03/20/2026- ETNG Pipeline Conditions for 3/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/21/2026
Notice End Date: 03/22/2026
Posting Date: 03/20/2026
Notice Identifier: 175459
Required Response Indicator Description: No response required

For Gas Day March 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
Lobelville Receipts
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/19/2026- ETNG Pipeline Conditions for 03/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 03/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/20/2026
Notice End Date: 03/21/2026
Posting Date: 03/19/2026
Notice Identifier: 175405
Required Response Indicator Description: No response required

For Gas Day March 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
Lobelville Receipts
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/18/2026- ETNG Pipeline Conditions for 3/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/19/2026
Notice End Date: 03/20/2026
Posting Date: 03/18/2026
Notice Identifier: 175355
Required Response Indicator Description: No response required

For Gas Day March 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
18%
Boyds Creek
Yes
Lobelville Receipts
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/17/2026- ETNG Pipeline Conditions for 03/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 03/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/18/2026
Notice End Date: 03/19/2026
Posting Date: 03/17/2026
Notice Identifier: 175316
Required Response Indicator Description: No response required

For Gas Day March 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
46%
Boyds Creek
Yes
Lewisburg
Yes
Lobelville Receipts
100%
11%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/24/2026- ETNG Pipeline Conditions for 3/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 03/25/2026
Notice End Date: 03/26/2026
Posting Date: 03/24/2026
Notice Identifier: 175613
Prior Notice Identifier: 175612
Required Response Indicator Description: No response required

For Gas Day March 25, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/23/2026- ETNG Pipeline Conditions for 3/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/24/2026
Notice End Date: 03/25/2026
Posting Date: 03/23/2026
Notice Identifier: 175568
Required Response Indicator Description: No response required

For Gas Day March 24, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/22/2026- ETNG Pipeline Conditions for 3/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/23/2026
Notice End Date: 03/24/2026
Posting Date: 03/22/2026
Notice Identifier: 175540
Required Response Indicator Description: No response required

For Gas Day March 23, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/21/2026- ETNG Pipeline Conditions for 3/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/22/2026
Notice End Date: 03/23/2026
Posting Date: 03/21/2026
Notice Identifier: 175491
Required Response Indicator Description: No response required

For Gas Day March 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
Lobelville Receipts
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/25/2026- ETNG Pipeline Conditions for 03/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 03/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/26/2026
Notice End Date: 03/27/2026
Posting Date: 03/25/2026
Notice Identifier: 175653
Required Response Indicator Description: No response required

For Gas Day March 26, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/26/2026- ETNG Pipeline Conditions for 3/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/27/2026
Notice End Date: 03/28/2026
Posting Date: 03/26/2026
Notice Identifier: 175706
Required Response Indicator Description: No response required

For Gas Day March 27, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/29/2026- ETNG Pipeline Conditions for 3/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/30/2026
Notice End Date: 03/31/2026
Posting Date: 03/29/2026
Notice Identifier: 175844
Required Response Indicator Description: No response required

For Gas Day March 30, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/28/2026- ETNG Pipeline Conditions for 3/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/29/2026
Notice End Date: 03/30/2026
Posting Date: 03/28/2026
Notice Identifier: 175793
Required Response Indicator Description: No response required

For Gas Day March 29, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/27/2026- ETNG Pipeline Conditions for 3/28/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/28/2026
Notice End Date: 03/29/2026
Posting Date: 03/27/2026
Notice Identifier: 175750
Required Response Indicator Description: No response required

For Gas Day March 28, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/30/2026- ETNG Pipeline Conditions for 3/31/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 3/31/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 03/31/2026
Notice End Date: 04/01/2026
Posting Date: 03/30/2026
Notice Identifier: 175863
Required Response Indicator Description: No response required

For Gas Day March 31, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

03/31/2026- ETNG Pipeline Conditions for 4/1/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/1/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/01/2026
Notice End Date: 04/02/2026
Posting Date: 03/31/2026
Notice Identifier: 175917
Required Response Indicator Description: No response required

For Gas Day April 1, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/09/2026- ETNG Pipeline Conditions for 4/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/10/2026
Notice End Date: 04/11/2026
Posting Date: 04/09/2026
Notice Identifier: 176311
Required Response Indicator Description: No response required

For Gas Day April 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/08/2026- ETNG Pipeline Conditions for 4/9/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 04/10/2026
Posting Date: 04/08/2026
Notice Identifier: 176265
Required Response Indicator Description: No response required

