FH)
986
970
(16)
970
(16)
970
(16)
970
(16)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)
Station 261 Discharge East (segment 261
FH)
888
888
888
888
560
(328)
Sta 264 Charlton: Annual ESD Test (9/23/2026 - 9/24/2026)
Station 307
(segment 307 BH)
1,153
1,153
1,153
1,153
1,153
Station 313 Discharge (segment 399 FH)
797
797
220
(577)
220
(577)
797
MLV 313A-101A to MLV 313A-401: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-101L to MLV 313A-101A: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-403 to MLV 313A-404: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-405A to MLV 313A-406: Anomaly Remediation (M) (9/7/2026 -
9/19/2026)
Station 315
(segment 315 BH)
1,823
1,823
1,823
1,823
1,823
Station 321
(segment 321 FH)
2,102
1850
(252)
2,102
2,102
2,102
MLV 321-1L to MLV 322-1: Anomaly Remediation (8/31/2026 - 9/5/2026)
MLV 324
(segment 324 FH)
1,767
1,767
1,767
1,767
1,767
MLV 329
(segment 324 FH)
846
846
830
(16)
830
(16)
830
(16)
MLV 329AS-1 to MLV 329AD-1: Valve Replacement - MLV 329-1 (M) (9/9/2026 - 10/9/2026)
Station 405 HC Line (segment 299
FH)
794
794
794
794
794
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.
Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.
..
Enable Gas Transmission (EGT)
[Enable Gas Transmission (EGT)] [Maintenance] SOUTH POOL INTEGRITY DIGS
SEV 2/5
Maintenance31 Days
Enable Gas Transmission (EGT) has issued a planned maintenance notice for integrity digs in its South Pooling Area beginning August 18, 2026, through September 18, 2026 (31 days). During this period, EGT will not allow IT and Secondary services from its West 1, West 2, Flex, and North Pooling Areas to the South Pooling Area, and will have limited ability to schedule receipts from Line AC meters (including MRT at Glendale and NGPL at Hot Springs) to South Pool delivery points. Shippers are advised to nominate from primary receipt to primary delivery points to maintain highest priority service. No specific capacity volume is stated.
Planned EGT South Pool maintenance restricts interruptible and secondary service flows for 31 days starting August 18; primary firm service is unaffected, so basis impact at Arkla/Oklahoma hubs is minor and shippers have over a month of advance notice to rearrange nominations.
Reroute: Moderate: Gulf South Pipeline and Southern Natural Gas (EGT via Energy Transfer) serve overlapping Arkla Basin and Southeast corridors and can absorb displaced IT volumes; however, shippers with firm South Pool delivery obligations should re-nominate from primary receipt points as directed by EGT.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6478
Notice Type: Maintenance
Subject: SOUTH POOL INTEGRITY DIGS
Posted: Thu Jul 16 15:09:00 CDT 2026
Effective: Tue Aug 18 09:00:00 CDT 2026
End Date: Fri Sep 18 09:00:00 CDT 2026
EGT Critical Notices
TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Critical notice
Notice Effective Date: 08/18/2026
Notice Effective Time: 09:00
Notice End Date: 09/18/2026
Notice End Time: 09:00
Notice Identifier: 6478
Notice Status Description: Initiate
Notice Type: Maintenance
Posting Date/Time: 07/16/2026 15:08
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject: SOUTH POOL INTEGRITY DIGS
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C of EGT s Tariff to notify all parties of
planned maintenance in EGT s South Pooling Area beginning Tuesday, August 18th, 2026, with an
expected completion date of Friday, September 18th, 2026, at 09:00.
A series of integrity digs will be conducted in EGT s South Pooling Area. During this time, EGT will not
allow IT and Secondary services from EGT s West 1, West 2, Flex and North Pooling Areas to EGT s South
Pooling Area. In addition, EGT will have limited ability to schedule receipt nominations from meters that
are located on EGT s Line AC to delivery points or pools located in EGT s South Pooling Area. Meters
include but are not limited to the following;
MP# 802267 MRT at Glendale
MP# 803500 NGPL at Hot Springs
EGT will not be capable of supporting non-ratable IT services in EGT s South Pooling area. Shippers with
delivery points in EGT s South Pooling Area should nominate from their primary receipt point to their
primary delivery point in order to maintain the highest priority level of service.
This alert will be updated should more information become available throughout the series of digs. If
you have any questions concerning this Alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13942
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #5
Posted: 7/16/2026 9:40:14 AM
Effective: 7/16/2026 9:40:14 AM
End Date: 12/31/9000
TRAILBLAZER MAINTENANCE SCHEDULE JULY 2026 – UPDATE #5
Trailblazer is updating the Maintenance Schedule to add the Julesburg Compressor Station
Maintenance for July 20 through July 24.
All other items remain the same as posted under notice ID 13926.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, Rockies Express Pipeline LLC (“REX”) will be
performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This
maintenance event is posted under notice ID 13755 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to the following through Segment 20
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 808 MDth/d
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 663 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – CHEYENNE HUB COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 200 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). The following receipt locations in the Cheyenne Hub will be impacted:
• WIC/TPC Dull Knife (Location 5001)
• CIG/TPC Tomahawk (Location 3856)
• TIGT/TPC Beacon Camp (Location 56127P)
• REX/TPC Lone Tree (Location 42717PR)
• PSCO/TPC Weld (Location 3907)
These locations will be scheduled to the following net receipts quantities by day:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 399 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 689 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 250 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Wednesday, July 8, 2026: 348 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 240 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13940 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Monday, July 20, 2026 through Gas Day Friday, July 24, 2026: 698 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #5
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Rockies Express
Notice ID: 13940
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #5
Posted: 7/16/2026 9:16:12 AM
Effective: 7/16/2026 9:16:12 AM
End Date: 12/31/9000
REX MAINTENANCE SCHEDULE FOR JULY 2026 – UPDATE #5
REX is updating the Maintenance Schedule to add the Julesburg Compressor Station Maintenance for
July 20, through July 24.
All other items remain the same as posted under notice ID 13927.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, REX will be performing maintenance at
its Bertrand Compressor Station (Seg 250). Operating capacity will be limited to the following capacities
in the West to East direction through Segment 250.
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 1,115 MDth/d.
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 914 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026, REX will be performing
maintenance at its Chandlersville Compressor Station (Segment 380). Operating capacity will be limited
to 2,903 MDth/d in the East to West direction through Segment 380. At this capacity level, primary and
secondary firm quantities, as well as ITS/AOR are at risk of not being scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
REX will be performing maintenance at its Washington Courthouse Compressor Station (Segment 380).
Operating capacity will be limited to the following capacities on the following gas days in the East to
West direction through Segment 380:
• Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026: 2,903 MDth/d.
• Gas Day Monday, July 13, 2026, through Gas Day Thursday, July 16, 2026: 2,922 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHEYENNE HUB COMPRESSOR STATION MAINTENANCE (SEG 160 and 200)
REX will be performing maintenance at its Cheyenne Hub Compressor Station (Segment 160 and 200).
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 200:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 467 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 838 MDth/d
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 160:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 1,777 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 1,913 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
REX will be performing maintenance at its Bertrand Compressor Station (Seg 250). Operating capacity
will be limited to the following in the West to East direction through Segment 250:
• Gas Day Tuesday, July 8, 2026: 467 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
REX will be performing maintenance at the Julesburg Compressor Station (Segment 240). Operating
capacity will be limited to the following in the West to East direction through Segment 240:
• Gas Day Monday, July 20, 2026 through Gas Day Friday, July 24, 2026: 937 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
Transco
Station 80-100 MLD Tool Re-Runs (Job 1211799) 2026 Planned Outage and Maintenance Summary
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Station 80-100 MLD Tool Re-Runs (Job 1211799) 2026 Planned Outage and Maintenance Summary
Posted: 07/16/2026 08:25:55 AM
Notice ID: 17064615
Notice 17064615
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/16/2026
Notice Eff Time:
08:25:55 CDT
Notice End Date:
Notice End Time:
Notice ID:
17064615
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/16/2026
Post Time:
08:25:55 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Station 80-100 MLD Tool Re-Runs (Job 1211799) 2026 Planned Outage and Maintenance Summary
Due to unacceptable data gathered during the previous tool run (June 11), Transco will be performing an additional pipeline integrity assessment on Mainline D between Station 80 and Station 100 associated with Job#1211799 on its 2026 Planned Outage and Maintenance Summary. Operating Conditions resulting from this work may require Transco to restrict scheduled quantities for transportation priorities moving south to north through the location indicated below. Based on historical scheduled quantities, Transco does not anticipate impacts to primary firm services. However, some impacts to non-primary services are expected. Unforeseen issues including, but not limited to nominations, weather, or other factors impacting system operating conditions may result in more significant scheduling reductions than expected.
Pig Runs
Dates
Cleaner Tool
August 12
MFL Tool
August 14
The location Throughput Section Boundary (“TSB”) listed below will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSB and the available quantity of all transportation priorities during the indicated period.
TSB Name - Location
Location ID
Flow Direction
ML Sta 80 TSB
9012483
South to North
Estimated Outage
Location ID
Design Capacity (Dt/d)
Total Quantity
Available (Dt/d)
% Available Total Primary-Firm vs Design Capacity
% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*
August 12 & 14
9012483
3,421,000
2,931,000
86%
0%
*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
Texas Eastern Transmission (TETCO)
07/16/2026- TE Operational Flow Order --- LIFTED EFF 7/17
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order --- LIFTED EFF 7/17
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/14/2026
Posting Date: 07/16/2026
Notice Identifier: 180503
Prior Notice Identifier: 180466
Required Response Indicator Description: No response required
Zone
Gas Day July 15 and July 16
Gas Day July 17 and until furth notice
M1-24"
No OFO*
OFO In Effect: No Due Pipe 5% / 500
M1-30"
No OFO*
No OFO*
M2-24"
OFO In Effect: No Due Pipe 5% / 500
OFO In Effect: No Due Pipe 5% / 500
M2-30"
OFO In Effect: No Due Pipe 5% / 500
No OFO*
OFO In Effect: No Due Pipe 5% / 500
No OFO*
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Maritimes & Northeast U.S.
07/16/2026- MNUS Customer Specific Operational Flow Order -- LIFTED EFF 7/17
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Customer Specific Operational Flow Order -- LIFTED EFF 7/17
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/14/2026
Posting Date: 07/16/2026
Notice Identifier: 180504
Prior Notice Identifier: 180468
Required Response Indicator Description: No response required
Operational Area
Gas Day July 16
Gas Day July 17 and until further notice
System Wide
No System Wide OFO
No System Wide OFO
Customer Specific
OFO In Effect: No Due Pipe OFO 2% / 250
No OFO
Algonquin Gas Transmission
07/16/2026- AGT Operational Flow Order -- LIFTED -- EFF 7/14
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- LIFTED -- EFF 7/14
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/17/2026
Notice End Date: 10/14/2026
Posting Date: 07/16/2026
Notice Identifier: 180500
Prior Notice Identifier: 180383
Required Response Indicator Description: No response required
Operational Area
Gas Day July 16
Gas Day July 17 and until further notice
System Wide - All Customers
OFO in Effect: No DP 5% / 500
No OFO*
Customer Specific
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Supersede
Prior Notice: 26096020
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/16/26
07/16/26
07/18/26
Subject: Subject: LIFTED: Notice of Phase 2 Warm Weather Operational Conditions & OFO Watch (ML2, ML3, & ML7)
Author: Author: T0001375
Notice Text
Effective immediately, ANR is lifting the Phase 2 Warm Weather Operational Conditions & OFO Watch (Fuel Segment ML2, ML3, & ML7)
Please note that Phase 1 Critical Notice #26092038 and any notices superseding #26092038 (collectively "Critical Notice #26092038"), is still in effect for all remaining areas.
*Previous posting*
Notice of Warm Weather Operational Conditions Phase 2, Effective 7/14/26 through 7/17/26
Effective for gas day 7/14/2026 through end of gas day 7/17/2026, in order to preserve system integrity and to ensure ANR is able to meet scheduled delivery commitments to all of fuel segments ML2, ML3, and ML7; ANR is, in accordance with the General Terms and Conditions, declaring an "Extreme Condition" as that term is defined in ANR's FERC Gas Tariff §6.1, lowering the Swing Percentage from 10% to 5%.
Please note that Phase 1 Critical Notice #26092038 and any notices superseding #26092038 (collectively "Critical Notice #26092038"), is still in effect for all remaining areas.
ANR is requesting, in accordance with §6.6.4 of its FERC Gas Tariff, that all receipt and delivery services, excluding ETS and FTS-3 delivery services, to be at a uniform hourly flow rate over a twenty-four (24) hour period. Rate Schedule FTS-3 shippers are required to be at their contractually agreed upon hourly rate.
All Rate Schedule ETS shippers with an aggregated ETS Delivery Point Group must comply with this posting at the ETS Delivery Point Group level. ETS shippers are restricted to the lower of 1/16th of the respective Delivery Point MDQ, or the contractually agreed upon hourly rate in their Service Agreement at the ETS Delivery Point Group level.
Requests for interruptible and overrun services including ANR's hourly ITS-3 service will be evaluated on a case-by-case basis. Scheduled flows for these interruptible services must also be at a uniform hourly rate over a twenty-four (24) hour period or for ITS-3 service the hourly flow rate will be the rate of the nominated, approved, and scheduled quantity. ANR is also reminding all MBS shippers that volumes not within operating tolerances and not at a uniform hourly flow rate of 1/24th of scheduled nominations will not be permitted.
In addition, ANR is closely monitoring "Unauthorized Overrun" under Rate Schedules FTS-1, FTS-2, FTS-3, FTS-4, FTS-4L, STS, and ETS. Please refer to ANR's FERC Gas Tariff under each rate schedule for further detail and elevated penalties in effect during an "Extreme Condition Situation". Shippers attempting to deliver gas via Unauthorized Overrun may be subject to an "express order to Shipper to cease and desist" and a shipper specific OFO.
ANR reserves the right to revoke any conditionally approved operational flexibility.
Customers requesting short-notice start-up are expected to provide corresponding supply into ANR later in the Gas Day. For customers without the short-notice startup provision in their transportation agreement, requests for a short-notice startup will be evaluated a case-by-case basis.
ANR is NOT declaring an Operational Flow Order (OFO) at this time but is providing Advance Warning to shippers (per §6.8.7 of its FERC Gas Tariff) that this weather event could create the need for ANR to issue an OFO with no additional prior notice to protect system integrity. Actions that may be necessary include, but are not limited to, further curtailing interruptible services, declining to schedule firm secondary nominations, and issuing an offending Shipper specific OFO, or issuing a non-Shipper specific OFO. ANR will continue to monitor system integrity closely and will update the EBB as required.
As a reminder, The Projected Hourly Consumption Forecast (Burn Sheet) for the power plant operations is required to be submitted to ANR prior to any flow or flow changes.
ANR will continue to monitor the system integrity closely and will update this posting as required.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/16/26
07/16/26
08/16/26
Subject: Subject: CAPACITY POSTING - TIM for July 17, 2026
Author: Author: John Whited
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/16/26
07/16/26
08/16/26
Subject: Subject: CAPACITY POSTING - TIM for July 17, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
* LONEOAKB - Lone Oak B MA41 - * 0
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
* WAYNESNO - Waynesburg North MA35 - * 0
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Line 1102
Posted: 07/15/2026 4:10:58PM
Effective: 07/15/2026 4:10:58PM
End Date: 07/16/2026 9:00:00AM
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 07/17/2026
Posting Date: 07/15/2026
Notice Identifier: 180479
Required Response Indicator Description: No response required
For Gas Day July 16, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038426
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-15T11:45:00+00:00
Effective: 2026-07-16T09:00:00+00:00
End: 2026-08-15T09:00:00+00:00
Subject: Maintenance- Eunice Compressor Station
Texas Gas Transmission Notice 5038426
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038426
Prior Notice :
5038404
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
TSP :
115972101
Post Date/Time :
07/15/2026 11:45:00 AM
Notice Effective Date/Time :
07/16/2026 09:00:00 AM
Notice End Date/Time :
08/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Notice
Page 1 of 2
07/15/2026 11:45:26 AM
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
Page 2 of 2
07/15/2026 11:45:26 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/15/2026 11:45:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/16/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/15/2026 09:00:00 AM
Notice ID :
5038426
Response Date/Time :
Prior Notice :
5038404
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
Notice Text :
Superseding to update the Notice Text to state that Location 8040 (Florida Gas) - 0 Dth/d
beginning July 16th.
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 16, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 0 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
07/15/2026 11:45:26 AM
Page 1 of 2
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
07/15/2026 11:45:26 AM
Page 2 of 2
Gulf South Pipeline
Posted Maintenance Events for 07/10/2026 - 07/16/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Customer Specific Operational Flow Order -- EFF 7/16
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 10/13/2026
Posting Date: 07/15/2026
Notice Identifier: 180468
Required Response Indicator Description: No response required
Operational Area
Gas Day July 16
Gas Day July 16 and until further notice
System Wide
No System Wide OFO
No System Wide OFO
Customer Specific
No Customer Specific OFO
OFO In Effect: No Due Pipe OFO 2% / 250
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Maritimes & Northeast Pipeline Limited Partnership (Canada)
Subject: MNCA Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/14/2026
Notice End Date: 10/11/2026
Posting Date: 07/13/2026
Notice Identifier: 180385
Prior Notice Identifier: 180022
Required Response Indicator Description: No response required
Notice Text:
Effective 9:00 AM CCT, July 14, 2026, Maritimes Canada (MNC) requires shippers and point operators not to exceed daily due pipe imbalances of 500 GJ or 10% (whichever is greater) regardless of their cumulative imbalances. As such, MNC will not allow Transaction Type 03 nominations in excess of 500 GJ per contract.
To the extent shippers and/or point operators do not adhere to this requirement, MNC may issue customer specific OFOs pursuant to General Terms and Conditions Section 10, in order to maintain the operational integrity of the system.
Correspondingly, effective 9:00 AM CCT, July 14, 2026, the previously posted imbalance notice is no longer in effect.
This notice will remain in effect until further notice.
Please contact your Operations Account Representative if you have any questions.
East Tennessee Natural Gas
07/12/2026- ETNG Pipeline Conditions for 7/13/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/13/2026
Notice End Date: 07/14/2026
Posting Date: 07/12/2026
Notice Identifier: 180357
Required Response Indicator Description: No response required
For Gas Day July 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/15/26
07/15/26
08/15/26
Subject: Subject: CAPACITY POSTING - TIM for July 16, 2026
Author: Author: John Whited
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/15/26
07/15/26
08/15/26
Subject: Subject: CAPACITY POSTING - TIM for July 16, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/14/2026 7:04:24AM Notice End Date/Time: 07/15/2026 9:00:00am
Post Date/Time: 7/14/2026 7:04:24 AM Notice ID: 402782
Reqrd Rsp: 1 Rsp Date/Time: 7/14/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402615
Subject: TGP SUMMER MAINTENANCE MTG REMINDER 7-21
Notice Text:
TGP's 2026 SUMMER MAINTENANCE TEAMS MEETING 7-21-2026 REMINDER
As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its next 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of July and all of August and September 2026 on Tuesday, July, 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only. Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems. There will be a question and answer segment immediately following.
Please see TEAMS info below:
TGP Summer Maintenance and Outages TEAMS Meeting
Join on your computer, mobile app or room device
________________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK
Meeting ID: 235 794 931 318 69
Passcode: Vg6AB2AN
Need help | System reference
Dial in by phone
+1 346-410-0970,,694003306# United States, Houston
Find a local number
Phone conference ID: 694 003 306#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/14/2026 2:22:07PM Notice End Date/Time: 07/15/2026 9:00:00am
Post Date/Time: 7/14/2026 2:22:07 PM Notice ID: 402792
Reqrd Rsp: 1 Rsp Date/Time: 7/14/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: Sta 245-1 to MLV 249-1 Pig Run
Notice Text:
Project Updates
“***Sta 245-1 to MLV 249-1: Pig Run - Cal/IMU
--7/16/26: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated.
***
Date Change, Previously scheduled 7/15/26.
………………………………
***Sta 245-1 to MLV 249-1: Pig Run - MFL-C
--7/17/26: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated.
***
Date Change, Previously scheduled 7/16/26.
………………………………”
If you have any questions, please contact your Scheduler.
..
TransColorado Gas Transmission
[MAINTENANCE] Operations Planning Report V3 July 2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/14/26
07/14/26
08/14/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gulf Transmission, LLC (CGT) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. CGT reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised restriction – EL200 Pigging Rayne Compressor Station to VS 1204 – July 28-30, 2026
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
CGT Construction and Maintenance Schedule 7-14-2026.pdf
Gulf South Pipeline
Failure to Take Confirmed Quantities at 20862 Calcasieu Power Lake Charles
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038420
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-14T15:07:00+00:00
Effective: 2026-07-14T15:10:00+00:00
End: 2026-07-15T09:00:00+00:00
Subject: Failure to Take Confirmed Quantities at 20862 Calcasieu Power Lake Charles
Gulf South Pipeline Notice 5038420
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038420
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at 20862 Calcasieu
Power Lake Charles
TSP :
078444247
Post Date/Time :
07/14/2026 03:07:00 PM
Notice Effective Date/Time :
07/14/2026 03:10:00 PM
Notice End Date/Time :
07/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 07/14/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
Loc 20862 (Calcasieu Power Lake Charles)
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/14/2026 3:07:18 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/14/2026 03:07:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/14/2026 03:10:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/15/2026 09:00:00 AM
Notice ID :
5038420
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to Take Confirmed Quantities at 20862 Calcasieu
Power Lake Charles
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 07/14/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
Loc 20862 (Calcasieu Power Lake Charles)
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/14/2026 3:07:18 PM
Page 1 of 1
NEXUS Gas Transmission (U.S.)
07/14/2026- NEXUS Pipeline Conditions for 7/15/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/15/2026
Notice End Date: 07/16/2026
Posting Date: 07/14/2026
Notice Identifier: 180439
Required Response Indicator Description: No response required
For Gas Day July 15, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Pipeline Conditions
Posted: 07/14/2026 01:36:23 PM
Notice ID: 17058967
Notice 17058967
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/14/2026
Notice Eff Time:
13:36:23 CDT
Notice End Date:
Notice End Time:
Notice ID:
17058967
Notice Stat Desc:
Supersede
Notice Type Desc:
Oper Alert
Post Date:
07/14/2026
Post Time:
13:36:23 CDT
Prior Notice:
17055966
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Pipeline Conditions
Posting Date: 07/14/2026 13:36
Effective Date: 07/15/2026
Available Make Up Quantity (Dts)
Zone
Shipper
OBA
Incremental
TT03
TT04
TT03
TT63
TT04
TT64
Park
Loan
1
Y
Y
Y
Y
Y
Y
Y
Y
2
Y
Y
Y
Y
Y
Y
Y
Y
3
Y
Y
Y
Y
Y
Y
Y
Y
4
Y
Y
Y
Y
Y
Y
Y
Y
4A
Y
Y
Y
Y
Y
Y
Y
Y
4B
Y
Y
Y
Y
Y
Y
N/A
N/A
5
N
Y
N
N
Y
Y
Y
Y
6
N
Y
N
N
Y
Y
Y
Y
Leidy Line
N
Y
N
N
Y
Y
N/A
N/A
TT03 - Imbalance Payback From TSP (Due To Shipper/OBA)
TT04 - Imbalance Payback To TSP (Due From Shipper/OBA)
TT63 - Prior Month Imbalance Payback From TSP (Due To OBA)
TT64 - Prior Month Imbalance Payback To TSP (Due From OBA)
Park/Loan/ISS: For more information regarding availability, any shipper interested in receiving daily park and loan specifics over ICE chat, and prior to scheduling, please call: Chris 713.215.2566 or Collin 281.253.6885.