For Gas Day April 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
23%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/07/2026- ETNG Pipeline Conditions for 4/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/08/2026
Notice End Date: 04/09/2026
Posting Date: 04/07/2026
Notice Identifier: 176225
Required Response Indicator Description: No response required

For Gas Day April 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
38%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/06/2026- ETNG Pipeline Conditions for 4/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/07/2026
Notice End Date: 04/08/2026
Posting Date: 04/06/2026
Notice Identifier: 176180
Required Response Indicator Description: No response required

For Gas Day April 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
32%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/10/2026- ETNG Pipeline Conditions for 04/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/12/2026
Posting Date: 04/10/2026
Notice Identifier: 176356
Required Response Indicator Description: No response required

For Gas Day April 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/11/2026- ETNG Pipeline Conditions for 4/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/12/2026
Notice End Date: 04/13/2026
Posting Date: 04/11/2026
Notice Identifier: 176425
Required Response Indicator Description: No response required

For Gas Day April 12, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/12/2026- ETNG Pipeline Conditions for 4/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/14/2026
Posting Date: 04/12/2026
Notice Identifier: 176473
Required Response Indicator Description: No response required

For Gas Day April 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
87%
Transco Receipts
100%
100%
100%
70%
Planned Outage
Tracy City
100%
70%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/13/2026- ETNG Pipeline Conditions for 4/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 04/15/2026
Posting Date: 04/13/2026
Notice Identifier: 176514
Required Response Indicator Description: No response required

For Gas Day April 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
38%
Deliveries To Texas Eastern
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/14/2026- ETNG Pipeline Conditions for 4/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 04/16/2026
Posting Date: 04/14/2026
Notice Identifier: 176574
Required Response Indicator Description: No response required

For Gas Day April 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
25%
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
100%
12%
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/15/2026- ETNG Pipeline Conditions for 4/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/15/2026
Notice Identifier: 176673
Required Response Indicator Description: No response required

For Gas Day April 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
28%
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/16/2026- ETNG Pipeline Conditions for 4/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 04/18/2026
Posting Date: 04/16/2026
Notice Identifier: 176692
Required Response Indicator Description: No response required

For Gas Day April 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
41%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/17/2026- ETNG Pipeline Conditions for 04/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176738
Required Response Indicator Description: No response required

For Gas Day April 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/17/2026- ETNG Action Alert -- EFF 4/18

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 4/18
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 07/16/2026
Posting Date: 04/17/2026
Notice Identifier: 176722
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 16 - April 17
Gas Day April 18 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
East Tennessee Natural Gas

04/18/2026- ETNG Pipeline Conditions for 4/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/19/2026
Notice End Date: 04/20/2026
Posting Date: 04/18/2026
Notice Identifier: 176783
Required Response Indicator Description: No response required

For Gas Day April 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
23%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/19/2026- ETNG Pipeline Conditions for 4/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/21/2026
Posting Date: 04/19/2026
Notice Identifier: 176810
Required Response Indicator Description: No response required

For Gas Day April 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
47%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
100%
62%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/20/2026- ETNG Pipeline Conditions for 4/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/21/2026
Notice End Date: 04/22/2026
Posting Date: 04/20/2026
Notice Identifier: 176854
Required Response Indicator Description: No response required

For Gas Day April 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/21/2026- ETNG Pipeline Conditions for 04/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 04/23/2026
Posting Date: 04/21/2026
Notice Identifier: 176889
Required Response Indicator Description: No response required

For Gas Day April 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/22/2026- ETNG Pipeline Conditions for 04/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/23/2026
Notice End Date: 04/24/2026
Posting Date: 04/22/2026
Notice Identifier: 176922
Required Response Indicator Description: No response required

For Gas Day April 23, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/23/2026- ETNG Action Alert -- EFF 4/25

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 4/25
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 07/22/2026
Posting Date: 04/23/2026
Notice Identifier: 176953
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 23 - April 24
Gas Day April 25 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
East Tennessee Natural Gas

04/23/2026- ETNG Pipeline Conditions for 4/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/23/2026
Notice Identifier: 176963
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/24/2026- ETNG Pipeline Conditions for 4/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/26/2026
Posting Date: 04/24/2026
Notice Identifier: 177022
Required Response Indicator Description: No response required

For Gas Day April 25, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/25/2026- ETNG Pipeline Conditions for 04/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/26/2026
Notice End Date: 04/27/2026
Posting Date: 04/25/2026
Notice Identifier: 177062
Required Response Indicator Description: No response required

For Gas Day April 26, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/26/2026- ETNG Pipeline Conditions for 04/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 04/28/2026
Posting Date: 04/26/2026
Notice Identifier: 177095
Required Response Indicator Description: No response required

For Gas Day April 27, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/27/2026- ETNG Pipeline Conditions for 4/28/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/28/2026
Notice End Date: 04/29/2026
Posting Date: 04/27/2026
Notice Identifier: 177139
Required Response Indicator Description: No response required

For Gas Day April 28, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
100%
19%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/28/2026- ETNG Pipeline Conditions for 4/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 04/30/2026
Posting Date: 04/28/2026
Notice Identifier: 177185
Required Response Indicator Description: No response required

For Gas Day April 29, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
19%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/29/2026- ETNG Pipeline Conditions for 4/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/30/2026
Notice End Date: 05/01/2026
Posting Date: 04/29/2026
Notice Identifier: 177219
Required Response Indicator Description: No response required

For Gas Day April 30, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
96%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/30/2026- ETNG Action Alert -- EFF 5/2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 5/2
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/02/2026
Notice End Date: 05/04/2026
Posting Date: 04/30/2026
Notice Identifier: 177248
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 30 - May 1
Gas Day May 2 - May 3
Gas Day May 4 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 10% / 500
No OFO/No Action Alert
East Tennessee Natural Gas

04/30/2026- ETNG Pipeline Conditions for 05/01/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/01/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/01/2026
Notice End Date: 05/02/2026
Posting Date: 04/30/2026
Notice Identifier: 177266
Required Response Indicator Description: No response required

For Gas Day May 1, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Boyds Creek
Yes
Deliveries To Texas Eastern
100%
100%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/03/2026- ETNG Pipeline Conditions for 5/4/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/04/2026
Notice End Date: 05/05/2026
Posting Date: 05/03/2026
Notice Identifier: 177432
Required Response Indicator Description: No response required

For Gas Day May 4, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/02/2026- ETNG Pipeline Conditions for 5/3/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/3/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/03/2026
Notice End Date: 05/04/2026
Posting Date: 05/02/2026
Notice Identifier: 177402
Required Response Indicator Description: No response required

For Gas Day May 3, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued May 2, 2026. 500 Dth / 10% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/01/2026- ETNG Pipeline Conditions for 5/2/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/2/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/02/2026
Notice End Date: 05/03/2026
Posting Date: 05/01/2026
Notice Identifier: 177340
Required Response Indicator Description: No response required

For Gas Day May 2, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 30, 2026. 500 Dth / 10% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/04/2026- ETNG Pipeline Conditions for 5/5/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/05/2026
Notice End Date: 05/06/2026
Posting Date: 05/04/2026
Notice Identifier: 177457
Required Response Indicator Description: No response required

For Gas Day May 5, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/05/2026- ETNG Pipeline Conditions for 5/6/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/06/2026
Notice End Date: 05/07/2026
Posting Date: 05/05/2026
Notice Identifier: 177505
Required Response Indicator Description: No response required

For Gas Day May 6, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/06/2026- ETNG Pipeline Conditions for 5/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/07/2026
Notice End Date: 05/08/2026
Posting Date: 05/06/2026
Notice Identifier: 177553
Required Response Indicator Description: No response required

For Gas Day May 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/07/2026- ETNG Pipeline Conditions for 5/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/08/2026
Notice End Date: 05/09/2026
Posting Date: 05/07/2026
Notice Identifier: 177591
Required Response Indicator Description: No response required

For Gas Day May 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/08/2026- ETNG Pipeline Conditions for 05/09/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/09/2026
Notice End Date: 05/10/2026
Posting Date: 05/08/2026
Notice Identifier: 177636
Required Response Indicator Description: No response required

For Gas Day May 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/09/2026- ETNG Pipeline Conditions for 5/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/10/2026
Notice End Date: 05/11/2026
Posting Date: 05/09/2026
Notice Identifier: 177694
Required Response Indicator Description: No response required

For Gas Day May 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/10/2026- ETNG Pipeline Conditions for 5/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/11/2026
Notice End Date: 05/12/2026
Posting Date: 05/10/2026
Notice Identifier: 177725
Required Response Indicator Description: No response required

For Gas Day May 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/11/2026- ETNG Pipeline Conditions for 05/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/12/2026
Notice End Date: 05/13/2026
Posting Date: 05/11/2026
Notice Identifier: 177753
Required Response Indicator Description: No response required