Excess WSS Injection - Not Available
Excess GSS Injection - Not Available
Excess ESS Injection - Not Available
Excess GSS Withdrawal - Not Available
Excess WSS Withdrawal - Not Available
Excess ESS Withdrawal - Not Available
WSS/GSS/ESS: For more information, please contact your Transportation Services representative
Pool tolerance - .5%
Transco force balances the pool during the ID 3 cycle
For OFO information - Watch Critical Notices
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Northern Border Pipeline Company
TSP 021632583
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/14/26
07/14/26
11/30/26
Subject: Subject: Construction and Maintenance Schedule - Updated July 14, 2026
Author: Author: Mark Begley
Notice Text
As a courtesy, Northern Border Pipeline (NBPL) hereby notifies customers of the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website. NBPL reminds customers to please check the Maintenance Schedule on a regular basis.
Changes since last posting:
Changes since last posting:
· Remove – Garvin Station 12 Main Lube Oil Valve Work on 7/15
· Add – Wetonka Station 9 Soakwash and Inspection on 8/11
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 NBPL maintenance schedule 071426.pdf
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #4
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13926
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #4
Posted: 7/13/2026 7:03:49 PM
Effective: 7/13/2026 7:03:49 PM
End Date: 12/31/9000
TRAILBLAZER MAINTENANCE SCHEDULE JULY 2026 – UPDATE #4
Trailblazer is updating the Maintenance Schedule to remove the Julesburg Compressor Station
Maintenance for July 14 through July 17, it will be rescheduled at a later date.
All other items remain the same as posted under notice ID 13921.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, Rockies Express Pipeline LLC (“REX”) will be
performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This
maintenance event is posted under notice ID 13755 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to the following through Segment 20
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 808 MDth/d
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 663 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – CHEYENNE HUB COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 200 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). The following receipt locations in the Cheyenne Hub will be impacted:
• WIC/TPC Dull Knife (Location 5001)
• CIG/TPC Tomahawk (Location 3856)
• TIGT/TPC Beacon Camp (Location 56127P)
• REX/TPC Lone Tree (Location 42717PR)
• PSCO/TPC Weld (Location 3907)
These locations will be scheduled to the following net receipts quantities by day:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 399 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 689 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 250 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Wednesday, July 8, 2026: 348 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/14/26
07/14/26
08/14/26
Subject: Subject: CAPACITY POSTING - TIM for July 15, 2026
Author: Author: John Whited
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - 2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #4
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Rockies Express
Notice ID: 13927
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR JULY 2026- UPDATE #4
Posted: 7/13/2026 7:04:01 PM
Effective: 7/13/2026 7:04:01 PM
End Date: 12/31/9000
REX MAINTENANCE SCHEDULE FOR JULY 2026 – UPDATE #4
REX is updating the Maintenance Schedule to remove the Julesburg Compressor Station Maintenance
for July 14 through July 17, it will be rescheduled at a later date.
All other items remain the same as posted under notice ID 13920.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, REX will be performing maintenance at
its Bertrand Compressor Station (Seg 250). Operating capacity will be limited to the following capacities
in the West to East direction through Segment 250.
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 1,115 MDth/d.
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 914 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026, REX will be performing
maintenance at its Chandlersville Compressor Station (Segment 380). Operating capacity will be limited
to 2,903 MDth/d in the East to West direction through Segment 380. At this capacity level, primary and
secondary firm quantities, as well as ITS/AOR are at risk of not being scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
REX will be performing maintenance at its Washington Courthouse Compressor Station (Segment 380).
Operating capacity will be limited to the following capacities on the following gas days in the East to
West direction through Segment 380:
• Gas Day Tuesday, July 7, 2026, through Gas Day Sunday, July 12, 2026: 2,903 MDth/d.
• Gas Day Monday, July 13, 2026, through Gas Day Thursday, July 16, 2026: 2,922 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHEYENNE HUB COMPRESSOR STATION MAINTENANCE (SEG 160 and 200)
REX will be performing maintenance at its Cheyenne Hub Compressor Station (Segment 160 and 200).
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 200:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 467 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 838 MDth/d
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 160:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 1,777 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 1,913 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
REX will be performing maintenance at its Bertrand Compressor Station (Seg 250). Operating capacity
will be limited to the following in the West to East direction through Segment 250:
• Gas Day Tuesday, July 8, 2026: 467 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 1,085 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038418
Notice Type: Scheduling Alert
Status: Initiate
Posted: 2026-07-13T21:09:00+00:00
Effective: 2026-07-13T21:10:00+00:00
End: 2026-07-14T09:00:00+00:00
Subject: EVE Cycle Scheduling Delay - Gas Day 7/14/2026
Gulf South Pipeline Notice 5038418
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Scheduling Alert
Notice Stat Desc :
Initiate
Notice ID :
5038418
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle Scheduling Delay - Gas Day 7/14/2026
TSP :
078444247
Post Date/Time :
07/13/2026 09:09:00 PM
Notice Effective Date/Time :
07/13/2026 09:10:00 PM
Notice End Date/Time :
07/14/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
The EVE scheduled quantities posting for gas day 7/14/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/13/2026 9:09:51 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/13/2026 09:09:00 PM
Notice Type Desc :
Scheduling Alert
Notice Effective Date/Time :
07/13/2026 09:10:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/14/2026 09:00:00 AM
Notice ID :
5038418
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle Scheduling Delay - Gas Day 7/14/2026
Notice Text :
The EVE scheduled quantities posting for gas day 7/14/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
07/13/2026 9:09:51 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038417
Notice Type: Scheduling Alert
Status: Initiate
Posted: 2026-07-13T17:32:00+00:00
Effective: 2026-07-13T17:34:00+00:00
End: 2026-07-14T09:00:00+00:00
Subject: ID2 Cycle Scheduling Delay - Gas Day 7/13/2026
Gulf South Pipeline Notice 5038417
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Scheduling Alert
Notice Stat Desc :
Initiate
Notice ID :
5038417
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
ID2 Cycle Scheduling Delay - Gas Day 7/13/2026
TSP :
078444247
Post Date/Time :
07/13/2026 05:32:00 PM
Notice Effective Date/Time :
07/13/2026 05:34:00 PM
Notice End Date/Time :
07/14/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
The ID2 scheduled quantities posting for gas day 7/13/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/13/2026 5:33:00 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/13/2026 05:32:00 PM
Notice Type Desc :
Scheduling Alert
Notice Effective Date/Time :
07/13/2026 05:34:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/14/2026 09:00:00 AM
Notice ID :
5038417
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
ID2 Cycle Scheduling Delay - Gas Day 7/13/2026
Notice Text :
The ID2 scheduled quantities posting for gas day 7/13/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
07/13/2026 5:33:00 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/13/26
08/13/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gulf Transmission, LLC (CGT) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. CGT reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised end date – Means LDAR Valve Repairs – August 27 – September 3, 2026 (Previously scheduled to end on September 1, 2026)
* Mainline-200 Pipeline Maintenance – August 27 – September 6, 2026
* Revised dates – Hampshire Compressor Station Maintenance – September 9 – November 25, 2026 (Previously scheduled for August 27 – November 12, 2026)
* Golden Meadow Compressor Station Maintenance – September 29-30, 2026
* Centerville Compressor Station Maintenance – October 6-7, 2026
* Lake Arthur Compressor Station Maintenance – October 13-16, 2026
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
CGT Construction and Maintenance Schedule 7-13-2026.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/13/2026 1:42:38PM Notice End Date/Time: 07/14/2026 9:00:00am
Post Date/Time: 7/13/2026 1:42:38 PM Notice ID: 402766
Reqrd Rsp: 1 Rsp Date: 7/13/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: MLV 253-1 to MLV 253-1R Anomaly Remediat
Notice Text:
Project Updates
"***MLV 253-1 to MLV 253-1R: Anomaly Remediation
--7/27/26 through 8/1/26: This project may require taking the pipeline section out of service which could limit throughput and result in restrictions based on customer nominations.
***
Date Change, Previously scheduled 7/12/26 to 7/17/26.
………………………………"
If you have any questions, please contact your Scheduler.
..
Cameron LNG Feed
[MAINTENANCE] MLV 253-1 to MLV 253-1R Anomaly Remediat
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Rockies Express
Notice ID: 13924
Notice Type: Critical notice
Sub-Type: OPERATIONAL ALERT
Subject: TEMPORARY CHANGES TO THE PALS SRO PROGRAM CAPACITY - LIFTED
Posted: 7/13/2026 9:44:01 AM
Effective: 7/13/2026 9:44:01 AM
End Date: 12/31/9000
TEMPORARY CHANGES TO THE PALS SRO PROGRAM CAPACITY –LIFTED
The temporary changes to the PALS SRO Program that were posted on February 3, 2026, under notice
ID 13411 and updated under notice ID 13702 have been lifted. Effective for the Timely cycle, Gas Day
Tuesday, July 14, 2026, the SRO scheduled capacity will be reinstated to a net 100 MDth/d.
The Park or Loan Balance rate will not be charged during the limitation period if the balance is cleared
the first Gas Day following the conclusion of the SRO limitation period. On the first Gas Day following the
conclusion of the limitation period, the charge will be assessed on balances on the system.
Shippers must have an active Master PALS Agreement and a SROP and/or a SROL Agreement in place at
each eligible location in order to access the PALS SRO program. If you have any questions, please contact
your Account Director or Scheduling Representative at 303-763-2906.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): TSP CAPACITY OFFERING Notice Type Desc (2): TSP CAP OFFERING
Notice Eff Date/Time: 07/13/2026 9:00:44AM Notice End Date/Time: 08/14/2026 9:00:00am
Post Date/Time: 7/13/2026 9:00:44 AM Notice ID: 402756
Reqrd Rsp: 1 Rsp Date: 7/13/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: FIRM CAPACITY - EXPANSION OS #1435
Notice Text:
DATE: July 13, 2026 TIME: 9:00 AM CDT
TO: ALL TENNESSEE GAS PIPELINE COMPANY, L.L.C. CUSTOMERS
RE: Non-Binding Open Season for 219 South Project (OPEN SEASON POSTING #1435)
I. General
Tennessee Gas Pipeline Company, L.L.C. (“Tennessee” or “TGP”) is experiencing significant growth in natural gas demand across its system, particularly along its 200 Line, which serves as a bi-directional backbone between Pennsylvania and Tennessee. As such, TGP is holding this non-binding open season (this "Open Season") to solicit interest in its proposed 219 South Project (the “Project”), which is designed to offer firm transportation from points as far north as TGP's Station 219 Pool for deliveries within Pennsylvania, Ohio, West Virgina, Kentucky, and Tennessee. Specifically, the Project may provide up to 530,000 dekatherms per day (“Dth/d”) of north-to-south firm transportation capacity (the “Project Capacity”) from receipt points including (1) the Zone 4 Leg 200 Pool (Station 219) pooling point and (2) receipt points at Tennessee's existing or proposed interconnections (e.g. EGTS, NFG, REX, Kensington, Rover) to delivery points from the Zone 4 Leg 200 Pool (Station 219) to points extending south through Tennessee's Zone 3, Zone 1, and Zone L, including the Zone 1 Station 87 Pooling Point, points on the Broad Run Lateral, and points further south along Tennessee's 100 Leg, 800 Leg, or 500 Leg (the “Project Path”). Based upon Shipper interest, TGP may also offer south-to-north capacity within the Project Path as part of the Project. A map of TGP's proposed Project Path is set forth below:
Map: Hyperlink
This Open Season will commence as of the date and time set forth above and end at 4:00 p.m. CDT on August 13, 2026 (the "Open Season Period"). Unless otherwise indicated, capitalized terms that are used but not defined herein shall have the meanings ascribed to such terms in TGP's FERC Gas Tariff, as it may be amended from time to time (the “Tariff”).
Project Capacity awarded pursuant to this Open Season may be made available through (1) compression facilities, (2) the installation of pipeline loop, (3) the installation of appurtenant facilities and other facility modifications, and (4) the use of capacity reserved pursuant to Article XXVI, Section 5.8 of the General Terms and Conditions of Tennessee's Tariff, each as may be required to meet the specific needs of the Project shippers (such required facilities, the “Project Facilities”).
The commencement date for the Project Capacity (the “Commencement Date”) is anticipated to be December 1, 2029.
II. Open Season/Submission of Bids
To participate in this Open Season, a potential shipper must first submit an executed confidentiality agreement in the form included with this notice and which must be executed by an officer or other duly authorized representative of the potential shipper (the “Confidentiality Agreement”); provided, however, that, Tennessee may, in its sole discretion, elect to waive such requirement if the potential shipper and Tennessee (or any of their respective affiliates) are party to a confidentiality agreement that would cover exchanges of information made in connection with this Open Season, in which event such confidentiality agreement would constitute the “Confidentiality Agreement” for purposes of this Open Season.
Once Tennessee has obtained a fully executed Confidentiality Agreement from a potential shipper, Tennessee will share indicative Project rate information with such potential shipper.
To bid in this Open Season, a potential shipper must then submit a completed Service Request Form (“SRF”) in the form included with this notice, which must be executed by an officer or other duly authorized representative of such potential shipper prior to the expiration of the Open Season Period. A potential shipper's completed timely completed SRF shall constitute such potential shipper's “Bid”.
In its SRF, each potential shipper must specify, among other things, its proposed transportation quantity (“TQ”), contract term (10 year minimum), rate election, receipt point(s), delivery point(s), and any conditions precedent for such potential shipper's commitment to the Project. Potential shippers may request new or existing receipt or delivery points located along the Project Path, as described above. Potential shippers requesting new receipt or delivery point(s) should specify the pipeline or processing facility, or other location, from or to which their gas would be received or delivered by Tennessee.
To the extent a potential shipper has a minimum TQ below which it does not desire Project Capacity or any contingencies to its Bid, it should so indicate in the "Additional Information" section of the SRF.
Tennessee will review any and all requests for new receipt or delivery point(s) and conditions precedent or other requests submitted by potential shippers and will have no obligation, in Tennessee's sole discretion, to award Project Capacity to potential shippers submitting Bids containing locations, or terms and conditions, that are not operationally or economically feasible for the Project.
Potential shippers should submit Bids to:
Tennessee Gas Pipeline Company, L.L.C.
Attention: Lindsey Fritz
Email: tgpbidroom@kindermorgan.com AND Lindsey_Fritz@kindermorgan.com
III. Anchor Shipper Status
A potential shipper that is awarded Project Capacity and that also meets the following requirements, may be designated as an “Anchor Shipper” for the Project. An Anchor Shipper is a shipper that:
1. satisfies Tennessee's creditworthiness requirements for the Project;
2. submits a Bid or executes that definitive Project agreement that contemplates, among other things:
a. a minimum TQ of 200,000 Dth/d of Project Capacity; and
b. a primary term of at least 15 continuous years.
Anchor Shipper benefits may include: (1) limited pro-ration of Project Capacity in this Project Open Season as described in Article IV below; and (2) optional interim capacity (if available before the Commencement Date).
IV. Evaluation Method
Bids will be treated as confidential and will not be disclosed, except as authorized by the bidder or as required by applicable law or regulation. In order to be considered an acceptable Bid, a Bid must, at a minimum, contemplate a primary term of at least 10 years, otherwise comply with any Bid requirements set forth herein or in the SRF, and not contain any proposed receipt or deliver points, or required contract terms, that Tennessee determines are not operationally or economically feasible for the Project. Further, Tennessee may also deem a Bid unacceptable if the potential shipper is not able to demonstrate an ability to satisfy Tennessee's anticipated creditworthiness requirements for the Project, which are further described in Article VII.
Following the close of the Open Season Period, Tennessee will evaluate acceptable Bids, in accordance with any applicable Tariff or regulatory requirements, on a total net present value basis, which shall be calculated using the following factors:
NPV = En [R*(1 / (1+i)**n)]
En = Summation of months 1 through n (Sigma)
n = term in months
R = Incremental firm monthly reservation revenue
i = Monthly Discount Factor of 0.8333%
The term in months ("n") will be no more than two-hundred forty (240) months.
If the total Project Capacity requested in the Open Season pursuant to acceptable Bids exceeds the available Project Capacity, TGP will first award Project Capacity to Anchor Shippers. Project Capacity shall be awarded to acceptable Anchor Shipper Bids with the highest net present value, calculated as described above. As between acceptable Bids of Anchor Shippers of equal net present value, Project Capacity shall be awarded on a pro rata basis. Thereafter, TGP will award any remaining Project Capacity to other potential shippers submitting acceptable Bids with the highest net present value. As between non-Anchor Shipper acceptable Bids of equal NPV, Project Capacity shall be awarded on a pro rata basis.
Once Tennessee has performed the evaluation and, if applicable, allocations described above, Tennessee will notify potential shippers that submitted Bids that were awarded Project Capacity, and the potential shipper(s) submitting winning Bid(s) and Tennessee shall promptly commence negotiation of all applicable service terms. Bids will become binding once the terms thereof are incorporated into binding precedent agreements (or other definitive agreements) that have been duly executed and delivered by the parties thereto.
Tennessee reserves the right, to be exercised on a not unduly discriminatory basis, to continue to market the Project and/or modify the scope of the Project, and to enter into negotiations and execute definitive agreements with any interested shippers with respect to the Project, following the close of the Open Season Period. TGP further reserves (1) the right to reject or accept any Bids for Project Capacity that it receives during this Open Season on a not unduly discriminatory basis and (2) the right to suspend, modify, or terminate further development of the Project in whole or in part.
V. Firm Transportation Service
Service for shippers awarded Project Capacity will be provided under TGP's Rate Schedule FT-A and other applicable provisions of TGP's Tariff.
In addition to the applicable reservation rate selected by each Project shipper, and unless otherwise agreed by such shipper and TGP as set forth in such shipper's precedent agreement, each such shipper shall also be subject to: (1) the applicable Rate Schedule FT-A base applicable commodity; (2) the applicable Rate Schedule FT-A Fuel and Loss Retention Percentage (“F&LR”) and Electric Power Cost Rates (“EPCR”), as approved by the Federal Energy Regulatory Commission (“FERC”) for the Project Capacity, whether generally applicable or incremental; and (3) any and all other applicable surcharges as set forth in TGP's Tariff, including, but not limited to, any applicable annual charge adjustment (“ACA”) surcharge.
VI. TGP's Reservation of Rights
TGP reserves the following rights, in addition to all other rights that TGP has reserved herein or that TGP may have pursuant to its Tariff and FERC policies:
(1) the right, at any time during this Open Season, upon notice and in its sole discretion, to terminate this Open Season, to extend the Open Season Period, to modify this Open Season, or to hold, or not hold, subsequent open seasons for the Project;
(2) the right to clarify and finalize Bids containing non-specific or ambiguous Bid information (including, without limitation, rate, term, and receipt or delivery points) or discrepancies in Bid information; provided, that, TGP shall have no obligation to do so;
(3) the right to reject, on a not unduly discriminatory basis, any Bid, including any Bid that, in TGP's sole determination, is incomplete, is inconsistent with the terms of this Open Season, contains additions or modifications to the terms of this Open Season, is otherwise deficient in any respect, or requests service outside the scope of this Open Season;
(4) the right to modify the scope of the Project; and
(5) the right to not award any portion of the Project Capacity.
This Open Season is subject to all applicable laws, orders, rules, and regulations of authorities having jurisdiction. No request for service shall be binding on TGP unless and until a duly authorized representative of both the requesting party and TGP have executed a binding precedent agreement (or other definitive agreement).
VII. Creditworthiness
Following submission of an executed Confidentiality Agreement, TGP will conduct a credit evaluation of potential shippers. Potential shippers shall provide to TGP such information as it may request to perform such credit evaluation. In the event a potential shipper is deemed non-creditworthy by TGP, the potential shipper will be required provide to TGP, as set forth in any binding precedent agreement, credit assurance applicable to the Project, in form and substance acceptable to TGP in its sole discretion. Such creditworthiness requirements shall remain in effect during the term of a shipper's precedent agreement, as well as the term of such shipper's Project service agreement(s).
VIII. Turnback Capacity Solicitation
Any existing shipper that currently holds firm transportation capacity on TGP that it believes (subject to TGP's evaluation and confirmation in its sole discretion) could be used in lieu of a portion(s) of the proposed Project Capacity, as defined and accepted by TGP, is invited to notify TGP of its desire to permanently relinquish its capacity for use in this Open Season. Any shipper who desires to turn back such capacity must notify TGP, in writing, of the TQ, term, receipt point(s), delivery point(s), contract number(s), the reservation rate at which the shipper is willing to release the capacity back to TGP, and any other relevant information necessary to effectuate the permanent relinquishment of such capacity. In order for TGP to consider any anticipated turnbacks of capacity, such notification must be received by TGP by 4:00 PM CDT on August 13, 2026. This solicitation of turnback capacity is not binding on TGP. Turnback requests are subject to rejection or pro ration based upon the results of this Open Season and this turnback capacity solicitation as determined by TGP in its sole discretion. TGP must remain economically indifferent between the turnback offer and the proposed Project. To the extent TGP accepts a shipper's turnback request, the shipper turning back capacity shall remain responsible for any difference between the rate at which the capacity is turned back to TGP and reservation rate under the Project shipper(s) firm transportation service agreement with TGP for the remaining term of the turnback shipper's firm transportation service agreement, but will not be responsible for any commodity charges, ACA, F&LR, EPCR, or any other authorized usage surcharges associated with the turnback capacity, nor shall shipper be entitled to any credits associated with such capacity.
TGP reserves the right to reject, in its sole discretion, any turnback requests that are incomplete, contain modifications to the terms of the turnback capacity solicitation, are submitted with any conditions on the turnback capacity, or are economically disadvantageous. The final design of the Project will incorporate any successful turnbacks of capacity.
IX. Contact Information
If you have any questions regarding this Open Season, please contact the following:
Lindsey Fritz
713-420-2626
lindsey_fritz@kindermorgan.com
Andoni Vossos
713-420-2054
andoni_vossos@kindermorgan.com
or
For media inquiries, please contact:
Taylor Smith
713-420-2335
newsroom@kindermorgan.com
Tennessee Gas Pipeline Company, L.L.C.
Service Request Form – 219 South Project
Page 1 of 2
Shipper Information:
Company
(Legal name of entity): ______________________________________________
Primary Contact: ______________________________________________
Title: ______________________________________________
Address: ______________________________________________
Telephone: ______________________________________________
Email: ______________________________________________
Project Capacity:
North-to-South TQ*: _________ (in Dth/day)
South-to-North TQ*: _________ (in Dth/day)
Capacity Path:
Receipt Point(s)
Quantity (Dth/day) [1]
Delivery Point(s)
Quantity (Dth/day)[1]
[1] The sum of receipt point quantities must equal the sum of delivery point quantities.
Primary Term: _____ years (10 year minimum; primary term proposals must be in full year increments) beginning on the Commencement Date.*
* Tennessee will consider requests for commencement dates other than the Commencement Date on a not unduly discriminatory basis. If a potential shipper desires a different commencement date, it should indicate its proposed commencement date in the “Additional Information” section below.
Additional Information to Clarify Service Request:
_____________________________________________________________________________ _____________________________________________________________________________
_____________________________________________________________________________
Conditions Precedent for Participation in the Project:
_____________________________________________________________________________ _____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________ _____________________________________________________________________________
_____________________________________________________________________________
Rate Election:
□ Recourse Rate
□ Negotiated Rate
Tennessee Gas Pipeline Company, L.L.C.
Service Request Form –219 South Project
Page 2 of 2
Financial and/or Credit Information:
□ Attached □ Sent Separately
Submitted by:
Name: ______________________________________________
Title: ______________________________________________
Telephone: ______________________________________________
Signature: ______________________________________________
Signature of Duly Authorized Officer or Representative
Date: ______________________________________________
Please return this form to:
Lindsey Fritz
Tennessee Gas Pipeline Company, L.L.C.
1001 Louisiana Street
Houston, TX 77002
Phone: 713-420-2626
Email: tgpbidroom@kindermorgan.com AND Lindsey_Fritz@kindermorgan.com
Confidentiality Agreement
This Confidentiality Agreement, dated as of ___________, 2026 (this “Agreement”), is by and between [NAME OF ENTITY], a [STATE OF FORMATION] [TYPE OF ENTITY] (“Counterparty”), and Tennessee Gas Pipeline Company, L.L.C., a Delaware limited liability company (“TGP”). TGP and Counterparty may sometimes be referred to herein together as the “Parties” and individually as a “Party.” This Agreement sets forth the terms and conditions under which the Parties may disclose certain information to each other of a confidential and proprietary nature.
WHEREAS, TGP has held or is holding an open season (the “Open Season”) for its proposed 219 South Project (the “Project”);
WHEREAS, Counterparty has indicated an interest in acquiring Project capacity through the Open Season process;
WHEREAS, to facilitate discussions, negotiations, and the potential execution of definitive agreements relating to Counterparty's participation in the Project, Counterparty and TGP may each provide or disclose to the other Party certain Confidential Information (as hereinafter defined);
WHEREAS, the Parties wish to enter into this Agreement to set forth the terms and conditions under which each Party may disclose such Confidential Information to the other Party in connection with the Project; and
WHEREAS, for purposes of this Agreement, a Party disclosing Confidential Information to the other Party shall be known as the “Disclosing Party” and the Party receiving such Confidential Information shall be known as the “Receiving Party.”
NOW THEREFORE, in consideration of the covenants and conditions set forth herein and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties hereby agree as follows:
1. DEFINITION OF CONFIDENTIAL INFORMATION
1.1 As used in this Agreement, the term “Confidential Information” shall include all information about the business, financial condition, operations, assets and liabilities of the Disclosing Party and its affiliates, whether: (a) prepared by the Disclosing Party and/or its affiliates, any of its or their respective Representatives (as hereinafter defined), or otherwise; (b) in written, oral, electronic, or other form; (c) identified as “confidential” or otherwise; or (d) prepared prior to, on, or after the date of this Agreement, that is furnished to the Receiving Party or any of its Representatives by or on behalf of the Disclosing Party or any of its Representatives in connection with the Project, regardless of the manner or medium in which such Confidential Information is furnished, including all such information and documentation relating to the financial, tax, accounting, and other information of the Disclosing Party or any of its affiliates regarding business operations, prospects, value, and/or structure, marketing practices and techniques, business strategies and capabilities, business plans, and relationships with customers, suppliers, principals, employees, financing sources, hedging counterparties, contracting counterparties, and others, any such information that is a trade secret within the meaning of applicable trade secret law, and any documentation and materials prepared by the Receiving Party or any of its Representatives containing or based in whole or in part on any Confidential Information. With respect to Counterparty only, “Confidential Information” shall also include (i) the fact that the Parties are in discussions regarding the Project; (ii) any discussions, negotiations, and investigations regarding the terms, conditions, or other facts with respect to the Project, including the status thereof and the existence and terms of this Agreement; and (iii) the fact that Confidential Information has been made available by TGP to Counterparty.
1.2 Notwithstanding the foregoing, Confidential Information shall not include information that the Receiving Party can demonstrate:
(i) is rightfully known to or already in the possession of the Receiving Party or its Representatives prior to its disclosure by the Disclosing Party;
(ii) is or becomes generally available to the public other than as a result of disclosure, directly or indirectly, by the Receiving Party or its Representatives in violation of this Agreement;
(iii) is or becomes available to the Receiving Party or its Representatives on a non-confidential basis from a source other than the Disclosing Party or its affiliates or any of its or their respective Representatives; provided, that such source is not known by the Receiving Party or its Representatives (after due inquiry) to be bound by a confidentiality agreement with or other obligation of confidentiality to the Disclosing Party or its affiliates with respect to such information;
(iv) is independently derived by the Receiving Party or its Representatives without the aid, application, or use of any Confidential Information; or
(v) is authorized in writing by the Disclosing Party for disclosure by the Receiving Party, solely to the extent of such authorization.
2. PERMITTED PURPOSE, USE AND DISCLOSURE OBLIGATIONS
2.1 The Receiving Party may use, and may cause its Representatives to use, the Confidential Information solely to evaluate the feasibility of, and to facilitate discussions, negotiations, and the potential execution of definitive agreements relating to, the Project (the “Permitted Purpose”), and for no other purpose. Furthermore, the Receiving Party shall not, and shall direct its Representatives not to, directly or indirectly, at any time, disclose any Confidential Information to any person (other than the Disclosing Party or its Representatives) in any manner, except that the Receiving Party may disclose Confidential Information to its Representatives who have a bona fide need to know such information for the sole purpose of assisting, and solely to the extent necessary to permit such Representatives to assist, the Receiving Party in connection with the Permitted Purpose; provided, that, prior to the disclosure of the Confidential Information to any of its Representatives, the Receiving Party shall inform such Representatives as to the confidential and proprietary nature of the Confidential Information and shall direct each such Representative to comply with the terms of this Agreement. The Receiving Party shall be liable to the Disclosing Party for any action or omission prohibited under this Agreement by any of its Representatives.
2.2 For purposes of this Agreement, “Representatives” of any person shall mean its affiliates and the employees, directors, partners, officers, members, managers, owners, co-owners, controlling persons, investors, co-investors, joint venturers, debt financing sources, representatives, agents, consultants, and professional advisors of such person and its affiliates (including financial advisors, counsel, and accountants). An “affiliate” of any person shall mean any other person that, directly or indirectly through one or more intermediaries, controls, is controlled by, or is or comes under common control with the first person. For purposes of the foregoing sentence, “control” of a person means the possession of power to direct or cause the direction of management and policies of such person, whether through ownership of voting securities, by contract, or otherwise. The term “person” as used in this Agreement will be interpreted broadly to include any governmental representative or authority or any corporation, company, limited liability company, enterprise, association, partnership, group or other entity or individual.
2.3 The Receiving Party agrees that it will employ procedures that are substantially similar to those it uses to protect its own information of a similar character to protect the confidentiality of any Confidential Information it receives from the Disclosing Party or its Representatives.
2.4 In the event that the Receiving Party or any of its Representatives becomes legally compelled (whether by subpoena, interrogatory, civil investigative demand, court or regulatory order, or otherwise) to disclose any Confidential Information, the Receiving Party will, to the extent permitted and reasonably feasible under the circumstances, provide the Disclosing Party with prompt written notice so that the Disclosing Party may seek a protective order or other appropriate remedy prior to any such disclosure and/or waive compliance with certain provisions of this Agreement. The Receiving Party shall reasonably cooperate with the Disclosing Party in seeking the protective order or other appropriate remedy so that the Confidential Information maintains its confidential and proprietary treatment. In the event that such a protective order or other protective remedy is not obtained or the Disclosing Party waives compliance with the relevant provisions of this Agreement, the Receiving Party will furnish only that portion of the Confidential Information that is legally required to be disclosed, in the opinion of its own counsel, and such Party will exercise its reasonable efforts to obtain reliable assurances that confidential treatment will be accorded the Confidential Information.
2.5 Within 15 days after being requested in writing by the Disclosing Party (which request may be made at any time and from time to time), the Receiving Party shall, and shall direct its Representatives to, either return to the Disclosing Party or destroy all Confidential Information and all documents, materials, or other items containing Confidential Information, without retaining any copies, summaries, or extracts thereof, and shall provide written confirmation of such return and/or destruction to the Disclosing Party within such 15 day period; provided, however, that the Receiving Party and its Representatives shall not be required to return or destroy any electronic copies of any such Confidential Information, or any documents, materials, or other items containing Confidential Information, that shall have been archived in the Receiving Party's or its Representatives' electronic records archival system until such items are destroyed in accordance with the Receiving Party's or its Representatives' normal destruction policies; provided, further, that, notwithstanding any termination or expiration of this Agreement, all provisions of this Agreement shall continue to apply with full force and effect to any materials containing Confidential Information that are retained by Receiving Party or its Representatives following a written request for the return or destruction thereof. Compliance with this Section shall not relieve the Receiving Party of its other obligations under this Agreement.
3. GENERAL
3.1 This Agreement shall be governed by, and construed in accordance with, the laws of the State of Texas, regardless of conflicts of laws principles that might apply the laws of another jurisdiction. EACH PARTY HEREBY CONSENTS TO THE JURISDICTION AND VENUE OF THE COMPETENT STATE AND FEDERAL COURTS LOCATED IN HARRIS COUNTY, TEXAS FOR ANY ACTION BROUGHT UNDER THIS AGREEMENT. EACH PARTY HEREBY IRREVOCABLY WAIVES ANY OBJECTION TO SUCH COURTS ON JURISDICTION, CONVENIENCE OR ANY OTHER GROUND. THE PRECEDING SHALL NOT APPLY TO A PARTY'S SEEKING TO ENFORCE A JUDGMENT OF SUCH COURT IN ANOTHER COURT, VENUE, OR JURISDICTION.
3.2 EACH PARTY HEREBY IRREVOCABLY WAIVES ANY RIGHT TO TRIAL BY JURY.
3.3 IN NO EVENT SHALL A PARTY BE ENTITLED TO RECOVER PUNITIVE, INDIRECT, CONSEQUENTIAL, LOST PROFIT, LOSS OF REVENUE OR OPPORTUNITY, SPECIAL OR EXEMPLARY DAMAGES UNDER THIS AGREEMENT.
3.4 If any provision of this Agreement is declared void or otherwise unenforceable, such provision shall be deemed to have been severed from this Agreement, which shall otherwise remain in full force and effect.
3.5 No failure or delay by a Party in exercising any right, power or privilege hereunder shall operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or further exercise thereof or the exercise of any other right, power or privilege hereunder.
3.6 The Receiving Party hereby acknowledges and agrees that any Confidential Information disclosed to the Receiving Party or its Representatives is considered by the Disclosing Party to be of a special, unique, and proprietary character and that, in the event of any breach or threatened breach of any provision of this Agreement, remedies at law may be inadequate. The Receiving Party agrees, therefore, on behalf of itself and its Representatives, that the Disclosing Party may be entitled to specific performance and injunctive or other equitable relief without any showing of irreparable harm or damage, and the Receiving Party hereby waives, and shall cause its Representatives to waive, any requirement for the securing or posting of any bond or other security in connection with any such remedy. Such remedies shall not be deemed to be the exclusive remedies for any breach or threatened breach of this Agreement, but will be in addition to all other remedies available at law or in equity to the Disclosing Party or any of its affiliates. Any trade secrets included in the Confidential Information will also be entitled to all of the protections and benefits under applicable trade secret law. The Receiving Party hereby waives, and shall use all reasonable efforts to cause its Representatives to waive, any requirement that the Disclosing Party or any of its affiliates submit proof of the economic value of any trade secret or post a bond or other security.
3.7 Neither this Agreement nor disclosure of any Confidential Information to the Receiving Party or its Representatives shall be deemed by implication or otherwise to vest in the Receiving Party or its Representatives rights in or to the Confidential Information, other than the right to use such Confidential Information solely for the Permitted Purpose. The Disclosing Party shall retain sole and exclusive ownership of all right, title, and interest in and to all Confidential Information and any and all materials provided by the Disclosing Party or its Representatives to the Receiving Party or its Representatives hereunder, and all intellectual property rights therein. The Receiving Party's right to use the Confidential Information for the Permitted Purpose is revocable and not coupled with an interest in any Confidential Information. No license by implication, estoppel, or otherwise under any patent, copyright, trade secret, trade mark, or other intellectual property right is granted by the Disclosing Party hereunder, other than any such license or other right to use disclosed Confidential Information for the Permitted Purpose. Neither Party represents or warrants that Confidential Information disclosed hereunder will not infringe any third party's patents, copyrights or trade secrets or other proprietary rights.
3.8 The Receiving Party acknowledges, on behalf of itself and its Representatives, that neither the Disclosing Party nor its Representatives makes any representations or warranties, express or implied, as to the accuracy or completeness of the Confidential Information, that neither the Disclosing Party nor its Representatives shall have any liability whatsoever to the Receiving Party or its Representatives or any other person as a result of the use of the Confidential Information or any errors therein or omissions therefrom by virtue of this Agreement and that the Receiving Party and its Representatives shall assume full responsibility for all conclusions derived from the Confidential Information.
3.9 Both Parties acknowledge and agree that neither Party is obligated to enter into or commence or continue any discussions or negotiations pertaining to the Project, and that no such obligation shall arise unless and until a definitive agreement relating to the Project is executed and delivered by the Parties.
3.10 No agency, partnership, joint venture, or other joint relationship is created by this Agreement. There are no third parties that are intended to benefit from any of the agreements created hereby.
3.11 This Agreement shall not be assignable by Counterparty without the express written consent of TGP. This Agreement shall be binding upon the Parties hereto and upon their respective successors and assigns.
3.12 All notices, consents, approvals, requests, claims, demands, and other communications required or permitted under this Agreement (each, a “Notice”) shall be in writing and may be delivered by personal delivery, by certified or registered United States mail (postage prepaid, return receipt requested), by a nationally recognized overnight delivery service for next day delivery, or by electronic mail to the address shown below in respect of a Party (or at another address designated by a Party by Notice to the other Party). Any Notice delivered or transmitted to a Party as provided above will be deemed to have been given and received on the day it is delivered or transmitted, if it is delivered before 5:00 p.m., local time, on a business day, or on the next business day if it is delivered or transmitted after such time or on a day that is not a business day.
Notice Address(es) for TGP:
Tennessee Gas Pipeline Company, L.L.C.
1001 Louisiana Street
Houston, Texas 77002
Attention: Lindsey Fritz, Director, Business Development
Email: Lindsey_Fritz@kindermorgan.com
Notice Address(es) for Counterparty:
[INSERT FULL LEGAL NAME, ADDRESS, CONTACT, TITLE, EMAIL]
3.13 Except as otherwise provided herein, the restrictions and covenants set forth herein shall terminate and be of no further force and effect upon the two-year anniversary of this Agreement. For the avoidance of doubt, any Confidential Information retained by the Receiving Party or its Representatives following a request for the return or destruction thereof shall remain subject to all provisions of this Agreement notwithstanding the expiration of this Agreement pursuant to this Section 3.13. Following the expiration or termination of this Agreement, the following provisions shall survive for purposes of any claim or dispute relating to the Agreement: 3.1, 3.2, 3.3, and 3.13.
3.14 This Agreement constitutes the entire agreement and supersedes all prior agreements and understandings, both written and oral, between the Parties with respect to the subject matter hereof.
3.15 This Agreement may be executed in one or more counterparts (which may be delivered via emailed .pdf or other electronic means), each of which shall be deemed to be an original, but all of which shall constitute the same agreement.
[Signature page follows.]
IN WITNESS WHEREOF, authorized representatives of the Parties have executed this Agreement as of the date first written above.
Tennessee Gas Pipeline Company, L.L.C.
By: ____________________________________
Name:
Title:
[FULL LEGAL NAME OF COUNTERPARTY]
By: ____________________________________
Name:
Title:
..
Algonquin Gas Transmission
07/13/2026- AGT Operational Flow Order -- EFF 7/14
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- EFF 7/14
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 10/11/2026
Posting Date: 07/13/2026
Notice Identifier: 180383
Required Response Indicator Description: No response required
Operational Area
Gas day July 13
Gas Day July 14 and until further Notice
System Wide - All Customers
No OFO*
OFO In Effect: No DP 5% / 500
Customer Specific
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/13/26
08/13/26
Subject: Subject: CAPACITY POSTING - TIM for July 14, 2026
Author: Author: Zachery Heaver
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
*HartSEG – *2,200,000
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/13/26
08/13/26
Subject: Subject: CAPACITY POSTING - TIM for July 14, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9153 Firestone Plant @ Lake Charles
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038416
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-11T16:13:00+00:00
Effective: 2026-07-11T16:20:00+00:00
End: 2026-07-12T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 9153 Firestone Plant @ Lake Charles
Gulf South Pipeline Notice 5038416
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038416
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 9153 Firestone
Plant @ Lake Charles
TSP :
078444247
Post Date/Time :
07/11/2026 04:13:00 PM
Notice Effective Date/Time :
07/11/2026 04:20:00 PM
Notice End Date/Time :
07/12/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/10/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 9153 Firestone Plant @ Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/11/2026 4:13:55 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/11/2026 04:13:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/11/2026 04:20:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/12/2026 09:00:00 AM
Notice ID :
5038416
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 9153 Firestone
Plant @ Lake Charles
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/10/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 9153 Firestone Plant @ Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/11/2026 4:13:55 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/10/26
07/10/26
08/10/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gas Transmission, LLC (TCO) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. TCO reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised end date – Line H Pipeline Maintenance – April 15 – August 27, 2026 (Previously scheduled to end on August 6, 2026)
* Summerfield Compressor Station Maintenance – July 15, 2026
* SM80 Pipeline Maintenance – September 9-26, 2026
* Revised end date – SM102 Pipeline Maintenance – September 30 – October 11, 2026 (Previously scheduled to end on October 7, 2026)
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
TCO Construction and Maintenance Schedule 07-10-2026.pdf
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #3
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13921
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR JULY 2026 - UPDATE #3
Posted: 7/10/2026 3:42:45 PM
Effective: 7/10/2026 3:42:45 PM
End Date: 12/31/9000
TRAILBLAZER MAINTENANCE SCHEDULE JULY 2026 – UPDATE #3
Trailblazer is updating the Maintenance Schedule to adjust the Bertrand Compressor Station
Maintenance for July 13 through July 17, that has been moved to July 20 through July 24 with adjusted
capacities.
All other items remain the same as posted under notice ID 13885.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026, and Gas Day Monday, June
22, 2026, through Gas Day Wednesday, July 1, 2026, Rockies Express Pipeline LLC (“REX”) will be
performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This
maintenance event is posted under notice ID 13755 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to the following through Segment 20
• Gas Day Tuesday, June 9, 2026, through Gas Day Friday, June 12, 2026: 808 MDth/d
• Gas Day Monday, June 22, 2026, through Gas Day Wednesday, July 1, 2026: 663 MDth/d.
• Evening Cycle Gas Day Wednesday, July 1, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – CHEYENNE HUB COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 200 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). The following receipt locations in the Cheyenne Hub will be impacted:
• WIC/TPC Dull Knife (Location 5001)
• CIG/TPC Tomahawk (Location 3856)
• TIGT/TPC Beacon Camp (Location 56127P)
• REX/TPC Lone Tree (Location 42717PR)
• PSCO/TPC Weld (Location 3907)
These locations will be scheduled to the following net receipts quantities by day:
• Gas Day Tuesday, July 7, 2026, through Gas Day Wednesday, July 8, 2026: 399 MDth/d.
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 689 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 250 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Wednesday, July 8, 2026: 348 MDth/d
• Gas Day Monday, July 20, 2026, through Gas Day Friday, July 24, 2026: 807 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 240 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13846 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Tuesday, July 14, 2026 and Gas Day Thursday, July 16, 2026: 624 MDth/d
• Gas Day Wednesday, July 15, 2026 and Gas Day Friday, July 17, 2026: 698 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
[Planned Outage] Annual Planned Maintenance 2025- 2026 Rev 29 (posted July 10, 2026). Pipeline: Golden Pass Pipeline LLC (Sabine Pass TX → Starks LA). Capacity: up to 2.6 Bcf/d LNG export feed gas. This notice was posted on the Golden Pass Pipeline GasNom EBB under the 'Planned Outage' section.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038411
Notice Type: Gas Quality
Status: Initiate
Posted: 2026-07-10T14:01:00+00:00
Effective: 2026-07-10T14:05:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Safe Harbor Waiver - Loc 24329 Stratton Ridge
Gulf South Pipeline Notice 5038411
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Gas Quality
Notice Stat Desc :
Initiate
Notice ID :
5038411
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Safe Harbor Waiver - Loc 24329 Stratton Ridge
TSP :
078444247
Post Date/Time :
07/10/2026 02:01:00 PM
Notice Effective Date/Time :
07/10/2026 02:05:00 PM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
This is an acknowledgment FLNG agrees to accept off-spec feed gas due to elevated Nitrogen up to
1.1 mol% for Gas Day 7/10/2026.
Freeport reserves the right to rescind the waiver at any time. All shippers delivering to this
location should continue to evaluate their receipts and respective gas quality to make
adjustments to the blended gas quality as necessary for future gas cycles.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/10/2026 2:01:48 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/10/2026 02:01:00 PM
Notice Type Desc :
Gas Quality
Notice Effective Date/Time :
07/10/2026 02:05:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038411
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Safe Harbor Waiver - Loc 24329 Stratton Ridge
Notice Text :
This is an acknowledgment FLNG agrees to accept off-spec feed gas due to elevated Nitrogen up to
1.1 mol% for Gas Day 7/10/2026.
Freeport reserves the right to rescind the waiver at any time. All shippers delivering to this
location should continue to evaluate their receipts and respective gas quality to make
adjustments to the blended gas quality as necessary for future gas cycles.
If you have any questions, please contact your customer service representative.
07/10/2026 2:01:48 PM
Page 1 of 1
El Paso Natural Gas (EPNG)
[CAPACITY CONSTRAINT] ALLIANCE(LOC 37207) - PRIM ONLY LIFT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038409
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-10T10:59:00+00:00
Effective: 2026-07-10T11:15:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 21737 Calcasieu Industries
Gulf South Pipeline Notice 5038409
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038409
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 21737 Calcasieu
Industries
TSP :
078444247
Post Date/Time :
07/10/2026 10:59:00 AM
Notice Effective Date/Time :
07/10/2026 11:15:00 AM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/10/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 21737 Calcasieu Industries
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/10/2026 10:59:47 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/10/2026 10:59:00 AM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/10/2026 11:15:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038409
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 21737 Calcasieu
Industries
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/10/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 21737 Calcasieu Industries
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/10/2026 10:59:47 AM
Page 1 of 1
Algonquin Gas Transmission
07/08/2026- AGT Customer Specific Operational Flow Order -- LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Customer Specific Operational Flow Order -- LIFTED
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/09/2026
Notice End Date: 10/06/2026
Posting Date: 07/08/2026
Notice Identifier: 180139
Prior Notice Identifier: 180093
Required Response Indicator Description: No response required
Operational Area
Gas day July 8
Gas Day July 9 and July 10
Gas Day July 11 and until further Notice
System Wide - All Customers
No OFO*
OFO In Effect: No DP 8% / 500
No OFO*
Customer Specific
OFO In Effect: No DS 5% / 500
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/10/2026 7:29:48AM Notice End Date/Time: 07/11/2026 9:00:00am
Post Date/Time: 7/10/2026 7:29:48 AM Notice ID: 402690
Reqrd Rsp: 1 Rsp Date: 7/10/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402689
Subject: OFO DAILY CD1 EFF 7-11-26 LIFTED 7-13-26
Notice Text:
OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-11-2026 AND LIFTED 7-13-2026
Due to forecasted milder weather with associated lesser demand moving across various areas of the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Saturday, July 11, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is implementing an OFO Daily Critical Day (“CD”) 1 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
Tennessee is lifting the OFO Daily Critical Day 1 for ALL AREAS effective for the Gas Day of Monday, July 13, 2026 and until further notice.
This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-10-2026
GD 7-11-2026
7-13-2026 and until further notice
Zone 0
No OFO
No OFO
NO OFO
Zone L
No OFO
No OFO
NO OFO
Zone 1
No OFO
No OFO
NO OFO
Zone 2
No OFO
No OFO
NO OFO
Zone 3
No OFO
No OFO
NO OFO
Zone 4
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
·
NO OFO
Zone 5
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
No OFO
Zone 6
No OFO
Critical Day 1
All Areas
· Receipts do not overdeliver
· Deliveries do not undertake
No OFO
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038406
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-09T20:38:00+00:00
Effective: 2026-07-09T20:40:00+00:00
End: 2026-07-10T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
Gulf South Pipeline Notice 5038406
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038406
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
TSP :
078444247
Post Date/Time :
07/09/2026 08:38:00 PM
Notice Effective Date/Time :
07/09/2026 08:40:00 PM
Notice End Date/Time :
07/10/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/9/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 20862 Calcasieu Power Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/09/2026 8:38:19 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 08:38:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/09/2026 08:40:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/10/2026 09:00:00 AM
Notice ID :
5038406
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/9/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 20862 Calcasieu Power Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/09/2026 8:38:19 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038404
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-09T16:49:00+00:00
Effective: 2026-07-09T16:50:00+00:00
End: 2026-08-15T09:00:00+00:00
Subject: Maintenance- Eunice Compressor Station
Texas Gas Transmission Notice 5038404
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038404
Prior Notice :
5038394
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
TSP :
115972101
Post Date/Time :
07/09/2026 04:49:00 PM
Notice Effective Date/Time :
07/09/2026 04:50:00 PM
Notice End Date/Time :
08/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Notice
Page 1 of 2
07/09/2026 4:50:02 PM
Internal purposes only: GCSR 41196
Page 2 of 2
07/09/2026 4:50:02 PM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/09/2026 04:49:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/09/2026 04:50:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/15/2026 09:00:00 AM
Notice ID :
5038404
Response Date/Time :
Prior Notice :
5038394
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
Notice Text :
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, the following meters will be limited to the following capacities
starting on Gas Day July 11, 2026:
Location 8758 (Gulf So - Patoutville) - 55,000 Dth/d
Location 9473 (Gulf So - Chacahoula) - 145,000 Dth/d
Location 9493 (Gulf So - S Gibson) - 125,000 Dth/d
Location 8040 (Florida Gas) - 25,000 Dth/d
Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow beginning July 9, 2026.