For Gas Day May 12, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/12/2026- ETNG Pipeline Conditions for 5/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/13/2026
Notice End Date: 05/14/2026
Posting Date: 05/12/2026
Notice Identifier: 177790
Required Response Indicator Description: No response required

For Gas Day May 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/13/2026- ETNG Pipeline Conditions for 5/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/14/2026
Notice End Date: 05/15/2026
Posting Date: 05/13/2026
Notice Identifier: 177834
Required Response Indicator Description: No response required

For Gas Day May 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/15/2026- ETNG Pipeline Conditions for 5/16/2026 - UPDATE

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/16/2026 - UPDATE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 05/16/2026
Notice End Date: 05/17/2026
Posting Date: 05/15/2026
Notice Identifier: 177983
Prior Notice Identifier: 177982
Required Response Indicator Description: No response required

For Gas Day May 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/16/26. 500 Dth / 5% Tolerance
Imbalances Warnings
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/16/2026- ETNG Pipeline Conditions for 5/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/17/2026
Notice End Date: 05/18/2026
Posting Date: 05/16/2026
Notice Identifier: 178012
Required Response Indicator Description: No response required

For Gas Day May 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/16/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/15/2026- ETNG Pipeline Conditions for 5/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/16/2026
Notice End Date: 05/17/2026
Posting Date: 05/15/2026
Notice Identifier: 177982
Required Response Indicator Description: No response required

For Gas Day May 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/14/2026- ETNG Pipeline Conditions for 5/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/15/2026
Notice End Date: 05/16/2026
Posting Date: 05/14/2026
Notice Identifier: 177937
Required Response Indicator Description: No response required

For Gas Day May 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/18/2026- ETNG Pipeline Conditions for 5/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/19/2026
Notice End Date: 05/20/2026
Posting Date: 05/18/2026
Notice Identifier: 178072
Required Response Indicator Description: No response required

For Gas Day May 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/22/2026- ETNG Pipeline Conditions for 05/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/23/2026
Notice End Date: 05/24/2026
Posting Date: 05/22/2026
Notice Identifier: 178249
Required Response Indicator Description: No response required

For Gas Day May 23, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/23/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/21/2026- ETNG Action Alert -- EFF 5/23

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 5/23
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/23/2026
Notice End Date: 05/26/2026
Posting Date: 05/21/2026
Notice Identifier: 178187
Required Response Indicator Description: No response required

Operational Areas
Gas Day May 21 - May 22
Gas Day May 23 - May 25
Gas Day May 26 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 8% / 500
No OFO/No Action Alert
East Tennessee Natural Gas

05/19/2026- ETNG Pipeline Conditions for 5/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/20/2026
Notice End Date: 05/21/2026
Posting Date: 05/19/2026
Notice Identifier: 178114
Required Response Indicator Description: No response required

For Gas Day May 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/23/2026- ETNG Pipeline Conditions for 5/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/24/2026
Notice End Date: 05/25/2026
Posting Date: 05/23/2026
Notice Identifier: 178292
Required Response Indicator Description: No response required

For Gas Day May 24, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/23/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/24/2026- ETNG Pipeline Conditions for 5/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/25/2026
Notice End Date: 05/26/2026
Posting Date: 05/24/2026
Notice Identifier: 178322
Required Response Indicator Description: No response required

For Gas Day May 25, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/23/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/25/2026- ETNG Pipeline Conditions for 5/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/26/2026
Notice End Date: 05/27/2026
Posting Date: 05/25/2026
Notice Identifier: 178352
Required Response Indicator Description: No response required

For Gas Day May 26, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/26/2026- ETNG Pipeline Conditions for 5/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/27/2026
Notice End Date: 05/28/2026
Posting Date: 05/26/2026
Notice Identifier: 178385
Required Response Indicator Description: No response required

For Gas Day May 27, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
100%
45%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/28/2026- ETNG Pipeline Conditions for 5/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/29/2026
Notice End Date: 05/30/2026
Posting Date: 05/28/2026
Notice Identifier: 178486
Required Response Indicator Description: No response required

For Gas Day May 29, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/28/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/27/2026- ETNG Action Alert -- EFF 5/28

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 5/28
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/28/2026
Notice End Date: 06/02/2026
Posting Date: 05/27/2026
Notice Identifier: 178374
Required Response Indicator Description: No response required

Operational Areas
Gas Day May 26 - May 27
Gas Day May 28 - June 1
Gas Day June 2 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 8% / 500
No OFO/No Action Alert
East Tennessee Natural Gas