Please contact your customer service representative if you have any questions.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
07/09/2026 4:50:02 PM
Page 1 of 2
Internal purposes only: GCSR 41196
07/09/2026 4:50:02 PM
Page 2 of 2
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038401
Notice Type: Gas Quality
Status: Initiate
Posted: 2026-07-09T15:51:00+00:00
Effective: 2026-07-09T16:00:00+00:00
End: 2026-07-10T09:00:00+00:00
Subject: Safe Harbor Waiver - Loc 24329 Stratton Ridge
Gulf South Pipeline Notice 5038401
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Gas Quality
Notice Stat Desc :
Initiate
Notice ID :
5038401
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Safe Harbor Waiver - Loc 24329 Stratton Ridge
TSP :
078444247
Post Date/Time :
07/09/2026 03:51:00 PM
Notice Effective Date/Time :
07/09/2026 04:00:00 PM
Notice End Date/Time :
07/10/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
This is an acknowledgement Freeport LNG agrees to accept off-spec feed gas for N2 up to 1.1 MOL %
for the remainder of gas day 7/9/26.
Freeport reserves the right to rescind the waiver at any time. All shippers delivering to this
location should continue to evaluate their receipts and respective gas quality to make
adjustments to the blended gas quality as necessary for future gas cycles.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/09/2026 3:51:49 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 03:51:00 PM
Notice Type Desc :
Gas Quality
Notice Effective Date/Time :
07/09/2026 04:00:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/10/2026 09:00:00 AM
Notice ID :
5038401
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Safe Harbor Waiver - Loc 24329 Stratton Ridge
Notice Text :
This is an acknowledgement Freeport LNG agrees to accept off-spec feed gas for N2 up to 1.1 MOL %
for the remainder of gas day 7/9/26.
Freeport reserves the right to rescind the waiver at any time. All shippers delivering to this
location should continue to evaluate their receipts and respective gas quality to make
adjustments to the blended gas quality as necessary for future gas cycles.
If you have any questions, please contact your customer service representative.
07/09/2026 3:51:49 PM
Page 1 of 1
Gulf South Pipeline
Failure to take confirmed quantities - Loc 21737 Calcasieu Industries
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038402
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-09T16:26:00+00:00
Effective: 2026-07-09T16:27:00+00:00
End: 2026-07-10T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 21737 Calcasieu Industries
Gulf South Pipeline Notice 5038402
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038402
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 21737 Calcasieu
Industries
TSP :
078444247
Post Date/Time :
07/09/2026 04:26:00 PM
Notice Effective Date/Time :
07/09/2026 04:27:00 PM
Notice End Date/Time :
07/10/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/9/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 21737 Calcasieu Industries
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/09/2026 4:26:27 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 04:26:00 PM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/09/2026 04:27:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/10/2026 09:00:00 AM
Notice ID :
5038402
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 21737 Calcasieu
Industries
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/9/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 21737 Calcasieu Industries
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/09/2026 4:26:27 PM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 07/11/2026
Posting Date: 07/09/2026
Notice Identifier: 180230
Required Response Indicator Description: No response required
For Gas Day July 10, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038399
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-09T10:42:00+00:00
Effective: 2026-07-09T11:00:00+00:00
End: 2026-07-31T09:00:00+00:00
Subject: Update: Index 330 Pipeline Maintenance
Gulf South Pipeline Notice 5038399
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038399
Prior Notice :
5038392
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
07/09/2026 10:42:00 AM
Notice Effective Date/Time :
07/09/2026 11:00:00 AM
Notice End Date/Time :
07/31/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Notice
Page 1 of 2
07/09/2026 10:42:54 AM
Tariff.
The following scheduling groups will be subject to impact:
Gas Day 6/15-6/25:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 6/26-7/31:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 550,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Bayou Sale to Napoleonville Scheduling Group
Capacity could be impacted by as much as 250,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Page 2 of 2
07/09/2026 10:42:54 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 10:42:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/09/2026 11:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
07/31/2026 09:00:00 AM
Notice ID :
5038399
Response Date/Time :
Prior Notice :
5038392
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
07/09/2026 10:42:54 AM
Page 1 of 2
Tariff.
The following scheduling groups will be subject to impact:
Gas Day 6/15-6/25:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 6/26-7/31:
Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 550,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Bayou Sale to Napoleonville Scheduling Group
Capacity could be impacted by as much as 250,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
07/09/2026 10:42:54 AM
Page 2 of 2
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038397
Notice Type: Maintenance
Status: Terminate
Posted: 2026-07-09T09:29:00+00:00
Effective: 2026-07-09T09:30:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Hall Summit Compressor Station Maintenance
Gulf South Pipeline Notice 5038397
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5038397
Prior Notice :
5037852
Reqrd Rsp Desc :
No response required
Subject :
Hall Summit Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
07/09/2026 09:29:00 AM
Notice Effective Date/Time :
07/09/2026 09:30:00 AM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at the Hall Summit Compressor Station.
The following groups are subject to impact:
Hall Summit Compressor East Scheduling Group
Gas Day 7/6:
Capacity could be impacted by as much as 200,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Gas Day 7/7-7/10:
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
Notice
Page 1 of 1
07/09/2026 9:29:16 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/09/2026 09:29:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/09/2026 09:30:00 AM
Notice Stat Desc :
Terminate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038397
Response Date/Time :
Prior Notice :
5037852
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Hall Summit Compressor Station Maintenance
Notice Text :
Gulf South is performing maintenance at the Hall Summit Compressor Station.
The following groups are subject to impact:
Hall Summit Compressor East Scheduling Group
Gas Day 7/6:
Capacity could be impacted by as much as 200,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Gas Day 7/7-7/10:
Capacity could be impacted by as much as 300,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
07/09/2026 9:29:16 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038394
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-09T08:51:00+00:00
Effective: 2026-07-09T09:00:00+00:00
End: 2026-08-15T09:00:00+00:00
Subject: Maintenance- Eunice Compressor Station
Texas Gas Transmission Notice 5038394
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038394
Prior Notice :
5038352
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
TSP :
115972101
Post Date/Time :
07/09/2026 08:51:00 AM
Notice Effective Date/Time :
07/09/2026 09:00:00 AM
Notice End Date/Time :
08/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
Notice
Page 1 of 1
07/09/2026 8:51:37 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/09/2026 08:51:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
07/09/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/15/2026 09:00:00 AM
Notice ID :
5038394
Response Date/Time :
Prior Notice :
5038352
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Eunice Compressor Station
Notice Text :
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 325,000 MMBtu/d of flow
beginning July 9, 2026.
********************************************************************************************************************
Superseding to update the Notice Text:
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 340,000 MMBtu/d of
flow.
********************************************************************************************************************
Superseding to update the Compressor Station to Eunice instead of Youngsville.
********************************************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Eunice Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 365,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
Internal purposes only: GCSR 41196
07/09/2026 8:51:37 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038395
Notice Type: Maintenance
Status: Supersede
Posted: 2026-07-09T08:55:00+00:00
Effective: 2026-08-18T09:00:00+00:00
End: 2026-08-26T09:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission Notice 5038395
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038395
Prior Notice :
5038086
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Youngsville Compressor Station
TSP :
115972101
Post Date/Time :
07/09/2026 08:55:00 AM
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice End Date/Time :
08/26/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Superseding Notice Effective Date to August 18, 2026 and Notice End Date to August 26, 2026
*******************************************************************************************
Superseding Notice Effective Date to July 20, 2026, and Notice End Date to July 27, 2026
*******************************************************************************************
Superseding to correct the capitalization of the Youngsville Compressor Station.
*****************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 280,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
GCSR for internal purposes only: 42240
Notice
Page 1 of 1
07/09/2026 8:55:07 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical/Planned Service Outage
Post Date/Time :
07/09/2026 08:55:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
08/18/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
08/26/2026 09:00:00 AM
Notice ID :
5038395
Response Date/Time :
Prior Notice :
5038086
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance- Youngsville Compressor Station
Notice Text :
Superseding Notice Effective Date to August 18, 2026 and Notice End Date to August 26, 2026
*******************************************************************************************
Superseding Notice Effective Date to July 20, 2026, and Notice End Date to July 27, 2026
*******************************************************************************************
Superseding to correct the capitalization of the Youngsville Compressor Station.
*****************************************************************************************
Texas Gas Transmission, LLC will be performing maintenance at the Youngsville Compressor Station.
During this maintenance period, Youngsville East (YVE) will be limited to 280,000 MMBtu/d of
flow.
Please contact your customer service representative if you have any questions.
GCSR for internal purposes only: 42240
07/09/2026 8:55:07 AM
Page 1 of 1
Natural Gas Pipeline (NGPL)
[CAPACITY CONSTRAINT] SEG 24 EAST-STA 346 - PRIM ONLY - LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/09/26
07/09/26
08/09/26
Subject: Subject: CAPACITY POSTING - TIM for July 10, 2026
Author: Author: Dillon Schoolcraft
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - 2,450,000
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/09/26
07/09/26
08/09/26
Subject: Subject: CAPACITY POSTING - TIM for July 10, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Transco
Meter Outage Kinder M3371 (Job 688339) 2026 Planned Outage and Maintenance Summary
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Meter Outage Kinder M3371 (Job 688339) 2026 Planned Outage and Maintenance Summary
Posted: 07/08/2026 02:00:39 PM
Notice ID: 17040951
Notice 17040951
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/08/2026
Notice Eff Time:
14:00:39 CDT
Notice End Date:
Notice End Time:
Notice ID:
17040951
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/08/2026
Post Time:
14:00:39 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Meter Outage Kinder M3371 (Job 688339) 2026 Planned Outage and Maintenance Summary
Transco will be performing a necessary line outage for Sun Kinder Lateral abandonment work associated with Job #688339 on its 2026 Planned Outage and Maintenance Summary. The current schedule for this maintenance is
August 18, 2026 through August 28, 2026.
During the maintenance outage, the location(s) identified below will not be available for scheduling or flow:
Location Name
Location ID
Location Type
Kinder M3371
1006149
Receipt
If you have any questions, please contact your Transportation Services Representative.
Transco
2026 Major Construction and Maintenance Projects
SEV 2/5
Informational
Transco has posted a routine update (Revision 3) to its 2026 major construction and maintenance schedule, noting the addition of a new Pipeline Inspection (ILI) Activities tab. No specific capacity restrictions, affected segments, or volumes are identified in this notice. Impacts are limited to interruptible and secondary firm transportation services, with additional notices to be posted prior to individual maintenance activities.
No new market impact -- this is a routine schedule update with no specific capacity figures or segment restrictions named; market has already priced any previously disclosed 2026 Transco maintenance constraints.
Reroute: Not applicable -- no specific capacity constraint is identified in this notice. When individual maintenance activities are posted with segment-level detail, reroute assessment via Southern Natural Gas (SNG/EGT) and Tennessee Gas Pipeline (TGP) would apply for Southeast corridors.
View original notice text
Pipeline: Transco
Notice: 2026 Major Construction and Maintenance Projects
Posted: 07/02/2026 12:53:19 PM
Notice ID: 17022850
Notice 17022850
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/02/2026
Notice Eff Time:
12:53:19 CDT
Notice End Date:
Notice End Time:
Notice ID:
17022850
Notice Stat Desc:
Supersede
Notice Type Desc:
Maint
Post Date:
07/02/2026
Post Time:
12:53:19 CDT
Prior Notice:
16996695
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
2026 Major Construction and Maintenance Projects
Please be advised that Transco’s major construction and maintenance schedule for projects that are currently planned for 2026 has been updated and can be accessed using the link below. Note the addition of a tab specifically dedicated to Pipeline Inspection (ILI) Activities. The link to the maintenance schedule will also be available on the informational postings portion of the
1Line portal
under the operational information tab.
While significant effort has been made to provide dates for the 2026 schedule, the dates and duration of the planned work are subject to change. Transco will provide revisions to the maintenance schedule as updated information is available.
Some of this work will affect the availability of interruptible transportation services (IT and secondary FT). The extent of this impact will depend on operating conditions at the time of the outage. If a maintenance activity is expected to affect the availability of transportation services, additional information will be posted prior to commencement of that activity.
Click
here
to access the 2026 Maintenance Schedule link.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
07/18/26
Subject: Subject: Notice of Phase 1 Warm Weather Operational Conditions (Posted: 7/8/26)
Author: Author: T0001375
Notice Text
Notice of Warm Weather Operational Conditions Phase 1, Effective 7/11/2026 – 7/17/2026
Due to projected warm weather forecasts, expected operational conditions and nomination levels, it is increasingly important that ANRPL shippers maintain sufficient receipt and delivery volumes to minimize imbalances and ensure system integrity. ANR Pipeline will continue to monitor pipeline operations and the weather forecasts.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Draft
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
08/08/26
Subject: Subject: CAPACITY POSTING - TIM for July 9, 2026
Author: Author: Dillon Schoolcraft
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - 2,350,000
BannSEG - 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - 2,450,000
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
Due Shipper - Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
08/08/26
Subject: Subject: CAPACITY POSTING - TIM for July 9, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 20,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/07/26
07/07/26
08/07/26
Subject: Subject: Assessment of Extreme Condition 6/29/26 – 6/30/26 with Extreme Condition Penalty Waiver
Author: Author: T0001027
Notice Text
Recent extreme weather conditions led ANR Pipeline (ANR) to declare an Extreme Condition Situation (Extreme Condition) as defined in the General Terms and Conditions (GT&C) §6.1 of ANR’s FERC Gas Tariff (Tariff) for 6/29/26 – 6/30/26. The Extreme Condition was applicable in ANR's ML2, ML3, and ML7 zones. In accordance with ANR's Tariff, the Swing Percentage (as defined in ANR's Tariff GT&C §6.1) was lowered from 10% to 5% in those zones during the Extreme Condition.
As part of the Extreme Condition posting, ANR shippers were directed to ensure adequate supply was nominated and simultaneously flowing and maintain a uniform hourly flow unless contractually allowed to use an alternate hourly flow.
ANR carefully monitors and assesses shipper activities during Extreme Condition periods and is pleased to report that shipper compliance strongly contributed to our success in preserving system integrity and meeting scheduled delivery commitments during this Extreme Condition period. We are, as always, grateful for your spirit of teamwork and cooperation.
Accordingly, ANR is waiving its higher Extreme Condition Daily Scheduling Penalties and Unauthorized Overrun Service penalties pursuant to Section 6.18.13 of its Tariff. Extreme Condition penalty rates would have been "the greater of ten dollars ($10.00) or two (2) times the Spot Price Index for the Service Month" as described in ANR's Tariff under applicable rate schedules, subject to allocation rules set in place at each delivery location. This waiver is not an indication of future waivers. Each Extreme Condition will be evaluated independently.
All penalty waivers are posted at www.tceconnects.com, Informational Postings, Other, Penalty Waiver Log.
To clarify, non-critical penalties will apply for the time period above as they do every day across the ANR system. Details on non-critical penalty rates can be found under applicable rate schedules in ANR's Tariff. Please refer to your preliminary invoices or reach out to your ANR Customer Service Representative or Account Coordinator with questions about your specific penalty exposure.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/06/26
07/06/26
08/06/26
Subject: Subject: Construction and Maintenance Schedule Posting
Author: Author: Dillon Schoolcraft
Notice Text
As a courtesy, Columbia Gulf Transmission, LLC (CGT) hereby notifies customers the Construction and Maintenance Schedule posted under "Construction and Maintenance" on the Informational Postings website has been updated. CGT reminds customers to please check the Maintenance Schedule on a regular basis.
The current schedule has been updated to reflect maintenance activity on the following:
* Revised posted capacity – Alexandria Compressor Station Maintenance – July 10, 2026
* Revised dates – Ridgeline Tie-In’s (4166) – July 14-23, 2026 (Previously scheduled for July 21-31, 2026)
* Clementsville ESD Testing – August 11-12, 2026
* Revised end date – Venice MS 595 Rebuild – August 18 – September 24, 2026 (Previously scheduled to end on September 15, 2026)
* Revised dates - Means LDAR valve repair – August 27 – September 1, 2026 (Previously scheduled for July 8-31, 2026)
* Revised dates – Hartsville Compressor Station Maintenance – September 9-30, 2026 (Previously scheduled for August 4-18, 2026)
* Revised end date – Mainline-100 Casey Creek Pipeline Maintenance – September 9-28, 2026 (Previously scheduled to end on September 26, 2026)
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
CGT Construction and Maintenance Schedule 07-06-2026.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/07/26
07/07/26
08/07/26
Subject: Subject: CAPACITY POSTING - TIM for July 8, 2026
Author: Author: Dillon Schoolcraft
Notice Text
COLUMBIA GULF TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gulf Transmission LLC (CGT) posts projections of anticipated restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers should submit nominations for Timely Cycle to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / OFO
A Force Majeure was declared effective June 19, 2026, at Corinth Compressor Station Unit 505. Please see UPDATED Critical Notice ID 26092010 posted on June 30, 2026, for details.
No Operational Flow Order (OFO) is necessary.
============================================================================
============================================================================
Customers are encouraged to monitor scheduled volumes on the Operationally Available Capacity (OAC) screen on Navigates Informational Postings, as nominations may fluctuate based on market conditions.
============================================================================
============================================================================
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Backhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - 2,350,000
* BannSEG - * 2,400,000
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
* AlexSEG - * 2,450,000
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
INTERNAL CONSTRAINTS-- Total Capacity (Net Forwardhaul):
----------------------------------------------------------------------------
StanSEG - Total Capacity
ClemSEG - Total Capacity
HartSEG - Total Capacity
HampSEG - Total Capacity
CorinSEG - Total Capacity
BannSEG - Total Capacity
InvrnSEG - Total Capacity
ShelSEG - Total Capacity
DelhiSEG - Total Capacity
AlexSEG - Total Capacity
RayneSEG - Total Capacity
WLSEG - Total Capacity
ELSEG - Total Capacity
EL300SEG - Total Capacity
HoumaSEG - Total Capacity
----------------------------------------------------------------------------
POINT CONSTRAINTS -- Total Capacity:
----------------------------------------------------------------------------
Note: Points listed are controlled by less than meter capacity.
401 - CROSSTEX-GIBSON - 0
445 - TRANSCO / TERREBONNE - 0
481 - SEA ROBIN-ERATH - 0
3194 - TETCO ADAIR CO., KY (Receipts) - Total Capacity (Primary Only)
4051 - LAFAYETTE - ACADIA - Total Capacity (Primary Only)
4078 - SONAT-SHADYSIDE - Total Capacity (Primary Only)
4098 - BURLINGTON - TERREBONNE - 0
4118 - FLORIDA GAS - Total Capacity (Primary Only)
4123 - EGAN STOR-ACADIA-REC (Receipts and Deliveries) - 370,000
4137 - CLECO-TECHE - Total Capacity (Primary Only)
4186 - DISCOVERY GAS TRANSMISSION (Deliveries) - Total Capacity (Primary Only)
4204D - GULF SOUTH DELHI Delivery - Total Capacity (Primary Only)
4208R - SOUTHEASTERN SUPPLY HEADER (SESH) - Receipt - 0
4221 - GULF CROSSING - Total Capacity (Primary Only)
4222 - Texas Gas (Isola) - 0
4315 - BROADMORE RD (Receipts) - 775,000
5112 - NORAM PERRYVILLE Delivery - Total Capacity (Primary Only)
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
Due Pipe - Available
* Due Shipper - * Not Available
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available on a daily basis to discuss PAL transactions with customers who have executed master PAL service agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in PAL transactions for next-day or longer-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-758-0900 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
----------------------------------------------------------------------------
AUTO PAL AVAILABILITY:
----------------------------------------------------------------------------
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/- 5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
AutoPAL Parks and Loan Payback - Available
AutoPAL Loans and Unparks - Available
* Denotes a change from previous posting.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/06/26
07/06/26
08/06/26
Subject: Subject: CAPACITY POSTING - TIM for July 6, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
MA6SEG - Dayton MA6 - 10,000
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Capacity Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/07/26
07/07/26
08/07/26
Subject: Subject: CAPACITY POSTING - TIM for July 8, 2026
Author: Author: Jonah Skiles
Notice Text
COLUMBIA GAS TRANSMISSION, LLC DAILY CAPACITY POSTING
Columbia Gas Transmission LLC (TCO) posts projections of anticipated market area restrictions at least 24 hours prior to the time when nominations are due. These advance forecasts are subject to change based on actual operating conditions. Customers desiring non-firm services should submit timely nominations to determine whether the service is available under current conditions.
============================================================================
============================================================================
FORCE MAJEURE / STORAGE CRITICAL / TRANSPORT CRITICAL / OFO / RATABLE TAKES
A Force Majeure is necessary effective Gas Day Thursday, October 31, 2024, due to an unexpected mechanical failure at the James Massey Hub meter station in North Hampton County, NC. Please see Critical Notice ID 25918017 for details.
No Critical Day for Storage is necessary.
No Critical Day for Transport is necessary.
No Operational Flow Order (OFO) is necessary.
Ratable Takes are not required in any Market Areas; however, power customers should request non-ratable takes by submitting a burn profile through TCeConnects.
============================================================================
============================================================================
PIPELINE RECEIPTS, DELIVERIES, INTERNAL CONSTRAINTS, AND DISPLACEMENT AVAILABILITY
For receipts, deliveries, and internal constraints not specifically listed below, please refer to ebb.tceconnects.com/Info Post/Capacity/Operationally Available for information on available capacity at each receipt and delivery point and ebb.tceconnects.com/Info Post/Capacity/Est Op Avail Cap - Internal Constraint for available non-firm capacity at each internal constraint.
Columbia may, from time to time, have displacement capacity available at various receipt/delivery points. Displacement nominations are scheduled based on operational availability up to an approved amount not to exceed the scheduled volumes in the physical direction of flow of the meter. Please contact your Customer Services, Marketing, or O&L Representative for availability at points not listed on this notice.
============================================================================
============================================================================
----------------------------------------------------------------------------
POINT CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
633863 - NFG Hartzfelt Mountain - 11,000
640203 - Wagoner Line K - 25,000
740178 - Fairfield - REX - 75,000
743064 - NEXUS MR06 - 75,000
743365 - Quarry Road - 25,000
736626 - DPL CENTERVILLE - 75,000
737067 - Darby Plant - 75,000
821590 - THOMAS COFFMAN INC YOUNG - 0
821917 - A&W-Gandee - 0 Total Capacity
823621 - MOUNTAIN STATE-GRANT - 0
824017- STERLING DRG FETTTY - 0
824766 - TECHNOLOGY DEVELOPMENT - FIELDS - 0
825005 - CENTRAL PACIFIC GROUP SNYDER - 0
826130 - STERLING DRG HARPER - 0
828516 - DORAN-RAINES #1 - 0
833097 - BOSWELLS TAVERN (75-007219) - 0 (Receipts)
833097 - BOSWELLS TAVERN (75-007219) - 100,000
834263 - MCKOWN-JB YOAK LEASE - 0
835078 - RYAN #702 - 0
839166 - Patton - 0
840226 - BenGay MM - 0
840254 - Vandalia - 0 Total Capacity
842446 - Spencer H Line Sales - 0 Total Capacity
842866 - Green Energy Stonewall - 0
843105 - Transco Chantilly - 50,000
900001 - James Massey Hub Lane 1 - 2,000
900002 - James Massey Hub Lane 2 - 2,000
B10 - CAMBRIDGE-9 - 20,000
B15 - UNIONVILLE-35 - 10,000
B17 - HIGHLAND-36 - 20,000
B18 - MILFORD-21 –0
B9 - BROAD RUN-19 - 0 (Receipts)
B9 - BROAD RUN-19 - 0 (Deliveries)
BYBEE - BYBEE - 0 (Deliveries)
C10 - PLEASANT - 0
C14 - WAYNESBURG - 20,000
C15 - UNIONTOWN-35 - 0
C16 - DELMONT-36 - 0 (Receipts)
C16 - DELMONT-36 - 39,500 (Deliveries)
C22 - EAGLE-25 - 0
C23 - PENNSBURG-23 - 0
C41 - TEXAS EASTERN TETCON - 100,000
C45 - Marietta - 0
C9 - HOOKER-5 - 50,000
E13 - EMPORIA, VA-34 - 0
E17 - MARTINS CREEK - 21 - 0 (Receipts)
E17 - MARTINS CREEK - 21 - 15,000 (Deliveries)
E2 - ROCKVILLE-30 - 0
E3 - DOWNINGTOWN-29 - 0
E9 - YNG WOMANS CK-RENOVO - 0
MVPWB - MVP Columbia WB - 0 (Receipts)
MVPWB - MVP Columbia WB - 0 (Deliveries)
----------------------------------------------------------------------------
DELIVERY INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
ARTEMAS - Artemas MA25 – 0
BICKBOSW - Bickers MA33 - No Restriction
CERELANH - Lanham East MA19 - No Restriction
CERELANW - Lanham West MA19 - No Restriction
CORNHART - Corning East MA20 - 0
CRAWNORT - Crawford North MA8 - 0
CSLOSTRI - Lost River CS MA30 - No Restriction
DELMONSO - Delmont South MA36 - 10,000
DOWNEAST - Downingtown East MA24 - 0
GRENCSTL - Greencastle MA25 - No Restriction
HELLHANO - Hellertown MA22 - 0
HIGHLAND - Highland MA38 - 10,000
HOPEWELL - Hopewell MA33 - No Restriction
INDEGLAS - Corning West MA20 - 5,548
KAEAST - KA East MA17 - 0
LANPKA - Lanham PKA MA19 - No Restriction
LEACHSEG - Leach MA19 - No Restriction
LOUDOUN - Loudoun MA28 - No Restriction
LOUISA - Louisa MA33 - No Restriction
MA1SEG - Pavonia to Toledo - 10,000
MA3SEG - Lima MA3 - 10,000
* MA6SEG - Dayton MA6 - * 20,000 (Effective Intraday 1 Cycle 7/7/2026)
MA7SEG - Sandusky MA7 - 60,000
NORTKENT - Northern Kentucky OA6 - No Restriction
PTJRWARW - Wagoner East MA21 - No Restriction
RUTLEDGE - Rutledge North MA28 - 50,000
SENECA - Seneca MA30 - No Restriction
----------------------------------------------------------------------------
RECEIPT INTERNAL CONSTRAINTS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
A03LINEH - Cobb Line H MA18 - 0 Total Capacity
A03LOW - Cobb Northwest MA18 - No Restriction
A03NORTH - Cobb Northeast MA40 - No Restriction
A03SOUTH - Cobb South MA18 - No Restriction
ADALSMIF - Smithfield to Adaline MA35 – 0
ALLIAREC - Alliance Receipts MA4 - 20,000
BOLDMAN - Boldman MA16 - No Restriction
CHSTKENO - Line P North MA16 - 25,000
CLENWAYN - Clendenin to Waynesburg MA35 – 0
COBBA03 - Cobb CS MA18 - No Restriction
CRAWSOUT - Crawford South MA8 - No Restriction
DELMRENO - Delmont MA36 - No Restriction
DOWNWEST - Downingtown West MA24 - 25,000
EASTON - Easton MA21 - 25,000
GRANHAML - KA High MA19 - 25,000
HANCOCK - Hancock MA20 - 0
KA1SCBYB - KA1 Station Camp MA13 - 5,500
KAWEST - KA West MA17 - 0
LEBANON - Lebanon MA6 - 50,000
LONEOAKA - Lone Oak A MA41 – 0
LONEOAKB - Lone Oak B MA41 - 100,000
LXPSEG - LXPSEG MA41 - 0
MAYTHUFF - KA Low MA16 - 0
MXPSEG - MXPSEG MA42 – 100,000
RUTSOUTH - Rutledge South MA28 - 0
SHERWODA - Sherwood A MA42 – 0
SHERWODB - Sherwood B MA42 – 100,000
SMITHFLD - Smithfield MA35 - 100,000
TANNDELM - Line 1711 MA35 - 0
WALGROVE - Walgrove MA18 - No Restriction
WAYNESNO - Waynesburg North MA35 - 50,000
----------------------------------------------------------------------------
DISPLACEMENT AVAILABILITY-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
843067 - Cornwell - 100,000
C14 - WAYNESBURG - 30,000
C22 - EAGLE-25 - 25,000
C23 - PENNSBURG-23 - 0
C4 - TETCO LEBANON-6 - 0
E2 - ROCKVILLE-30 - 0
LOUDOUN - LOUDOUN LNG - 50,000
----------------------------------------------------------------------------
TRANSFER METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
TMBOSWLL - TM Boswells Tavern MA33 - 500,000
TMBRDRUN - TM Broad Run MA19 - 500,000
TMCEREDO - TM Ceredo MA19 - 500,000
TMCHANTY - TM Chantilly MA30 - 500,000
TMEAGLE - TM Eagle MA25 - 500,000
TMLEACH - TM Leach MA19 - 500,000
TMLOSTRI - TM Lost River MA30 - 500,000
TMLOUDN - TM Loudoun MA30 - 500,000
TMLXP - TM LXP MA41 - 500,000
TMMXP - TM MXP MA42 - 500,000
----------------------------------------------------------------------------
LOGICAL METERS-- Non-Firm Available Capacity:
----------------------------------------------------------------------------
MLAPLGRV – Mainline Apple Grove - 500,000
MLCRWFRD - Mainline Crawford - 500,000
MLDRYCRE - Mainline Dry Creek - 500,000
MLEAGLE - Mainline Eagle - 500,000
MLLEACH - Mainline Leach - 500,000
MLLOUDOU - Mainline Loudoun - 500,000
MLLXPMAJ - Mainline LXP Majorsville - 500,000
MLNEWALB - Mainline New Albany - 500,000
MLPETERS - Mainline Petersburg - 500,000
MLSDRCRK - Mainline Saunders Creek - 500,000
----------------------------------------------------------------------------
DUE PIPE AND DUE SHIPPER AVAILABILITY:
----------------------------------------------------------------------------
OP AREA 01 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 02 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 03 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 04 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 05 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 06 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 07 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 08 - Due Pipe - 0, Due Shipper - No Restriction
OP AREA 10 - Due Pipe - 0, Due Shipper - No Restriction
============================================================================
============================================================================
PAL & IT BUSINESS
Representatives are available daily to discuss PAL transactions with customers who have executed Master PAL Agreements. (Reminder: Each PAL transaction including rate, term, quantity and point(s) must be provided for and approved on the Appendix A under the Master PAL Agreement). Customers who are interested in discounted PAL transactions for next-day or long-term park and/or lend transactions or daily discounted IT paths should contact Diana Roberts at 832-320-5454 (ICE droberts6) or Daniel Junek at 832-320-5825 (ICE djunek4) for more information.
AUTO PAL AVAILABILITY
Effective with EVENING Cycle for each Gas Day, Auto Parks/Loans will be limited to +/-5,000 Dth. Customers are reminded the intent of AutoPAL service is to utilize nominal quantities to resolve pool imbalances that result from upstream or downstream reductions during the cycle. This service should not be used for parking or loaning large quantities.
The following services are eligible for Auto Park/Loan Paybacks and Auto Loan/Park Withdrawals:
IPP
SPP
A01 - Kenova
A02 - Flat Top
A03 - Cobb
A04 - Alexander
A05 - Delmont
A06 - McClellandtown
A08 - Crawford
A09 - York
A10 - Dungannon
A11 - Binghamton
A12 - Mountaineer Xpress
* Denotes a change from previous posting
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038383
Notice Type: Over-Under Performance
Status: Initiate
Posted: 2026-07-07T08:54:00+00:00
Effective: 2026-07-07T09:00:00+00:00
End: 2026-07-08T09:00:00+00:00
Subject: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
Gulf South Pipeline Notice 5038383
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5038383
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
TSP :
078444247
Post Date/Time :
07/07/2026 08:54:00 AM
Notice Effective Date/Time :
07/07/2026 09:00:00 AM
Notice End Date/Time :
07/08/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/7/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 20862 Calcasieu Power Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/07/2026 8:55:12 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/07/2026 08:54:00 AM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
07/07/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/08/2026 09:00:00 AM
Notice ID :
5038383
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure to take confirmed quantities - Loc 20862 Calcasieu
Power Lake Charles
Notice Text :
Due to Customer’s failure to take confirmed quantities at the locations noted below, Gulf South
Pipeline Company, LLC (“Gulf South”) is notifying customers that it anticipates scheduling
reductions for the remaining nomination cycles for Gas Day 7/7/2026 and until further notice
based upon Projected Daily Quantities* at these locations.
-Loc 20862 Calcasieu Power Lake Charles
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day. “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day. The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
If you have any questions, please contact your customer service representative.
07/07/2026 8:55:12 AM
Page 1 of 1
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): CAPACITY CONSTRAINT Notice Type Desc (2): SEGMENTS
Notice Eff Date/Time: 07/06/2026 7:05:43AM Notice End Date/Time: 07/07/2026 9:00:00am
Post Date/Time: 7/6/2026 7:05:43 AM Notice ID: 402592
Reqrd Rsp: 1 Rsp Date: 7/6/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402464
Subject: ANT PIP RESTRICTION SEG187BH EFF 7-7 REM
Notice Text:
ANTICIPATED PRIMARY IN THE PATH RESTRICTION AT STA 110 (SEGMENT 187 BH) EFFECTIVE 7-7-2026 REMINDER
As a reminder, based on current nominations, maintenance updates and operational conditions, effective Timely Cycle for gas day of Tuesday, July 7, 2026, and continuing until further notice, Tennessee anticipates scheduling Primary In the Path (“PIP”) transports to no less than 88% of contract MDQ pathed through STA 110 (Segment 187 BH).
The stated scheduling percentage is based upon the current level of firm capacity contracted for during this restriction and is subject to change based upon operational conditions and Shipper utilization.
Please contact your Account Director or Scheduling Representative if you have any questions.
..
Natural Gas Pipeline (NGPL)
[CAPACITY CONSTRAINT] SEGS 3 & 4 REC POINTS - PRIM ONLY LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- LIFTED
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/05/2026
Notice End Date: 10/03/2026
Posting Date: 07/05/2026
Notice Identifier: 180020
Prior Notice Identifier: 179927
Required Response Indicator Description: No response required
Zone
Gas Day July 4
Gas Day July 5 and until further notice
M1-24"
OFO In Effect: No Due Pipe 2% / 500
No OFO*
M1-30"
OFO In Effect: No Due Pipe 10% / 500
No OFO*
M2-24"
OFO In Effect: No Due Pipe 2% / 500
No OFO*
M2-30"
OFO In Effect: No Due Pipe 2% / 500
No OFO*
OFO In Effect: No Due Pipe 2% / 500
No OFO*
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Natural Gas Pipeline (NGPL)
[FORCE MAJEURE] FORCE MAJEURE - COMP STA 168 - LIFTED
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- LIFTED
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/05/2026
Notice End Date: 10/03/2026
Posting Date: 07/05/2026
Notice Identifier: 180021
Prior Notice Identifier: 179764
Required Response Indicator Description: No response required
Operational Area
Gas Day July 4
Gas Day July 5 and until further notice
System Wide - All Customers
OFO In Effect: No DP 2% / 500
No OFO*
Customer Specific
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Transco
Notice: Pipeline Conditions
Posted: 07/03/2026 09:17:17 AM
Notice ID: 17025267
Notice 17025267
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/03/2026
Notice Eff Time:
09:17:17 CDT
Notice End Date:
Notice End Time:
Notice ID:
17025267
Notice Stat Desc:
Supersede
Notice Type Desc:
Oper Alert
Post Date:
07/03/2026
Post Time:
09:17:17 CDT
Prior Notice:
17002186
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Pipeline Conditions
Posting Date: 07/03/2026 09:17
Effective Date: 07/04/2026
Available Make Up Quantity (Dts)
Zone
Shipper
OBA
Incremental
TT03
TT04
TT03
TT63
TT04
TT64
Park
Loan
1
Y
Y
Y
Y
Y
Y
Y
Y
2
Y
Y
Y
Y
Y
Y
Y
Y
3
Y
Y
Y
Y
Y
Y
Y
Y
4
Y
Y
Y
Y
Y
Y
Y
Y
4A
Y
Y
Y
Y
Y
Y
Y
Y
4B
Y
Y
Y
Y
Y
Y
N/A
N/A
5
Y
Y
Y
Y
Y
Y
Y
Y
6
Y
Y
Y
Y
Y
Y
Y
Y
Leidy Line
Y
Y
Y
Y
Y
Y
N/A
N/A
TT03 - Imbalance Payback From TSP (Due To Shipper/OBA)
TT04 - Imbalance Payback To TSP (Due From Shipper/OBA)
TT63 - Prior Month Imbalance Payback From TSP (Due To OBA)
TT64 - Prior Month Imbalance Payback To TSP (Due From OBA)
Park/Loan/ISS: For more information regarding availability, any shipper interested in receiving daily park and loan specifics over ICE chat, and prior to scheduling, please call: Chris 713.215.2566 or Collin 281.253.6885.
Excess WSS Injection - Not Available
Excess GSS Injection - Not Available
Excess ESS Injection - Not Available
Excess GSS Withdrawal - Not Available
Excess WSS Withdrawal - Not Available
Excess ESS Withdrawal - Not Available
WSS/GSS/ESS: For more information, please contact your Transportation Services representative
Pool tolerance - .5%
Transco force balances the pool during the ID 3 cycle
For OFO information - Watch Critical Notices
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/02/2026 6:46:49AM Notice End Date/Time: 07/03/2026 9:00:00am
Post Date/Time: 7/2/2026 6:46:49 AM Notice ID: 402489
Reqrd Rsp: 1 Rsp Date: 7/2/2026 12:00:00 AM
Notice Stat Desc: TERMINATE Prior Notice: 402404
Subject: OFO CD1 LIFTED EFFECTIVE 7-5-2026
Notice Text:
OFO DAILY CRITICAL DAY 1 LIFTED EFFECTIVE 7-5-2026
Effective for the Gas Day (“GD”) of Sunday, July 5, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is LIFTING the OFO Daily Critical Day (“CD”) 1 for all areas pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
This current OFO is effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-4-2026
GD 7-5-2026 until further notice
Zone 0
No OFO
No OFO
Zone L
Critical Day 1
Excluding the 800 Line
Excluding Muskrat and 500 Line Segments
(Excluding Muskrat Segments 509, 515, 516, 523, 524, 526)
All 500 Line Areas Included
(Includes Segments 527, 529, 530)
· Receipts do not underdeliver
· Deliveries do not overtake
No OFO
Zone 1
Critical Day 1
Excluding All 100 Line
Excluding All 800 Line
500 Line Areas Included
(Includes Segments 534, 539 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
No OFO
Zone 2
No OFO
No OFO
Zone 3
No OFO
No OFO
Zone 4
No OFO
No OFO
Zone 5
Critical Day 1
Areas East of STA 245 on the 200 Line only
· Receipts do not underdeliver
· Deliveries do not overtake
No OFO
Zone 6
Critical Day 1
The 200 Line only
· Receipts do not underdeliver
· Deliveries do not overtake
No OFO
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Operational Flow Order -- LIFTED EFF 7/3
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/03/2026
Notice End Date: 09/30/2026
Posting Date: 07/02/2026
Notice Identifier: 179926
Prior Notice Identifier: 179772
Required Response Indicator Description: No response required
Operational Areas
Gas Day July 2
Gas Day July 3 and until further notice
System Wide
OFO in Effect : No Due Pipe 10%/500
No OFO
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO
MAD
No MAD
No MAD
Natural Gas Pipeline (NGPL)
[OPERATIONAL FLOW ORDER] T3 L1 OFO Cancelled Eff 7/3/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Gresham Station
Posted: 07/01/2026 5:49:57PM
Effective: 07/01/2026 5:49:57PM
End Date: 07/02/2026 9:00:00AM
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): OPERATIONAL FLOW ORDER Notice Type Desc (2): OFO
Notice Eff Date/Time: 07/01/2026 1:00:15PM Notice End Date/Time: 07/02/2026 9:00:00am
Post Date/Time: 7/1/2026 1:00:15 PM Notice ID: 402466
Reqrd Rsp: 1 Rsp Date: 7/1/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 402404
Subject: OFO CD1 DOWNGRADED EFFECTIVE 7-1-26
Notice Text:
OFO DAILY CRITICAL DAY 1 DOWNGRADED EFFECTIVE 7-1-2026
Effective immediately for the Gas Day (“GD”) of Wednesday, July 1, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is DOWNGRADING its OFO Daily Critical Day (“CD”) 1 by lifting the OFO for Segments 542, 548 and 860 on the 500 Line pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff.
This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.
Please refer to the table below for the affected areas and dates, and the actions required:
Zone
GD 7-1-2026 until further notice
Zone 0
No OFO
Zone L
Critical Day 1
Excluding the 800 Line
Excluding Muskrat and 500 Line Segments
(Excluding Muskrat Segments 509, 515, 516, 523, 524, 526)
All 500 Line Areas Included
(Includes Segments 527, 529, 530)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 1
Critical Day 1
Excluding All 100 Line
Excluding All 800 Line
500 Line Areas Included
(Includes Segments 534, 539 Only)
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 2
No OFO
Zone 3
No OFO
Zone 4
No OFO
Zone 5
Critical Day 1
Areas East of STA 245 on the 200 Line only
· Receipts do not underdeliver
· Deliveries do not overtake
Zone 6
Critical Day 1
The 200 Line only
· Receipts do not underdeliver
· Deliveries do not overtake
CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE: Greater of 2% of scheduled quantities or 500 Dth
Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.
In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.
Please contact your Scheduling Representative if you have any questions.
..
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Pack
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Lifted - System Wide Pack
Posted: 07/01/2026 7:34:45AM
Effective: 07/01/2026 7:34:45AM
End Date: 07/02/2026 9:00:00AM
Freeport LNG Feed
[FORCE MAJEURE] FORCE MAJEURE 538-2 TO 539-2 EFF 7-23-26
UNSCORED
Informational
View original notice text
Pipeline: Freeport LNG Feed
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE 538-2 TO 539-2 EFF 7-23-26
Posted: 07/21/2026 2:32:40PM
Effective: 07/21/2026 2:32:40PM
End Date: 07/22/2026 9:00:00AM
Corpus Christi LNG
Quorum Server Maintenance July 07, 2026, 10:15PM to July 08, 2026, 12:00AM
UNSCORED
Informational
View original notice text
Facility: Corpus Christi LNG
Notice ID: 1955
Notice Type: Computer System Status
Status: Active
Title: Quorum Server Maintenance July 07, 2026, 10:15PM to July 08, 2026, 12:00AM
Effective Date/Time: 2026-07-06T15:02:00
End Date/Time: 2026-10-06T00:00:00
Posted: 2026-07-06T15:04:32.213
Duration: 91 days
Note: Full notice body text is not accessible via this portal's API. Classification is based on subject line, notice type, status, and date range above.
Corpus Christi LNG
CTPL JUNE 2026 Invoices
UNSCORED
Informational
View original notice text
Facility: Corpus Christi LNG
Notice ID: 1957
Notice Type: Billing and Payments
Status: Active
Title: CTPL JUNE 2026 Invoices
Effective Date/Time: 2026-07-07T09:21:00
End Date/Time: 2026-10-07T00:00:00
Posted: 2026-07-07T09:22:11.7
Duration: 91 days
Note: Full notice body text is not accessible via this portal's API. Classification is based on subject line, notice type, status, and date range above.
Corpus Christi LNG
CTPL Retainage Rates Eff 8.1.2026
UNSCORED
Informational
View original notice text
Facility: Corpus Christi LNG
Notice ID: 1961
Notice Type: Rates and Charges
Status: Active
Title: CTPL Retainage Rates Eff 8.1.2026
Effective Date/Time: 2026-07-17T17:32:00
End Date/Time: 2026-11-01T00:00:00
Posted: 2026-07-17T17:34:43.433
Duration: 106 days
Note: Full notice body text is not accessible via this portal's API. Classification is based on subject line, notice type, status, and date range above.
Sabine Pass LNG
CTPL 2026 Planned Outage and Maintenance Summary – Updated 07.15.26
UNSCORED
Informational
View original notice text
Facility: Sabine Pass LNG
Notice ID: 1959
Notice Type: Planned Service Outage
Status: Revision / Supersedes Prior Notice
Title: CTPL 2026 Planned Outage and Maintenance Summary – Updated 07.15.26
Effective Date/Time: 2026-07-15T09:45:00
End Date/Time: 2026-08-31T00:00:00
Posted: 2026-07-15T09:46:59.72
Duration: 46 days
Note: Full notice body text is not accessible via this portal's API. Classification is based on subject line, notice type, status, and date range above.
This notice supersedes a prior filing. Treat as a revision; check for escalation triggers vs prior notice.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038376
Notice Type: Computer System Status
Status: Initiate
Posted: 2026-07-02T14:13:00+00:00
Effective: 2026-07-02T14:15:00+00:00
End:
Subject: Measurement Update
Texas Eastern Transmission (TETCO)
07/20/2026- North Little Rock to Bald Knob Line 1 Valve Section 3 Isolation -- COMPLETE
UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: North Little Rock to Bald Knob Line 1 Valve Section 3 Isolation -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 10/18/2026
Posting Date: 07/20/2026
Notice Identifier: 180657
Required Response Indicator Description: No response required
Notice Text:
Texas Eastern has completed the previously posted North Little Rock to Bald Knob Line 1 Valve Section 3 isolation (July 17 - July 23) ahead of schedule and the line has been returned to normal operations.
Effective immediately, all restrictions associated with this outage have been lifted.
Please contact your Operations Account Representative if you have any questions.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119418
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 20 2026 8:00AM
Effective: Jul 20 2026 7:58AM
End Date: Jul 21 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119418
Critical Notice Description: Critical notice
Posting Date/Time: Jul 20 2026 8:00AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 20 2026 7:58AM
Notice End Date/Time: Jul 21 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 20, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 20, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66451
Notice Type: Operational Alert
Subject: Overage Alert Day 25% Tolerance
Posted: Jul 20 2026 6:33 AM
Effective: Jul 20 2026 9:00 AM
End Date: Jul 21 2026 9:00 AM
Notice ID: 66451
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 20 2026 6:33 AM
Subject: Overage Alert Day 25% Tolerance
Notice Effective Date/Time: Jul 20 2026 9:00 AM
Notice End Date/Time: Jul 21 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 20, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 25% (Twenty Five Percent) tolerance.For the gas day of July 20, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Columbia Gas Transmission (TCO)
COMPLETED: Line TM-5 Maintenance, Effective ID2 Cycle, July 18,2026
UNSCORED
Informational
View original notice text
TSP Name Columbia Gas Transmission, LLC
TSP 054748041
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26041020
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/18/26
06/09/26
07/09/26
Subject: Subject: COMPLETED: Line TM-5 Maintenance, Effective ID2 Cycle, July 18,2026
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gas Transmission, LLC (TCO) notifies customers that the pipeline maintenance on TM-5 is complete. As a result, the following locations have been reinstated to No Restriction effective ID2 Cycle for Gas Day Saturday, July 18, 2026.
Cobb Line H MA18 (A03LINEH)
Please contact your Customer Services Representative with any questions.