05/29/2026- ETNG Pipeline Conditions for 5/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/30/2026
Notice End Date: 05/31/2026
Posting Date: 05/29/2026
Notice Identifier: 178511
Required Response Indicator Description: No response required

For Gas Day May 30, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/28/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/30/2026- ETNG Pipeline Conditions for 05/31/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/31/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/31/2026
Notice End Date: 06/01/2026
Posting Date: 05/30/2026
Notice Identifier: 178549
Required Response Indicator Description: No response required

For Gas Day May 31, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/28/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/31/2026- ETNG Pipeline Conditions for 06/01/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/01/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/01/2026
Notice End Date: 06/02/2026
Posting Date: 05/31/2026
Notice Identifier: 178580
Required Response Indicator Description: No response required

For Gas Day June 1, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/28/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/01/2026- ETNG Pipeline Conditions for 6/2/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/2/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/02/2026
Notice End Date: 06/03/2026
Posting Date: 06/01/2026
Notice Identifier: 178626
Required Response Indicator Description: No response required

For Gas Day June 2, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/04/2026- ETNG Pipeline Conditions for 6/5/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/05/2026
Notice End Date: 06/06/2026
Posting Date: 06/04/2026
Notice Identifier: 178749
Required Response Indicator Description: No response required

For Gas Day June 5, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
100%
36%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/03/2026- ETNG Pipeline Conditions for 06/04/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/04/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/04/2026
Notice End Date: 06/05/2026
Posting Date: 06/03/2026
Notice Identifier: 178705
Required Response Indicator Description: No response required

For Gas Day June 4, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/02/2026- ETNG Pipeline Conditions for 6/3/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/3/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/03/2026
Notice End Date: 06/04/2026
Posting Date: 06/02/2026
Notice Identifier: 178679
Required Response Indicator Description: No response required

For Gas Day June 3, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/05/2026- ETNG Pipeline Conditions for 6/6/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/06/2026
Notice End Date: 06/07/2026
Posting Date: 06/05/2026
Notice Identifier: 178790
Required Response Indicator Description: No response required

For Gas Day June 6, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
100%
73%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/06/2026- ETNG Pipeline Conditions for 6/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/07/2026
Notice End Date: 06/08/2026
Posting Date: 06/06/2026
Notice Identifier: 178835
Required Response Indicator Description: No response required

For Gas Day June 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
100%
76%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/10/2026- ETNG Pipeline Conditions for 6/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/11/2026
Notice End Date: 06/12/2026
Posting Date: 06/10/2026
Notice Identifier: 179031
Required Response Indicator Description: No response required

For Gas Day June 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Gainsboro
100%
100%
100%
100%
Planned Outage
Madisonville North
100%
100%
100%
Fordtown West
100%
100%
21%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/09/2026- ETNG Pipeline Conditions for 6/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/10/2026
Notice End Date: 06/11/2026
Posting Date: 06/09/2026
Notice Identifier: 178960
Required Response Indicator Description: No response required

For Gas Day June 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Gainsboro
100%
100%
100%
100%
Planned Outage
Madisonville North
100%
98%
Fordtown West
100%
100%
46%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/08/2026- ETNG Pipeline Conditions for 6/9/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/09/2026
Notice End Date: 06/10/2026
Posting Date: 06/08/2026
Notice Identifier: 178919
Required Response Indicator Description: No response required

For Gas Day June 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Gainsboro
100%
100%
100%
100%
Planned Outage
Lobelville Receipts
100%
Tracy City
Yes
Fordtown West
100%
100%
48%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/07/2026- ETNG Pipeline Conditions for 6/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/08/2026
Notice End Date: 06/09/2026
Posting Date: 06/07/2026
Notice Identifier: 178868
Required Response Indicator Description: No response required

For Gas Day June 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Boyds Creek West
Yes
Fordtown West
100%
76%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/11/2026- ETNG Pipeline Conditions for 6/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/12/2026
Notice End Date: 06/13/2026
Posting Date: 06/11/2026
Notice Identifier: 179089
Required Response Indicator Description: No response required

For Gas Day June 12, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Gainsboro
100%
100%
100%
Planned Outage
Madisonville North
100%
100%
69%
Fordtown West
100%
100%
28%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/12/2026- ETNG Pipeline Conditions for 6/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/13/2026
Notice End Date: 06/14/2026
Posting Date: 06/12/2026
Notice Identifier: 179139
Required Response Indicator Description: No response required