***Previous Posting***
Columbia Gas Transmission, LLC (TCO) notifies customers of upcoming Pipeline Maintenance on line TM-5 scheduled to begin on Tuesday, June 16, 2026, and continue through Friday, July 17, 2026. As a result, following the conclusion of the Cobb Compressor Station Maintenance (Notice ID: 26028026), Cobb Line H MA18 (A03LINEH) will remain at zero total capacity until the work is complete.
Reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 38 of TCO’s FERC Gas Tariff (“Tariff”). However, TCO will only issue RCCs if TCO is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day average usage quantity less any scheduled quantities on the contract. By means of this notice, TCO is establishing which specific Gas Days will be included when determining a shipper’s 7-day average usage quantity pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
NEXUS Gas Transmission (U.S.)
07/17/2026- NEXUS Pipeline Conditions for 7/18/2026
UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 7/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/18/2026
Notice End Date: 07/19/2026
Posting Date: 07/17/2026
Notice Identifier: 180587
Required Response Indicator Description: No response required
For Gas Day July 18, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/17/2026- AGT Pipeline Conditions for 07/18/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/18/2026
Notice End Date: 07/19/2026
Posting Date: 07/17/2026
Notice Identifier: 180569
Required Response Indicator Description: No response required
For Gas Day July 18, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
80%
Planned Outage
Cromwell
100%
100%
62%
Planned Outage
Burrillville
100%
100%
84%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
61%
Iroquois Receipts
100%
100%
40%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
46%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
20%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/15/2026- AGT Pipeline Conditions for 7/16/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 07/17/2026
Posting Date: 07/15/2026
Notice Identifier: 180481
Required Response Indicator Description: No response required
For Gas Day July 16, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
89%
Planned Outage
Cromwell
100%
100%
70%
Planned Outage
Burrillville
100%
100%
96%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
58%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
58%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
33%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 7/14/2026. 500 Dth / 5% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Transco
Location(s) Off Rate Notice - Underperformance
UNSCORED
Informational
View original notice text
Pipeline: Transco
Notice: Location(s) Off Rate Notice - Underperformance
Posted: 07/17/2026 02:20:29 PM
Notice ID: 17068613
Notice 17068613
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/17/2026
Notice Eff Time:
14:20:29 CDT
Notice End Date:
Notice End Time:
Notice ID:
17068613
Notice Stat Desc:
Initiate
Notice Type Desc:
Ovr-Undr Perf
Post Date:
07/17/2026
Post Time:
14:20:29 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Location(s) Off Rate Notice - Underperformance
Transco is providing notice that the following location(s) are off rate and underperforming. If performance has not improved during the current or subsequent cycle, Transco may limit scheduled volumes to actual flows.
Transco may also be required to take further action including issuing a Location Specific Operational Flow Order (OFO). Additional notice prior to the effective time of any further required action, including the issuance of a Location Specific OFO, may be limited.
Location Name
Location ID
Receipt/Delivery
Zone
Heidelberg
1006120
Receipt
4
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66334
Notice Type: Operational Alert
Subject: Overage Alert Day 25% Tolerance
Posted: Jul 17 2026 6:33 AM
Effective: Jul 17 2026 9:00 AM
End Date: Jul 18 2026 9:00 AM
Notice ID: 66334
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 17 2026 6:33 AM
Subject: Overage Alert Day 25% Tolerance
Notice Effective Date/Time: Jul 17 2026 9:00 AM
Notice End Date/Time: Jul 18 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 17, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 25% (Twenty Five Percent) tolerance.For the gas day of July 17, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Transco
Location(s) Off Rate Notice - Underperformance
UNSCORED
Informational
View original notice text
Pipeline: Transco
Notice: Location(s) Off Rate Notice - Underperformance
Posted: 07/16/2026 09:31:28 AM
Notice ID: 17064659
Notice 17064659
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/16/2026
Notice Eff Time:
09:31:28 CDT
Notice End Date:
Notice End Time:
Notice ID:
17064659
Notice Stat Desc:
Initiate
Notice Type Desc:
Ovr-Undr Perf
Post Date:
07/16/2026
Post Time:
09:31:28 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Location(s) Off Rate Notice - Underperformance
Transco is providing notice that the following location(s) are off rate and underperforming. If performance has not improved during the current or subsequent cycle, Transco may limit scheduled volumes to actual flows.
Transco may also be required to take further action including issuing a Location Specific Operational Flow Order (OFO). Additional notice prior to the effective time of any further required action, including the issuance of a Location Specific OFO, may be limited.
Location Name
Location ID
Receipt/Delivery
Zone
Wharton Dow
1009506
Delivery
1
Transco
2026 Major Construction and Maintenance Projects
SEV 1/5
Informational
Transco has posted an updated 2026 major construction and maintenance schedule as an informational notice, superseding prior notice 17043258. The schedule covers planned projects throughout 2026 and includes a new tab for Pipeline Inspection (ILI) activities. No specific capacity restrictions or affected segments are identified in this notice; individual maintenance events will be posted separately prior to commencement.
This is a high-level schedule update with no specific capacity restriction announced -- no actionable basis or Henry Hub signal until individual maintenance windows are posted with segment and volume detail.
Reroute: Not applicable -- no operational constraint is identified in this notice; reroute assessment will depend on specific maintenance windows posted in subsequent notices.
View original notice text
Pipeline: Transco
Notice: 2026 Major Construction and Maintenance Projects
Posted: 07/16/2026 08:17:55 AM
Notice ID: 17064602
Notice 17064602
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/16/2026
Notice Eff Time:
08:17:55 CDT
Notice End Date:
Notice End Time:
Notice ID:
17064602
Notice Stat Desc:
Supersede
Notice Type Desc:
Maint
Post Date:
07/16/2026
Post Time:
08:17:55 CDT
Prior Notice:
17043258
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
2026 Major Construction and Maintenance Projects
Please be advised that Transco’s major construction and maintenance schedule for projects that are currently planned for 2026 has been updated and can be accessed using the link below. Note the addition of a tab specifically dedicated to Pipeline Inspection (ILI) Activities. The link to the maintenance schedule will also be available on the informational postings portion of the
1Line portal
under the operational information tab.
While significant effort has been made to provide dates for the 2026 schedule, the dates and duration of the planned work are subject to change. Transco will provide revisions to the maintenance schedule as updated information is available.
Some of this work will affect the availability of interruptible transportation services (IT and secondary FT). The extent of this impact will depend on operating conditions at the time of the outage. If a maintenance activity is expected to affect the availability of transportation services, additional information will be posted prior to commencement of that activity.
Click
here
to access the 2026 Maintenance Schedule link.
Transco
Pipeline Conditions
UNSCORED
Informational
View original notice text
Pipeline: Transco
Notice: Pipeline Conditions
Posted: 07/13/2026 02:31:53 PM
Notice ID: 17055966
Notice 17055966
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/13/2026
Notice Eff Time:
14:31:53 CDT
Notice End Date:
Notice End Time:
Notice ID:
17055966
Notice Stat Desc:
Supersede
Notice Type Desc:
Oper Alert
Post Date:
07/13/2026
Post Time:
14:31:53 CDT
Prior Notice:
17025267
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Pipeline Conditions
Posting Date: 07/13/2026 14:31
Effective Date: 07/14/2026
Available Make Up Quantity (Dts)
Zone
Shipper
OBA
Incremental
TT03
TT04
TT03
TT63
TT04
TT64
Park
Loan
1
Y
Y
Y
Y
Y
Y
Y
Y
2
Y
Y
Y
Y
Y
Y
Y
Y
3
Y
Y
Y
Y
Y
Y
Y
Y
4
Y
Y
Y
Y
Y
Y
Y
Y
4A
Y
Y
Y
Y
Y
Y
Y
Y
4B
Y
Y
Y
Y
Y
Y
N/A
N/A
5
Y
Y
Y
Y
Y
Y
Y
Y
6
N
Y
N
N
Y
Y
Y
Y
Leidy Line
N
Y
N
N
Y
Y
N/A
N/A
TT03 - Imbalance Payback From TSP (Due To Shipper/OBA)
TT04 - Imbalance Payback To TSP (Due From Shipper/OBA)
TT63 - Prior Month Imbalance Payback From TSP (Due To OBA)
TT64 - Prior Month Imbalance Payback To TSP (Due From OBA)
Park/Loan/ISS: For more information regarding availability, any shipper interested in receiving daily park and loan specifics over ICE chat, and prior to scheduling, please call: Chris 713.215.2566 or Collin 281.253.6885.
Excess WSS Injection - Not Available
Excess GSS Injection - Not Available
Excess ESS Injection - Not Available
Excess GSS Withdrawal - Not Available
Excess WSS Withdrawal - Not Available
Excess ESS Withdrawal - Not Available
WSS/GSS/ESS: For more information, please contact your Transportation Services representative
Pool tolerance - .5%
Transco force balances the pool during the ID 3 cycle
For OFO information - Watch Critical Notices
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66289
Notice Type: Operational Alert
Subject: Overage Alert Day 25% Tolerance
Posted: Jul 16 2026 6:54 AM
Effective: Jul 16 2026 9:00 AM
End Date: Jul 17 2026 9:00 AM
Notice ID: 66289
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 16 2026 6:54 AM
Subject: Overage Alert Day 25% Tolerance
Notice Effective Date/Time: Jul 16 2026 9:00 AM
Notice End Date/Time: Jul 17 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 16, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 25% (Twenty Five Percent) tolerance.For the gas day of July 16, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/16/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038430
Notice Type: Scheduling Alert
Status: Initiate
Posted: 2026-07-15T16:58:00+00:00
Effective: 2026-07-16T15:02:00+00:00
End: 2026-07-17T09:00:00+00:00
Subject: TMY Scheduled Quantities Posting Delayed for Gas Day 7/16/2026
Gulf South Pipeline Notice 5038430
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Scheduling Alert
Notice Stat Desc :
Initiate
Notice ID :
5038430
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/16/2026
TSP :
078444247
Post Date/Time :
07/15/2026 04:58:00 PM
Notice Effective Date/Time :
07/16/2026 03:02:00 PM
Notice End Date/Time :
07/17/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
The TMY scheduled quantities posting for gas day 7/16/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/15/2026 4:58:54 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/15/2026 04:58:00 PM
Notice Type Desc :
Scheduling Alert
Notice Effective Date/Time :
07/16/2026 03:02:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/17/2026 09:00:00 AM
Notice ID :
5038430
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/16/2026
Notice Text :
The TMY scheduled quantities posting for gas day 7/16/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
07/15/2026 4:58:54 PM
Page 1 of 1
Transco
Station 515 (Job 458965) Outage 2026 Planned Outage and Maintenance Summary
UNSCORED
Informational
View original notice text
Pipeline: Transco
Notice: Station 515 (Job 458965) Outage 2026 Planned Outage and Maintenance Summary
Posted: 07/15/2026 12:46:46 PM
Notice ID: 17061983
Notice 17061983
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/15/2026
Notice Eff Time:
12:46:46 CDT
Notice End Date:
Notice End Time:
Notice ID:
17061983
Notice Stat Desc:
Initiate
Notice Type Desc:
Maint
Post Date:
07/15/2026
Post Time:
12:46:46 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Station 515 (Job 458965) Outage 2026 Planned Outage and Maintenance Summary
Transco will be performing planned maintenance associated with Job #459285 on its 2026 Planned Outage and Maintenance Summary. This maintenance activity requires a full compressor station outage for an equipment upgrade that will impact the availability of all transportation services moving west to east through Compressor Station 515. The current schedule is
Tuesday, 08/04/2026 through Thursday, 08/06/2026.
The Throughput Section Boundary (TSB) at Leidy Line MP 81.71 (Leidy Line Sta 515 E) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name - Location
Location ID
Flow Direction
LEIDY LINE STATION 515 E
1000194
W to E
Design Capacity (MDt/d)
Total Quantity Available (Mdt/d)
% Available Total Primary-Firm vs Design Capacity
% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*
3,242
1,900
60%
15-20%
*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
East Tennessee Natural Gas
07/11/2026- ETNG Pipeline Conditions for 7/12/2026
UNSCORED
Informational
View original notice text
07/11/2026- ETNG Pipeline Conditions for 7/12/2026
Pipeline: South Pass Pipeline
Notice ID: 66226
Notice Type: Maintenance
Subject: Stingray Pigging Operations Update #4
Posted: 2026-07-14 14:15:00.0
Effective: 2026-07-14 14:15:00.0
End Date:
Notice ID: 66226
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-07-14 14:15:00.0
Subject: Stingray Pigging Operations Update #4
Notice Effective Date/Time: 2026-07-14 14:15:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 07/14/2026 Stingray Pigging Operations - Update #5 Please Note: changes from the previous posting are shown in bold type. Stingray pigging operations will end on August 14, 2026. Beginning Saturday, March 21, 2026, Stingray Pipeline Company, L.L.C. will initiate pigging operations from West Cameron 509. Due to anticipated higher liquid levels at the Stingray Onshore Separation facility, offshore operators could experience higher daily line pressures and pressure fluctuations while pigging operations are in progress. Stingray will update this posting as more information becomes available. If you have any questions, please contact your Marketing Representative or your Nominations Analyst.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119315
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 14 2026 7:50AM
Effective: Jul 14 2026 7:49AM
End Date: Jul 15 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119315
Critical Notice Description: Critical notice
Posting Date/Time: Jul 14 2026 7:50AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 14 2026 7:49AM
Notice End Date/Time: Jul 15 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 14, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 14, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/12/2026
Notice End Date: 07/13/2026
Posting Date: 07/11/2026
Notice Identifier: 180334
Required Response Indicator Description: No response required
For Gas Day July 12, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
78%
Planned Outage
Cromwell
100%
100%
58%
Planned Outage
Burrillville
100%
100%
83%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
58%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
33%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): TSP CAPACITY OFFERING Notice Type Desc (2): TSP CAP OFFERING
Notice Eff Date/Time: 07/13/2026 9:00:15AM Notice End Date/Time: 08/14/2026 9:00:00am
Post Date/Time: 7/13/2026 9:00:15 AM Notice ID: 402754
Reqrd Rsp: 1 Rsp Date: 7/13/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 395529
Subject: RES OF CAP FOR FUTURE EXP. - UPDATE
Notice Text:
DATE: July 13, 2026 TIME: 9:00 AM CST
TO: ALL TENNESSEE GAS PIPELINE COMPANY, L.L.C. CUSTOMERS
RE: RESERVATION OF CAPACITY FOR FUTURE EXPANSION IN ZONE L, 1, 2, 3, and 4 – UPDATE 1 (ADDING ZONE 3 DELIVERIES)
On August 13, 2025, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) posted “Reservation of Capacity for Future Expansion in Zone L, 1, 2, 4” (“Reservation”) on its interactive website, pursuant to Article XXVI, Section 5.8 of the General Terms and Conditions (“GT&C”) of its FERC NGA Gas Tariff, as it may be revised from time to time (“Tariff”), to give notice that certain capacity as described in the Reservation is reserved for use in a future expansion of Tennessee's system. The “Project” for which the capacity was reserved in the Reservation was designed to provide incremental supply from existing and new receipt points in Zone 4 to existing and new delivery points in Zone 1 and Zone L. As further described herein, Tennessee has expanded the scope of the Project to include deliveries to existing and new delivery points in Zone 3.
Pursuant to Article XXVI, Section 5.8 of the GT&C of its Tariff, Tennessee gives notice that it is updating its Reservation as described herein:
Tennessee is maintaining and continuing for the Project the following capacity reservations previously set forth in the Reservation:
Capacity on Mainline Valve Segments:
· 227,000 Dth/d from MLV 214 to MLV 200
· 288,881 Dth/d from MLV 200 to MLV 110
· 290,089 Dth/d from MLV 110 to MLV 87
· 8,703 Dth/d from MLV 217A Pitt Term to MLV 217
· 28,464 Dth/d from MLV 87 to MLV 843
· 106,201 Dth/d from MLV 87 to MLV 538
· 126,201 Dth/d from MLV 538 to MLV 534
Receipt Meter Capacity:
· 279,250 Dth/d – 412888 NFG/TGP MERCER RECEIP MERCER
· 205,000 Dth/d – 55635 EGTS/TGP PETERSBURG II RECEIPT MAHO
· 488,600 Dth/d – 412868 UTICA EO/TGP KENSINGTON DEHY: RIP 2
· 420,045 Dth/d – 54641 E OH GAS/TGP BULLSEYE TUSCARAWAS
· 497,000 Dth/d – 48850 E OH GAS/TGP HOLMES TUSCARAWAS
· 150,000 Dth/d – 50708 EGTS/TGP PORT WASHINGTON TUSCARAWAS
Delivery Meter Capacity:
· 125,644 Dth/d – 420291 TRNSCO/TGP HEIDELBERG MISSISIPPI JA
· 126,201 Dth/d – 420999 POOLING PT – 500 LEG – ZONE L
In addition, Tennessee is adding the following capacity reservation for the Project:
Capacity on Mainline Valve Segments:
· 532,000 Dth/d from MLV 87 to MLV 122
Estimated In-Service Date of the Project:
· December 1, 2029
Pursuant to Article XXVI, Section 5.8 of the GT&C of Tennessee's Tariff, Tennessee may sell such reserved capacity on a limited-term basis up to the in-service date of the Project, and Tennessee reserves the right to limit any extension rights provided commensurate with the proposed in-service date of the Project.
For further information, please contact:
Andoni Vossos
(713) 420-2054
Lindsey Fritz
713-420-2626
..
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119300
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 13 2026 8:51AM
Effective: Jul 13 2026 8:50AM
End Date: Jul 14 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119300
Critical Notice Description: Critical notice
Posting Date/Time: Jul 13 2026 8:51AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 13 2026 8:50AM
Notice End Date/Time: Jul 14 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 13, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 13, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Texas Eastern Transmission (TETCO)
07/12/2026- Uniontown Compressor Station Unplanned Outage -- COMPLETE
UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Uniontown Compressor Station Unplanned Outage -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/12/2026
Notice End Date: 10/10/2026
Posting Date: 07/12/2026
Notice Identifier: 180351
Prior Notice Identifier: 180320
Required Response Indicator Description: No response required
Notice Text:
Texas Eastern has completed the repairs at the Uniontown compressor station and the station has returned to normal operations.
Please contact your Operations Account Representative if you have any questions.
Columbia Gulf Transmission (CGT)
COMPLETED: Alexandria CS Maintenance (AlexSEG) Effective Eve Cycle Gas Day July 11, 2026
UNSCORED
Informational
View original notice text
TSP Name Columbia Gulf Transmission, LLC
TSP 007854581
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26092015
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/10/26
07/10/26
08/10/26
Subject: Subject: COMPLETED: Alexandria CS Maintenance (AlexSEG) Effective Eve Cycle Gas Day July 11, 2026
Author: Author: Dillon Schoolcraft
Notice Text
Columbia Gulf Transmission, LLC (CGT) notifies customers that maintenance on Alexandria Compressor Station is now complete. As a result, the Backhaul Capacity through AlexSEG will be reinstated to Total Capacity effective Evening Cycle for Gas Day July 11, 2026.
Please contact your Customer Services Representative with any questions.
***Previous Posting***
Columbia Gulf Transmission LLC (CGT) notifies customers of upcoming maintenance at Alexandria Compressor Station and Chicot Compressor Station scheduled for Wednesday, July 8, 2026, through Friday, July 10, 2026. As a result, the backhaul capacity through AlexSEG will be reduced to a level between 2,325,000 – 2,450,000 Dth effective Timely Cycle for Gas Day Wednesday, July 8, 2026.
CGT anticipates this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services. Please see the details provided below for more information.
AlexSEG
· Estimated Capacity Setting: 2,325,000 – 2,450,000 Dth
· Design Capacity: 2,683,256
· Posted Percentage: 87-91%
Due to the potential impact to firm service, CGT encourages customers to monitor the scheduled volumes on the Operationally Available Capacity screen on Informational Postings, as nominations can fluctuate based on market conditions.
Reservation Charge Credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 40 of CGT’s FERC Gas Tariff (Tariff). By means of this notice, CGT is establishing the 7-day Average Usage Quantity to be the period of June 13-19, 2026, pursuant to the provisions in the Tariff.
Please contact your Customer Services Representative with any questions.
Texas Eastern Transmission (TETCO)
07/10/2026- Uniontown Compressor Station Unplanned Outage
UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Uniontown Compressor Station Unplanned Outage
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 10/08/2026
Posting Date: 07/10/2026
Notice Identifier: 180317
Required Response Indicator Description: No response required
Notice Text:
Texas Eastern (TE) has experienced an unplanned outage at its Uniontown, Pennsylvania compressor station (Uniontown). In order to make the necessary repairs, TE will be required to take the first two valve sections of Line 1 downstream of Uniontown out of service. This outage will result in lower than historical pressures for point operators east of Uniontown compressor station and west of Lambertville compressor station.
At this time, TE does not anticipate any restrictions to nominations. TE will post an update once capacities through Bedford compressor station are known.
Please contact your Operations Account Representative if you have any questions.
Texas Eastern Transmission (TETCO)
07/10/2026- Uniontown Compressor Station Unplanned Outage -- UPDATE
UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Uniontown Compressor Station Unplanned Outage -- UPDATE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/10/2026
Notice End Date: 10/08/2026
Posting Date: 07/10/2026
Notice Identifier: 180320
Prior Notice Identifier: 180317
Required Response Indicator Description: No response required
Notice Text:
As previously posted, Texas Eastern (TE) has experienced an unplanned outage at its Uniontown, Pennsylvania compressor station (Uniontown). In order to make the necessary repairs, TE will be required to take the first two valve sections of Line 1 downstream of Uniontown out of service. This outage will result in lower than historical pressures for point operators' east of Uniontown compressor station and west of Lambertville compressor station.
During the duration of this outage the capacity through the Bedford compressor station will be approximately 1,847,000 Dth/d
At this time, TE does not anticipate any restrictions to nominations.
Please contact your Operations Account Representative if you have any questions.
NEXUS Gas Transmission (U.S.)
07/10/2026- NEXUS Pipeline Conditions for 07/11/2026
UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180272
Required Response Indicator Description: No response required
For Gas Day July 11, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/10/2026- AGT Pipeline Conditions for 07/11/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 07/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180304
Required Response Indicator Description: No response required
For Gas Day July 11, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
78%
Planned Outage
Cromwell
100%
100%
58%
Planned Outage
Burrillville
100%
100%
82%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
58%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
Lincoln Receipts
100%
100%
85%
G System
100%
100%
30%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/11/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038413
Notice Type: Scheduling Alert
Status: Initiate
Posted: 2026-07-10T16:31:00+00:00
Effective: 2026-07-10T16:34:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: TMY Scheduled Quantities Posting Delayed for Gas Day 7/11/2026
Gulf South Pipeline Notice 5038413
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Scheduling Alert
Notice Stat Desc :
Initiate
Notice ID :
5038413
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/11/2026
TSP :
078444247
Post Date/Time :
07/10/2026 04:31:00 PM
Notice Effective Date/Time :
07/10/2026 04:34:00 PM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
The TMY scheduled quantities posting for gas day 7/11/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/10/2026 4:31:22 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/10/2026 04:31:00 PM
Notice Type Desc :
Scheduling Alert
Notice Effective Date/Time :
07/10/2026 04:34:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038413
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/11/2026
Notice Text :
The TMY scheduled quantities posting for gas day 7/11/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
07/10/2026 4:31:22 PM
Page 1 of 1
Gulf South Pipeline
EVE Cycle for 7/11/2026 Nomination Deadline Extended
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038414
Notice Type: Customer Services Update/Nomination Deadlines
Status: Initiate
Posted: 2026-07-10T17:19:00+00:00
Effective: 2026-07-10T17:21:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: EVE Cycle for 7/11/2026 Nomination Deadline Extended
Gulf South Pipeline Notice 5038414
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Customer Services Update/Nomination Deadlines
Notice Stat Desc :
Initiate
Notice ID :
5038414
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle for 7/11/2026 Nomination Deadline Extended
TSP :
078444247
Post Date/Time :
07/10/2026 05:19:00 PM
Notice Effective Date/Time :
07/10/2026 05:21:00 PM
Notice End Date/Time :
07/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South has extended the EVE nomination deadline to 6:30 PM for gas day 7/11/2026 due to a TMY
cycle scheduling delay.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/10/2026 5:19:48 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/10/2026 05:19:00 PM
Notice Type Desc :
Customer Services Update/Nomination Deadlines
Notice Effective Date/Time :
07/10/2026 05:21:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/11/2026 09:00:00 AM
Notice ID :
5038414
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle for 7/11/2026 Nomination Deadline Extended
Notice Text :
Gulf South has extended the EVE nomination deadline to 6:30 PM for gas day 7/11/2026 due to a TMY
cycle scheduling delay.
If you have any questions, please contact your customer service representative.
07/10/2026 5:19:48 PM
Page 1 of 1
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 20% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66057
Notice Type: Operational Alert
Subject: Overage Alert Day 20% Tolerance
Posted: Jul 10 2026 6:30 AM
Effective: Jul 10 2026 9:00 AM
End Date: Jul 11 2026 9:00 AM
Notice ID: 66057
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 10 2026 6:30 AM
Subject: Overage Alert Day 20% Tolerance
Notice Effective Date/Time: Jul 10 2026 9:00 AM
Notice End Date/Time: Jul 11 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 10, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 20% (Twenty Percent) tolerance.For the gas day of July 10, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
NEXUS Gas Transmission (U.S.)
07/06/2026- NEXUS Pipeline Conditions for 07/07/2026
UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/07/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 07/08/2026
Posting Date: 07/06/2026
Notice Identifier: 180060
Required Response Indicator Description: No response required
For Gas Day July 7, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/07/2026- NEXUS Pipeline Conditions for 07/08/2026
UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/08/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/08/2026
Notice End Date: 07/09/2026
Posting Date: 07/07/2026
Notice Identifier: 180105
Required Response Indicator Description: No response required
For Gas Day July 8, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)
07/08/2026- NEXUS Pipeline Conditions for 07/09/2026
UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 07/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/10/2026
Posting Date: 07/08/2026
Notice Identifier: 180194
Required Response Indicator Description: No response required
For Gas Day July 9, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Transco
2026 Major Construction and Maintenance Projects
SEV 1/5
Informational
Transco has posted an updated 2026 major construction and maintenance schedule, superseding prior notice 17022850. The notice is informational only, advising that planned work may affect interruptible and secondary firm transportation services, with no specific capacity volumes, dates, or affected segments identified in this notice. Additional notices will be posted prior to individual maintenance activities if firm service impacts are expected.
Informational scheduling update only -- no specific capacity restrictions or basis implications identified; monitor Transco 1Line for individual maintenance activity notices as they are posted closer to execution.
Reroute: Not applicable -- no specific constraint identified in this notice. When individual Transco maintenance events are posted, reroute potential will vary by segment; SNG/EGT provides partial Southeast alternative, TGP serves overlapping Northeast markets, but Transco is the dominant pipe in its corridors with limited full reroute capacity.
View original notice text
Pipeline: Transco
Notice: 2026 Major Construction and Maintenance Projects
Posted: 07/09/2026 08:00:31 AM
Notice ID: 17043258
Notice 17043258
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/09/2026
Notice Eff Time:
08:00:31 CDT
Notice End Date:
Notice End Time:
Notice ID:
17043258
Notice Stat Desc:
Supersede
Notice Type Desc:
Maint
Post Date:
07/09/2026
Post Time:
08:00:31 CDT
Prior Notice:
17022850
Reqrd Rsp Desc:
No response required
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
2026 Major Construction and Maintenance Projects
Please be advised that Transco’s major construction and maintenance schedule for projects that are currently planned for 2026 has been updated and can be accessed using the link below. Note the addition of a tab specifically dedicated to Pipeline Inspection (ILI) Activities. The link to the maintenance schedule will also be available on the informational postings portion of the
1Line portal
under the operational information tab.
While significant effort has been made to provide dates for the 2026 schedule, the dates and duration of the planned work are subject to change. Transco will provide revisions to the maintenance schedule as updated information is available.
Some of this work will affect the availability of interruptible transportation services (IT and secondary FT). The extent of this impact will depend on operating conditions at the time of the outage. If a maintenance activity is expected to affect the availability of transportation services, additional information will be posted prior to commencement of that activity.
Click
here
to access the 2026 Maintenance Schedule link.
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 20% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 66011
Notice Type: Operational Alert
Subject: Overage Alert Day 20% Tolerance
Posted: Jul 9 2026 6:47 AM
Effective: Jul 9 2026 9:00 AM
End Date: Jul 10 2026 9:00 AM
Notice ID: 66011
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 9 2026 6:47 AM
Subject: Overage Alert Day 20% Tolerance
Notice Effective Date/Time: Jul 9 2026 9:00 AM
Notice End Date/Time: Jul 10 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 9, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 20% (Twenty Percent) tolerance.For the gas day of July 09, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Trunkline Gas Company
[Trunkline Gas Company] [Maintenance] TGC Edna 100 Line Hydrotest
UNSCORED
Informational
View original notice text
Pipeline: Trunkline Gas Company
Notice ID: 65983
Notice Type: Maintenance
Subject: TGC Edna 100 Line Hydrotest
Posted: 2026-07-08 14:05:00.0
Effective: 2026-07-08 14:05:00.0
End Date:
Notice ID: 65983
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-07-08 14:05:00.0
Subject: TGC Edna 100 Line Hydrotest
Notice Effective Date/Time: 2026-07-08 14:05:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR MLV 113-2-114-2 EFF 7-8
UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/08/2026 7:59:08AM Notice End Date/Time: 07/09/2026 9:00:00am
Post Date/Time: 7/8/2026 7:59:08 AM Notice ID: 402639
Reqrd Rsp: 1 Rsp Date: 7/8/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: EMERGENT REPAIR MLV 113-2-114-2 EFF 7-8
Notice Text:
EMERGENT REPAIR BETWEEN MLV 113-2 AND MLV 114-2 (BROAD RUN LATERAL) EFFECTIVE 7-8-2026
Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair between MLV 113-2 and MLV 114-2 near Catlettsburg, KY. The line has been isolated. Tennessee has personnel on site to investigate repairs.
Tennessee is estimating the current impact to be up to 150,000 Dths. Based upon current nominations and due to ongoing scheduled maintenance in the area, no additional impact to nominations is anticipated at this time.
Updates will be posted as more information becomes available.
Please contact your Scheduler if you have any questions.
..
Florida Gas Transmission
[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance
UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 65959
Notice Type: Operational Alert
Subject: Overage Alert Day 25% Tolerance
Posted: Jul 8 2026 6:46 AM
Effective: Jul 8 2026 9:00 AM
End Date: Jul 9 2026 9:00 AM
Notice ID: 65959
Notice Type: Operational Alert
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Jul 8 2026 6:46 AM
Subject: Overage Alert Day 25% Tolerance
Notice Effective Date/Time: Jul 8 2026 9:00 AM
Notice End Date/Time: Jul 9 2026 9:00 AM
Notice Text: Mid 90-degree temperatures are forecasted in Florida over the next several days; therefore, for the gas day of July 08, 2026, FGT would like to notify their customers in the FGT Market Area that it is issuing an Overage Alert Day at 25% (Twenty Five Percent) tolerance.For the gas day of July 08, 2026, FGT will not interrupt previously scheduled Market Area ITS-1 service below the elapsed prorated scheduled quantity.FGT will continue to monitor hourly and daily takes. Please closely monitor your scheduled point quantities versus actual burn point quantities.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/07/2026 6:44:12AM Notice End Date/Time: 07/08/2026 9:00:00am
Post Date/Time: 7/7/2026 6:44:12 AM Notice ID: 402615
Reqrd Rsp: 1 Rsp Date: 7/7/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: TGP SUMMER MAINTENANCE MTG 7-21-2026
Notice Text:
TGP's 2026 SUMMER MAINTENANCE TEAMS MEETING 7-21-2026
Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its next 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of July and all of August and September 2026 on Tuesday, July, 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only. Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems. There will be a question and answer segment immediately following.
Please see TEAMS info below:
TGP Summer Maintenance and Outages TEAMS Meeting
Join on your computer, mobile app or room device
________________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK
Meeting ID: 235 794 931 318 69
Passcode: Vg6AB2AN
Need help | System reference
Dial in by phone
+1 346-410-0970,,694003306# United States, Houston
Find a local number
Phone conference ID: 694 003 306#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
..
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/8/2026
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038389
Notice Type: Scheduling Alert
Status: Initiate
Posted: 2026-07-07T17:01:00+00:00
Effective: 2026-07-07T17:02:00+00:00
End: 2026-07-08T09:00:00+00:00
Subject: TMY Scheduled Quantities Posting Delayed for Gas Day 7/8/2026
Gulf South Pipeline Notice 5038389
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Scheduling Alert
Notice Stat Desc :
Initiate
Notice ID :
5038389
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/8/2026
TSP :
078444247
Post Date/Time :
07/07/2026 05:01:00 PM
Notice Effective Date/Time :
07/07/2026 05:02:00 PM
Notice End Date/Time :
07/08/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
The TMY scheduled quantities posting for gas day 7/8/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/07/2026 5:01:17 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/07/2026 05:01:00 PM
Notice Type Desc :
Scheduling Alert
Notice Effective Date/Time :
07/07/2026 05:02:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/08/2026 09:00:00 AM
Notice ID :
5038389
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
TMY Scheduled Quantities Posting Delayed for Gas Day
7/8/2026
Notice Text :
The TMY scheduled quantities posting for gas day 7/8/2026 will be delayed. Notice will be
updated with availability.
If you have any questions, please contact your customer service representative.
07/07/2026 5:01:17 PM
Page 1 of 1
Gulf South Pipeline
EVE Cycle for 7/8/2026 Nomination Deadline Extended
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038390
Notice Type: Customer Services Update/Nomination Deadlines
Status: Initiate
Posted: 2026-07-07T17:53:00+00:00
Effective: 2026-07-07T17:54:00+00:00
End: 2026-07-08T09:00:00+00:00
Subject: EVE Cycle for 7/8/2026 Nomination Deadline Extended
Gulf South Pipeline Notice 5038390
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Customer Services Update/Nomination Deadlines
Notice Stat Desc :
Initiate
Notice ID :
5038390
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle for 7/8/2026 Nomination Deadline Extended
TSP :
078444247
Post Date/Time :
07/07/2026 05:53:00 PM
Notice Effective Date/Time :
07/07/2026 05:54:00 PM
Notice End Date/Time :
07/08/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South has extended the EVE nomination deadline to 6:30 PM for gas day 7/8/2026 due to a TMY
cycle scheduling delay.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
07/07/2026 5:53:21 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
07/07/2026 05:53:00 PM
Notice Type Desc :
Customer Services Update/Nomination Deadlines
Notice Effective Date/Time :
07/07/2026 05:54:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
07/08/2026 09:00:00 AM
Notice ID :
5038390
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
EVE Cycle for 7/8/2026 Nomination Deadline Extended
Notice Text :
Gulf South has extended the EVE nomination deadline to 6:30 PM for gas day 7/8/2026 due to a TMY
cycle scheduling delay.
If you have any questions, please contact your customer service representative.
07/07/2026 5:53:21 PM
Page 1 of 1
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119163
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 7 2026 7:14AM
Effective: Jul 7 2026 7:07AM
End Date: Jul 8 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119163
Critical Notice Description: Critical notice
Posting Date/Time: Jul 7 2026 7:14AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 7 2026 7:07AM
Notice End Date/Time: Jul 8 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 7, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 7, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1434
UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): TSP CAPACITY OFFERING Notice Type Desc (2): TSP CAP OFFERING
Notice Eff Date/Time: 07/06/2026 9:00:26AM Notice End Date/Time: 07/16/2026 9:00:00am
Post Date/Time: 7/6/2026 9:00:26 AM Notice ID: 402593
Reqrd Rsp: 1 Rsp Date: 7/6/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: AVAILABLE FIRM CAPACITY OS #1434
Notice Text:
DATE: July 6, 2026 TIME: 9:00 AM CDT
TO: ALL TENNESSEE GAS PIPELINE COMPANY, L.L.C. CUSTOMERS
RE: Binding Open Season for Firm Transportation Service on a Pipeline to be Constructed in Mississippi TGP Zone 1 (OPEN SEASON POSTING #1434)
I. General
Tennessee Gas Pipeline Company, L.L.C. ("TGP") is holding this binding open season (the "Open Season") for its proposed TGP Delta Blues Project (the “Project”) to be located in the State of Mississippi, pursuant to which TGP will provide up to 160,000 dekatherms per day (“Dth/d”) of firm transportation capacity (“Project Capacity”) with the primary receipt from a planned TGP interconnect with Texas Gas Transmission, L.L.C. (“TGT”) in Washington County, Mississippi near TGP MLV 54 and extending easterly approximately 2.35 miles on a line to be constructed to a primary delivery at a planned delivery point in Washington County, Mississippi.
The Open Season will commence as of the date and time set forth above and end at 4:00 p.m. CDT on July 15, 2026 (the "Open Season Period"). Unless otherwise indicated, capitalized terms that are used but not defined herein shall have the meanings ascribed to such terms in TGP's FERC Gas Tariff, as it may be amended from time to time (the “Tariff”).
Project Capacity awarded pursuant to the Open Season may be made available through (1) the installation of new pipeline and/or compression facilities or (2) the installation of appurtenant facilities and modifications, as may be required to meet the specific needs of Project shippers (such required facilities, the “Project Facilities”). The commencement date for the Project Capacity (the “Commencement Date”) is anticipated to be June 1, 2027.
II. Open Season/Submission of Bids
To participate in the Open Season, a potential shipper must submit to TGP a completed Service Request Form ("SRF") and confidentiality agreement, each in the form included with this notice and executed by an officer or other authorized representative of such potential shipper. Upon receipt of a potential shipper's executed SRF and confidentiality agreement, TGP shall provide such potential shipper with the form of binding precedent agreement for the Project (a “Precedent Agreement”). The Precedent Agreement shall provide the potential shipper the option to select service at the applicable recourse rate or at the negotiated rate offered by TGP for the Project.
In order to submit a “Qualifying Binding Bid” in the Open Season, in addition to providing the executed SRF and confidentiality agreement, a potential shipper must: (1) execute and deliver to TGP a Precedent Agreement, which shall be in substantially the form provided by TGP; and (2) satisfy the creditworthiness requirements set forth in such Precedent Agreement.
To the extent a potential shipper has any minimum contract quantity below which it does not desire Project Capacity or any contingencies to its bid, it should so indicate in the "Additional Information" section of the SRF.
Potential shippers should submit bids to:
Tennessee Gas Pipeline Company, L.L.C.
Attention: Lindsey Fritz
Email: tgpbidroom@kindermorgan.com AND Lindsey_Fritz@kindermorgan.com
III. Foundation Shipper Status
TGP has executed a binding Precedent Agreement with a Foundation Shipper (as hereinafter defined) for the Project (the “Original Foundation Shipper”). Notwithstanding anything herein to the contrary, the Original Foundation Shipper's executed Precedent Agreement constitutes a Qualifying Binding Bid in the Open Season.
For purposes of the Project, a “Foundation Shipper” is a shipper that:
1. executes a Precedent Agreement prior to the close of the Open Season;
2. satisfies the creditworthiness requirements set forth in such Precedent Agreement;
3. agrees to reimburse TGP for certain reimbursable costs in the event its Precedent Agreement is terminated, as further set forth in such Precedent Agreement; and
4. commits to the execution of a service agreement under TGP's Rate Schedule FT-A for service on the Project (a “Service Agreement”) that contemplates, among other things:
a. a minimum of 100,000 Dth/d of Project Capacity;
b. a term beginning on the later of (i) June 1, 2027 or (ii) the date on which all of the Project Facilities are placed in-service;
c. a term continuing for a minimum term of fifteen (15) continuous years after all of the Project Facilities are placed in-service; and
d. that such shipper shall pay a negotiated rate for service on the Project Facilities acceptable to TGP in its sole discretion, which shall include allocation of development costs and capital cost overrun adjustments.
As further set forth herein and in a Foundation Shipper's Precedent Agreement, Foundation Shipper benefits may include: (1) limited pro-ration of Project Capacity in the Open Season; and (2) a right to extend the term of the Service Agreement beyond the primary term pursuant to a contractual right of first refusal.
IV. Evaluation Method
Participation in the Open Season shall be considered binding on the bidders. To the extent TGP receives Qualifying Binding Bids for greater than the Project Capacity, TGP reserves the right to proceed with the Project as contemplated, expand the current Project to accommodate such request(s) if economically feasible, and/or address requests for excess capacity in a subsequent project and/or open season. TGP further reserves (1) the right to reject any bids for Project Capacity that it receives during the Open Season, including any Qualifying Binding Bids, on a not unduly discriminatory basis and (2) the right to suspend or terminate further development of the Project in whole or in part.
Upon the expiration of the Open Season Period, TGP will evaluate the Qualifying Binding Bids on a Net Present Value (“NPV”) basis using the following factors:
NPV = En [R*(1 / (1+i)**n)]
En = Summation of months 1 through n (Sigma)
n = term in months
R = Incremental firm monthly reservation revenue
i = Monthly Discount Factor of 0.8333%
The term in months ("n") will be no more than two-hundred forty (240) months.
TGP will award the Project Capacity to the potential shipper(s) submitting the Qualifying Binding Bid with the highest NPV. If any potential shipper submits a Qualifying Binding Bid with a higher NPV than the Original Foundation Shipper's bid, then the Original Foundation Shipper shall have the right to match or beat such bid. To the extent the Original Foundation Shipper elects to beat any Qualifying Binding Bid with a higher NPV, the Original Foundation Shipper shall be awarded one hundred percent (100%) of its Project Capacity. If the Original Foundation Shipper elects to match a Qualifying Binding Bid with a higher NPV, then the Original Foundation Shipper's Project Capacity may be subject to proration, as follows. Subjecting to the Original Foundation Shipper's right to match or beat Qualifying Binding Bids with higher NPVs, as described above, in the event that two (2) or more Qualifying Binding Bids have the same NPV, Project Capacity will be awarded in the following order of priority: (1) to Foundation Shipper(s) on a pro rata basis; and (2) to the extent Project Capacity remains available, to other potential shippers on a pro rata basis.
V. Firm Transportation Service
Service for shippers awarded Project Capacity will be provided under TGP's Rate Schedule FT-A and other applicable provisions of TGP's Tariff.
In addition to the applicable reservation rate selected by each Project shipper, and unless otherwise agreed by such shipper and TGP as set forth in such shipper's Precedent Agreement, each such shipper shall also be subject to: (1) the applicable Rate Schedule FT-A base applicable commodity; (2) the applicable Rate Schedule FT-A Fuel and Loss Retention Percentage (“F&LR”) and Electric Power Cost Rates (“EPCR”), as approved by the Federal Energy Regulatory Commission (“FERC”) for the Project Capacity, whether generally applicable or incremental; and (3) all other applicable surcharges as set forth in TGP's Tariff, including, but not limited to, any applicable annual charge adjustment (“ACA”) surcharge.
VI. TGP's Reservation of Rights
TGP reserves the following rights, in addition to all other rights that TGP has reserved herein or that TGP may have pursuant to its Tariff and FERC policies:
(1) the right, at any time during the Open Season, upon notice and in its sole discretion, to terminate the Open Season, to extend the Open Season Period, or to modify the Open Season;
(2) the right to clarify and finalize bids containing non-specific or ambiguous bid information (including, without limitation, rate, term, and receipt or delivery points) or discrepancies in bid information; provided, that, TGP shall have no obligation to do so;
(3) the right to reject, on a not unduly discriminatory basis, any bid, including any bid that, in TGP's sole determination, is incomplete, is inconsistent with the terms of the Open Season, contains additions or modifications to the terms of the Open Season, is otherwise deficient in any respect, or requests service outside the scope of the Open Season;
(4) the right to reject any bid that does not specify capacity within the path described in this notice; and
(5) the right to not award any portion of the Project Capacity.
The Open Season is subject to all applicable laws, orders, rules, and regulations of authorities having jurisdiction. No request for service shall be binding on TGP unless and until a duly authorized representative of both the requesting party and TGP have executed a binding Precedent Agreement.
VII. Creditworthiness
Following submission of an executed SRF and confidentiality agreement, TGP will conduct a credit evaluation of potential shippers. In the event a potential shipper is deemed non-creditworthy by TGP, the potential shipper must provide to TGP, as part of, and as set forth in, any binding Precedent Agreement, credit assurance applicable to the Project, in form and substance acceptable to TGP in its sole discretion. Such creditworthiness requirements shall remain in effect during the term of a shipper's Precedent Agreement, as well as the term of such shipper's Service Agreement.
VIII. Turnback Capacity Solicitation
Any existing shipper that currently holds firm transportation capacity on TGP that it believes (subject to TGP's evaluation and confirmation in its sole discretion) could be used in lieu of a portion(s) of the proposed Project Capacity, as defined and accepted by TGP, is invited to notify TGP of its desire to permanently relinquish its capacity for use in the Open Season. Any shipper who desires to turn back such capacity must notify TGP, in writing, of the MDQ, term, receipt point(s), delivery point(s), contract number(s), the reservation rate at which the shipper is willing to release the capacity back to TGP, and any other relevant information necessary to effectuate the permanent relinquishment of such capacity. In order for TGP to consider any anticipated turnbacks of capacity, such notification must be received by TGP by 4:00 PM CDT on July 15, 2026. This solicitation of turnback capacity is not binding on TGP. Turnback requests are subject to rejection or pro ration based upon the results of the Open Season and this turnback capacity solicitation as determined by TGP in its sole discretion. TGP must remain economically indifferent between the turnback offer and the proposed Project. To the extent TGP accepts a shipper's turnback request, the shipper turning back capacity shall remain responsible for any difference between the rate at which the capacity is turned back to TGP and reservation rate under the Project shipper(s) firm transportation service agreement with TGP for the remaining term of the turnback shipper's firm transportation service agreement, but will not be responsible for any commodity charges, ACA, F&LR, EPCR, or any other authorized usage surcharges associated with the turnback capacity, nor shall shipper be entitled to any credits associated with such capacity.
TGP reserves the right to reject, in its sole discretion, any turnback requests that are incomplete, contain modifications to the terms of the turnback capacity solicitation, are submitted with any conditions on the turnback capacity, or are economically disadvantageous. The final design of the Project will be based in part on the results of this turnback capacity solicitation.
IX. Contact Information
If you have any questions regarding the Open Season, please contact the following:
Lindsey Fritz
713-420-2626
Lindsey_Fritz@kindermorgan.com
For media inquiries, please contact:
Katherine Hill
(713) 369-9176
Katherine_Hill@kindermorgan.com
Tennessee Gas Pipeline Company, L.L.C.
Service Request Form – TGP Delta Blues Project
Page 1 of 2
Shipper Information:
Company
(Legal name of entity): ______________________________________________
Primary Contact: ______________________________________________
Title: ______________________________________________
Address: ______________________________________________
Telephone: ______________________________________________
Email: ______________________________________________
Project Capacity:
TQ*: _________ (in Dth/day)
*The TQ is from the origination of the pipeline to be constructed from a new receipt on TGT in Washington County, MS near TGP MLV 54 (Primary Receipt Point) to the terminus of the pipeline in Washington County, MS (Primary Delivery Point).
Primary Term: _________ (in number of years from Commencement Date) - 15 year minimum
Rate Election:
□ Recourse Rate
□ Negotiated Rate
Additional Information to Clarify Service Request:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Tennessee Gas Pipeline Company, L.L.C.
Service Request Form – TGP Delta Blues Project
Page 2 of 2
Financial and/or Credit Information:
□ Attached □ Sent Separately
Submitted by:
Name: ______________________________________________
Title: ______________________________________________
Telephone: ______________________________________________
Signature: ______________________________________________
Signature of Duly Authorized Officer or Representative
Date: ______________________________________________
Please return this form to:
Lindsey Fritz
Tennessee Gas Pipeline Company, L.L.C.
1001 Louisiana Street
Houston, TX 77002
Phone: 713-420-2626
Email: tgpbidroom@kindermorgan.com AND Lindsey_Fritz@kindermorgan.com
Confidentiality Agreement
This Confidentiality Agreement, dated as of ___________, 2026 (this “Agreement”), is by and between [NAME OF ENTITY], a [STATE OF FORMATION] [TYPE OF ENTITY] (“Counterparty”), and Tennessee Gas Pipeline Company, L.L.C., a Delaware limited liability company (“TGP”). TGP and Counterparty may sometimes be referred to herein together as the “Parties” and individually as a “Party.” This Agreement sets forth the terms and conditions under which the Parties may disclose certain information to each other of a confidential and proprietary nature.
WHEREAS, TGP has held or is holding an open season (the “Open Season”) for its proposed TGP Delta Blues Project (the “Project”);
WHEREAS, Counterparty has indicated an interest in acquiring Project capacity through the Open Season process;
WHEREAS, to facilitate discussions, negotiations, and the potential execution of definitive agreements relating to Counterparty's participation in the Project, Counterparty and TGP may each provide or disclose to the other Party certain Confidential Information (as hereinafter defined);
WHEREAS, the Parties wish to enter into this Agreement to set forth the terms and conditions under which each Party may disclose such Confidential Information to the other Party in connection with the Project; and
WHEREAS, for purposes of this Agreement, a Party disclosing Confidential Information to the other Party shall be known as the “Disclosing Party” and the Party receiving such Confidential Information shall be known as the “Receiving Party.”
NOW THEREFORE, in consideration of the covenants and conditions set forth herein and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties hereby agree as follows:
1. DEFINITION OF CONFIDENTIAL INFORMATION
1.1 As used in this Agreement, the term “Confidential Information” shall include all information about the business, financial condition, operations, assets and liabilities of the Disclosing Party and its affiliates, whether: (a) prepared by the Disclosing Party and/or its affiliates, any of its or their respective Representatives (as hereinafter defined), or otherwise; (b) in written, oral, electronic, or other form; (c) identified as “confidential” or otherwise; or (d) prepared prior to, on, or after the date of this Agreement, that is furnished to the Receiving Party or any of its Representatives by or on behalf of the Disclosing Party or any of its Representatives in connection with the Project, regardless of the manner or medium in which such Confidential Information is furnished, including all such information and documentation relating to the financial, tax, accounting, and other information of the Disclosing Party or any of its affiliates regarding business operations, prospects, value, and/or structure, marketing practices and techniques, business strategies and capabilities, business plans, and relationships with customers, suppliers, principals, employees, financing sources, hedging counterparties, contracting counterparties, and others, any such information that is a trade secret within the meaning of applicable trade secret law, and any documentation and materials prepared by the Receiving Party or any of its Representatives containing or based in whole or in part on any Confidential Information. With respect to Counterparty only, “Confidential Information” shall also include (i) the fact that the Parties are in discussions regarding the Project; (ii) any discussions, negotiations, and investigations regarding the terms, conditions, or other facts with respect to the Project, including the status thereof and the existence and terms of this Agreement; and (iii) the fact that Confidential Information has been made available by TGP to Counterparty.
1.2 Notwithstanding the foregoing, Confidential Information shall not include information that the Receiving Party can demonstrate:
(i) is rightfully known to or already in the possession of the Receiving Party or its Representatives prior to its disclosure by the Disclosing Party;
(ii) is or becomes generally available to the public other than as a result of disclosure, directly or indirectly, by the Receiving Party or its Representatives in violation of this Agreement;
(iii) is or becomes available to the Receiving Party or its Representatives on a non-confidential basis from a source other than the Disclosing Party or its affiliates or any of its or their respective Representatives; provided, that such source is not known by the Receiving Party or its Representatives (after due inquiry) to be bound by a confidentiality agreement with or other obligation of confidentiality to the Disclosing Party or its affiliates with respect to such information;
(iv) is independently derived by the Receiving Party or its Representatives without the aid, application, or use of any Confidential Information; or
(v) is authorized in writing by the Disclosing Party for disclosure by the Receiving Party, solely to the extent of such authorization.
2. PERMITTED PURPOSE, USE AND DISCLOSURE OBLIGATIONS
2.1 The Receiving Party may use, and may cause its Representatives to use, the Confidential Information solely to evaluate the feasibility of, and to facilitate discussions, negotiations, and the potential execution of definitive agreements relating to, the Project (the “Permitted Purpose”), and for no other purpose. Furthermore, the Receiving Party shall not, and shall direct its Representatives not to, directly or indirectly, at any time, disclose any Confidential Information to any person (other than the Disclosing Party or its Representatives) in any manner, except that the Receiving Party may disclose Confidential Information to its Representatives who have a bona fide need to know such information for the sole purpose of assisting, and solely to the extent necessary to permit such Representatives to assist, the Receiving Party in connection with the Permitted Purpose; provided, that, prior to the disclosure of the Confidential Information to any of its Representatives, the Receiving Party shall inform such Representatives as to the confidential and proprietary nature of the Confidential Information and shall direct each such Representative to comply with the terms of this Agreement. The Receiving Party shall be liable to the Disclosing Party for any action or omission prohibited under this Agreement by any of its Representatives.
TGP has executed a precedent agreement for Project capacity with an original foundation shipper that constitutes a qualifying bid of such original foundation shipper in the Open Season. Pursuant to the terms of such precedent agreement and the Open Season notice, the original foundation shipper has a right to match or beat any qualifying bids received by TGP during the Open Season with a higher net present value than such original foundation shipper's bid. Accordingly, notwithstanding anything herein to the contrary, the Parties agree that TGP shall have the right to provide to such original foundation shipper any information (including Confidential Information) of Counterparty that is necessary to enable such original foundation shipper to exercise such right to beat or match Open Season bids.
2.2 For purposes of this Agreement, “Representatives” of any person shall mean its affiliates and the employees, directors, partners, officers, members, managers, owners, co-owners, controlling persons, investors, co-investors, joint venturers, debt financing sources, representatives, agents, consultants, and professional advisors of such person and its affiliates (including financial advisors, counsel, and accountants). An “affiliate” of any person shall mean any other person that, directly or indirectly through one or more intermediaries, controls, is controlled by, or is or comes under common control with the first person. For purposes of the foregoing sentence, “control” of a person means the possession of power to direct or cause the direction of management and policies of such person, whether through ownership of voting securities, by contract, or otherwise. The term “person” as used in this Agreement will be interpreted broadly to include any governmental representative or authority or any corporation, company, limited liability company, enterprise, association, partnership, group or other entity or individual.
2.3 The Receiving Party agrees that it will employ procedures that are substantially similar to those it uses to protect its own information of a similar character to protect the confidentiality of any Confidential Information it receives from the Disclosing Party or its Representatives.
2.4 In the event that the Receiving Party or any of its Representatives becomes legally compelled (whether by subpoena, interrogatory, civil investigative demand, court or regulatory order, or otherwise) to disclose any Confidential Information, the Receiving Party will, to the extent permitted and reasonably feasible under the circumstances, provide the Disclosing Party with prompt written notice so that the Disclosing Party may seek a protective order or other appropriate remedy prior to any such disclosure and/or waive compliance with certain provisions of this Agreement. The Receiving Party shall reasonably cooperate with the Disclosing Party in seeking the protective order or other appropriate remedy so that the Confidential Information maintains its confidential and proprietary treatment. In the event that such a protective order or other protective remedy is not obtained or the Disclosing Party waives compliance with the relevant provisions of this Agreement, the Receiving Party will furnish only that portion of the Confidential Information that is legally required to be disclosed, in the opinion of its own counsel, and such Party will exercise its reasonable efforts to obtain reliable assurances that confidential treatment will be accorded the Confidential Information.
2.5 Within 15 days after being requested in writing by the Disclosing Party (which request may be made at any time and from time to time), the Receiving Party shall, and shall direct its Representatives to, either return to the Disclosing Party or destroy all Confidential Information and all documents, materials, or other items containing Confidential Information, without retaining any copies, summaries, or extracts thereof, and shall provide written confirmation of such return and/or destruction to the Disclosing Party within such 15 day period; provided, however, that the Receiving Party and its Representatives shall not be required to return or destroy any electronic copies of any such Confidential Information, or any documents, materials, or other items containing Confidential Information, that shall have been archived in the Receiving Party's or its Representatives' electronic records archival system until such items are destroyed in accordance with the Receiving Party's or its Representatives' normal destruction policies; provided, further, that, notwithstanding any termination or expiration of this Agreement, all provisions of this Agreement shall continue to apply with full force and effect to any materials containing Confidential Information that are retained by Receiving Party or its Representatives following a written request for the return or destruction thereof. Compliance with this Section shall not relieve the Receiving Party of its other obligations under this Agreement.
3. GENERAL
3.1 This Agreement shall be governed by, and construed in accordance with, the laws of the State of Texas, regardless of conflicts of laws principles that might apply the laws of another jurisdiction. EACH PARTY HEREBY CONSENTS TO THE JURISDICTION AND VENUE OF THE COMPETENT STATE AND FEDERAL COURTS LOCATED IN HARRIS COUNTY, TEXAS FOR ANY ACTION BROUGHT UNDER THIS AGREEMENT. EACH PARTY HEREBY IRREVOCABLY WAIVES ANY OBJECTION TO SUCH COURTS ON JURISDICTION, CONVENIENCE OR ANY OTHER GROUND. THE PRECEDING SHALL NOT APPLY TO A PARTY'S SEEKING TO ENFORCE A JUDGMENT OF SUCH COURT IN ANOTHER COURT, VENUE, OR JURISDICTION.
3.2 EACH PARTY HEREBY IRREVOCABLY WAIVES ANY RIGHT TO TRIAL BY JURY.
3.3 IN NO EVENT SHALL A PARTY BE ENTITLED TO RECOVER PUNITIVE, INDIRECT, CONSEQUENTIAL, LOST PROFIT, LOSS OF REVENUE OR OPPORTUNITY, SPECIAL OR EXEMPLARY DAMAGES UNDER THIS AGREEMENT.
3.4 If any provision of this Agreement is declared void or otherwise unenforceable, such provision shall be deemed to have been severed from this Agreement, which shall otherwise remain in full force and effect.
3.5 No failure or delay by a Party in exercising any right, power or privilege hereunder shall operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or further exercise thereof or the exercise of any other right, power or privilege hereunder.
3.6 The Receiving Party hereby acknowledges and agrees that any Confidential Information disclosed to the Receiving Party or its Representatives is considered by the Disclosing Party to be of a special, unique, and proprietary character and that, in the event of any breach or threatened breach of any provision of this Agreement, remedies at law may be inadequate. The Receiving Party agrees, therefore, on behalf of itself and its Representatives, that the Disclosing Party may be entitled to specific performance and injunctive or other equitable relief without any showing of irreparable harm or damage, and the Receiving Party hereby waives, and shall cause its Representatives to waive, any requirement for the securing or posting of any bond or other security in connection with any such remedy. Such remedies shall not be deemed to be the exclusive remedies for any breach or threatened breach of this Agreement, but will be in addition to all other remedies available at law or in equity to the Disclosing Party or any of its affiliates. Any trade secrets included in the Confidential Information will also be entitled to all of the protections and benefits under applicable trade secret law. The Receiving Party hereby waives, and shall use all reasonable efforts to cause its Representatives to waive, any requirement that the Disclosing Party or any of its affiliates submit proof of the economic value of any trade secret or post a bond or other security.
3.7 Neither this Agreement nor disclosure of any Confidential Information to the Receiving Party or its Representatives shall be deemed by implication or otherwise to vest in the Receiving Party or its Representatives rights in or to the Confidential Information, other than the right to use such Confidential Information solely for the Permitted Purpose. The Disclosing Party shall retain sole and exclusive ownership of all right, title, and interest in and to all Confidential Information and any and all materials provided by the Disclosing Party or its Representatives to the Receiving Party or its Representatives hereunder, and all intellectual property rights therein. The Receiving Party's right to use the Confidential Information for the Permitted Purpose is revocable and not coupled with an interest in any Confidential Information. No license by implication, estoppel, or otherwise under any patent, copyright, trade secret, trade mark, or other intellectual property right is granted by the Disclosing Party hereunder, other than any such license or other right to use disclosed Confidential Information for the Permitted Purpose. Neither Party represents or warrants that Confidential Information disclosed hereunder will not infringe any third party's patents, copyrights or trade secrets or other proprietary rights.
3.8 The Receiving Party acknowledges, on behalf of itself and its Representatives, that neither the Disclosing Party nor its Representatives makes any representations or warranties, express or implied, as to the accuracy or completeness of the Confidential Information, that neither the Disclosing Party nor its Representatives shall have any liability whatsoever to the Receiving Party or its Representatives or any other person as a result of the use of the Confidential Information or any errors therein or omissions therefrom by virtue of this Agreement and that the Receiving Party and its Representatives shall assume full responsibility for all conclusions derived from the Confidential Information.
3.9 Both Parties acknowledge and agree that neither Party is obligated to enter into or commence or continue any discussions or negotiations pertaining to the Project, and that no such obligation shall arise unless and until a definitive agreement relating to the Project is executed and delivered by the Parties.
3.10 No agency, partnership, joint venture, or other joint relationship is created by this Agreement. There are no third parties that are intended to benefit from any of the agreements created hereby.
3.11 This Agreement shall not be assignable by Counterparty without the express written consent of TGP. This Agreement shall be binding upon the Parties hereto and upon their respective successors and assigns.
3.12 All notices, consents, approvals, requests, claims, demands, and other communications required or permitted under this Agreement (each, a “Notice”) shall be in writing and may be delivered by personal delivery, by certified or registered United States mail (postage prepaid, return receipt requested), by a nationally recognized overnight delivery service for next day delivery, or by electronic mail to the address shown below in respect of a Party (or at another address designated by a Party by Notice to the other Party). Any Notice delivered or transmitted to a Party as provided above will be deemed to have been given and received on the day it is delivered or transmitted, if it is delivered before 5:00 p.m., local time, on a business day, or on the next business day if it is delivered or transmitted after such time or on a day that is not a business day.
Notice Address(es) for TGP:
Tennessee Gas Pipeline Company, L.L.C.
1001 Louisiana Street
Houston, Texas 77002
Attention: Lindsey Fritz, Director, Business Development
Email: Lindsey_Fritz@kindermorgan.com
Notice Address(es) for Counterparty:
[INSERT FULL LEGAL NAME, ADDRESS, CONTACT, TITLE, EMAIL]
3.13 Except as otherwise provided herein, the restrictions and covenants set forth herein shall terminate and be of no further force and effect upon the two-year anniversary of this Agreement. For the avoidance of doubt, any Confidential Information retained by the Receiving Party or its Representatives following a request for the return or destruction thereof shall remain subject to all provisions of this Agreement notwithstanding the expiration of this Agreement pursuant to this Section 3.13. Following the expiration or termination of this Agreement, the following provisions shall survive for purposes of any claim or dispute relating to the Agreement: 3.1, 3.2, 3.3, and 3.13.
3.14 This Agreement constitutes the entire agreement and supersedes all prior agreements and understandings, both written and oral, between the Parties with respect to the subject matter hereof.
3.15 This Agreement may be executed in one or more counterparts (which may be delivered via emailed .pdf or other electronic means), each of which shall be deemed to be an original, but all of which shall constitute the same agreement.
[Signature page follows.]
IN WITNESS WHEREOF, authorized representatives of the Parties have executed this Agreement as of the date first written above.
Tennessee Gas Pipeline Company, L.L.C.
By: ____________________________________
Name:
Title:
[FULL LEGAL NAME OF COUNTERPARTY]
By: ____________________________________
Name:
Title:
..
Algonquin Gas Transmission
07/05/2026- AGT Pipeline Conditions for 7/6/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/06/2026
Notice End Date: 07/07/2026
Posting Date: 07/05/2026
Notice Identifier: 180037
Required Response Indicator Description: No response required
For Gas Day July 6, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
100%
Planned Outage
Cromwell
100%
100%
100%
100%
100%
13%
Planned Outage
Burrillville
100%
100%
100%
100%
100%
95%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
24%
Iroquois Receipts
100%
100%
48%
Hanover West
100%
100%
91%
Mendon Receipts
100%
100%
100%
100%
60%
Lincoln Receipts
100%
100%
84%
G System
100%
100%
40%
C System
Yes
I-8 West to East
Yes
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/04/2026- AGT Pipeline Conditions for 7/5/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/05/2026
Notice End Date: 07/06/2026
Posting Date: 07/04/2026
Notice Identifier: 180003
Required Response Indicator Description: No response required
For Gas Day July 5, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
60%
Cromwell
100%
100%
58%
Burrillville
100%
100%
98%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
46%
Iroquois Receipts
100%
100%
56%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
82%
Lincoln Receipts
100%
100%
84%
G System
100%
100%
59%
C System
Yes
I-8 West to East
100%
100%
36%
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - issued 7/1/26. 500 Dth / 2% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119135
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 6 2026 6:25AM
Effective: Jul 6 2026 6:25AM
End Date: Jul 7 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119135
Critical Notice Description: Critical notice
Posting Date/Time: Jul 6 2026 6:25AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 6 2026 6:25AM
Notice End Date/Time: Jul 7 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 6, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 6, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119112
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Jul 5 2026 7:22AM
Effective: Jul 5 2026 7:18AM
End Date: Jul 6 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119112
Critical Notice Description: Critical notice
Posting Date/Time: Jul 5 2026 7:22AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 5 2026 7:18AM
Notice End Date/Time: Jul 6 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAJuly 5, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, July 5, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Algonquin Gas Transmission
07/03/2026- AGT Pipeline Conditions for 7/4/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/04/2026
Notice End Date: 07/05/2026
Posting Date: 07/03/2026
Notice Identifier: 179974
Required Response Indicator Description: No response required
For Gas Day July 4, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
60%
Cromwell
100%
100%
58%
Burrillville
100%
100%
98%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
46%
Iroquois Receipts
100%
100%
56%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
82%
Lincoln Receipts
100%
100%
84%
G System
100%
100%
59%
C System
Yes
I-8 West to East
100%
100%
36%
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - issued 7/1/26. 500 Dth / 2% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission
07/01/2026- AGT Pipeline Conditions for 7/2/2026
UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 7/2/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/02/2026
Notice End Date: 07/03/2026
Posting Date: 07/01/2026
Notice Identifier: 179907
Required Response Indicator Description: No response required
For Gas Day July 2, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
73%
Cromwell
100%
100%
73%
Burrillville
100%
100%
100%
42%
Planned Outage
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
69%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
72%
Lincoln Receipts
100%
100%
84%
G System
100%
100%
54%
C System
Yes
I-8 West to East
100%
100%
33%
Centerville-Transco Receipts (1)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - issued 7/1/26. 500 Dth / 2% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Transco
Location(s) Off Rate Notice - Underperformance
UNSCORED
Informational
View original notice text
Pipeline: Transco
Notice: Location(s) Off Rate Notice - Underperformance
Posted: 07/02/2026 12:44:11 PM
Notice ID: 17022606
Notice 17022606
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical:
Y
Notice Eff Date:
07/02/2026
Notice Eff Time:
12:44:11 CDT
Notice End Date:
Notice End Time:
Notice ID:
17022606
Notice Stat Desc:
Initiate
Notice Type Desc:
Ovr-Undr Perf
Post Date:
07/02/2026
Post Time:
12:44:11 CDT
Prior Notice:
0
Reqrd Rsp Desc:
Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP:
007933021
TSP Name:
TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Notice Text:
Subject:
Location(s) Off Rate Notice - Underperformance
Transco is providing notice that the following location(s) are off rate and underperforming. If performance has not improved during the current or subsequent cycle, Transco may limit scheduled volumes to actual flows.
Transco may also be required to take further action including issuing a Location Specific Operational Flow Order (OFO). Additional notice prior to the effective time of any further required action, including the issuance of a Location Specific OFO, may be limited.
Location Name
Location ID
Location Type
Zone
LIBERTY DRIVE M3636
9006342
Receipt
Zone 6
If you have any questions, please contact your Transportation Services Representative.
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 119047
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Posted: Jul 2 2026 7:16AM
Effective: Jul 2 2026 7:14AM
End Date: Jul 3 2026 8:59AM
Notice Type Description: Operational Alert
Notice Identifier: 119047
Critical Notice Description: Critical notice
Posting Date/Time: Jul 2 2026 7:16AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Jul 2 2026 7:14AM
Notice End Date/Time: Jul 3 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREAJuly 2, 2026Due to high line pack in the Phoenix Area, Transwestern is declaring a Same Day Underage Alert for the Phoenix Area for gas day, July 2 2026. Any Operator of a delivery point in the Phoenix Area at which actual quantities are less than scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this high line pack conditionwill continue at least for the entire gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.Please contact Gas Control or your marketing representative with any questions
Texas Eastern Transmission (TETCO)
07/01/2026- Hope to Donaldson Line 1 Valve Section 1 Isolation -- COMPLETE
UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Hope to Donaldson Line 1 Valve Section 1 Isolation -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/01/2026
Notice End Date: 09/29/2026
Posting Date: 07/01/2026
Notice Identifier: 179911
Required Response Indicator Description: No response required
Notice Text:
Texas Eastern has completed the previously posted Hope to Donaldson Line 1 Valve Section 1 isolation (June 30 - July 2) ahead of schedule and the line has been returned to normal operations.
Effective immediately, all restrictions associated with this outage have been lifted.
Please contact your Operations Account Representative if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
NOTICE DETAIL
PDF
TEXT
Return To Results
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1): STORAGE Notice Type Desc (2): RESTRICTIONS
Notice Eff Date/Time: 07/01/2026 1:15:28PM Notice End Date/Time: 07/02/2026 9:00:00am
Post Date/Time: 7/1/2026 1:15:28 PM Notice ID: 402467
Reqrd Rsp: 1 Rsp Date: 7/1/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: MONTHLY STORAGE TRANSFER REMINDER
Notice Text:
MONTHLY STORAGE TRANSFERS FOR JULY 1, 2026
DART provides the ability for storage customers to enter their own storage transfers online. The transfers must be confirmed on or before the effective date. If you have a terminated or recalled contract that needs the balance transferred to the base storage contract holder or a new contract, these transfers need to be completed on or before the first of the month.
For terminated storage contracts per the firm storage rate schedule of the Tennessee Gas Pipeline tariff on First Revised Sheet No. 217, Section 11: “Shippers must withdraw or transfer its Storage Balance on or before the date of the expiration of its FS Service Agreement. To the extent that a Shipper fails to dispose of or transfer its entire Storage Balance, Transporter shall retain and take title to Shipper's remaining Storage Balance at no cost to Transporter.”
PLEASE NOTE: When the first of the month falls on a weekend or holiday, any small volume left on a terminated or recalled storage contract will be moved for the customers by TGP to the new valid contract if requested by the customer on the first business day following the weekend or holiday provided that efforts have been made prior to the first and/or holiday to transfer allocated balances prior to the weekend and/or holiday before requesting TGP to move the remaining balance.
TENNESSEE GAS PIPELINE WILL CONFISCATE ANY REMAINING BALANCE NOT TRANSFERRED OR REQUESTED BY THE CUSTOMER TO BE TRANSFERRED ON TERMINATED FIRM STORAGE CONTRACTS.
Please contact your Primary Gas Scheduler if you need procedures and/or help with your storage transfer.
..
[Sea Robin Pipeline] [Oper Alert] Sea Robin West Condensate Removal Facility Update #1
UNSCORED
Informational
View original notice text
Pipeline: Sea Robin Pipeline
Notice ID: 65653
Notice Type: Oper Alert
Subject: Sea Robin West Condensate Removal Facility Update #1
Posted: 2026-07-01 08:51:00.0
Effective: 2026-07-01 08:51:00.0
End Date:
Notice ID: 65653
Notice Type: OPA
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-07-01 08:51:00.0
Subject: Sea Robin West Condensate Removal Facility Update #1
Notice Effective Date/Time: 2026-07-01 08:51:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: July 1, 2026 Sea Robin West Condensate Removal Facility Update #1 Sea Robin has been informed that the Condensate Removal Facility will be operational on or around August 1, 2026. Updates to this posting will be provided when additional information is available. If you have any questions, please contact your Marketing or Nominations representative.