For Gas Day June 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Gainsboro
100%
100%
100%
100%
Planned Outage
Madisonville North
100%
100%
36%
Fordtown West
100%
31%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/13/2026- ETNG Pipeline Conditions for 06/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/14/2026
Notice End Date: 06/15/2026
Posting Date: 06/13/2026
Notice Identifier: 179162
Required Response Indicator Description: No response required

For Gas Day June 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
100%
55%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/14/2026- ETNG Pipeline Conditions for 06/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/15/2026
Notice End Date: 06/16/2026
Posting Date: 06/14/2026
Notice Identifier: 179194
Required Response Indicator Description: No response required

For Gas Day June 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
100%
55%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/15/2026- ETNG Pipeline Conditions for 6/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/16/2026
Notice End Date: 06/17/2026
Posting Date: 06/15/2026
Notice Identifier: 179235
Required Response Indicator Description: No response required

For Gas Day June 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Clark Range
100%
100%
100%
100%
Planned Outage
Tracy City
100%
31%
Madisonville North
100%
62%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/16/2026- ETNG Pipeline Conditions for 6/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/17/2026
Notice End Date: 06/18/2026
Posting Date: 06/16/2026
Notice Identifier: 179271
Required Response Indicator Description: No response required

For Gas Day June 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Clark Range
100%
100%
100%
100%
Planned Outage
Tracy City
100%
30%
Madisonville North
100%
62%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/17/2026- ETNG Pipeline Conditions for 6/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/18/2026
Notice End Date: 06/19/2026
Posting Date: 06/17/2026
Notice Identifier: 179320
Required Response Indicator Description: No response required

For Gas Day June 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Clark Range
100%
100%
Planned Outage
Tracy City
100%
52%
Madisonville North
100%
47%
Fordtown West
100%
32%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/18/2026- ETNG Pipeline Conditions for 6/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/19/2026
Notice End Date: 06/20/2026
Posting Date: 06/18/2026
Notice Identifier: 179358
Required Response Indicator Description: No response required

For Gas Day June 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Clark Range
100%
100%
Planned Outage
Tracy City
100%
43%
Madisonville North
100%
57%
Fordtown West
100%
24%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/19/2026- ETNG Pipeline Conditions for 6/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/20/2026
Notice End Date: 06/21/2026
Posting Date: 06/19/2026
Notice Identifier: 179397
Required Response Indicator Description: No response required

For Gas Day June 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Clark Range
100%
100%
Planned Outage
Tracy City
100%
32%
Madisonville North
100%
56%
Fordtown West
100%
15%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/20/2026- ETNG Pipeline Conditions for 6/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/21/2026
Notice End Date: 06/22/2026
Posting Date: 06/20/2026
Notice Identifier: 179439
Required Response Indicator Description: No response required

For Gas Day June 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/21/2026- ETNG Pipeline Conditions for 6/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/22/2026
Notice End Date: 06/23/2026
Posting Date: 06/21/2026
Notice Identifier: 179472
Required Response Indicator Description: No response required

For Gas Day June 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Tracy City
100%
27%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/22/2026- ETNG Pipeline Conditions for 6/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/23/2026
Notice End Date: 06/24/2026
Posting Date: 06/22/2026
Notice Identifier: 179500
Required Response Indicator Description: No response required

For Gas Day June 23, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
100%
100%
44%
Tracy City
100%
43%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/23/2026- ETNG Pipeline Conditions for 06/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/24/2026
Notice End Date: 06/25/2026
Posting Date: 06/23/2026
Notice Identifier: 179537
Required Response Indicator Description: No response required

For Gas Day June 24, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Wartburg
100%
100%
100%
100%
Planned Outage
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
100%
100%
19%
Madisonville
Yes
Tracy City
100%
41%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/24/2026- ETNG Pipeline Conditions for 06/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/25/2026
Notice End Date: 06/26/2026
Posting Date: 06/24/2026
Notice Identifier: 179575
Required Response Indicator Description: No response required

For Gas Day June 25, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Wartburg
100%
100%
100%
100%
100%
Planned Outage
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
100%
100%
10%
Madisonville
Yes
Tracy City
100%
48%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/25/2026- ETNG Pipeline Conditions for 6/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/26/2026
Notice End Date: 06/27/2026
Posting Date: 06/25/2026
Notice Identifier: 179629
Required Response Indicator Description: No response required

For Gas Day June 26, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Wartburg
100%
100%
Planned Outage
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
100%
75%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/26/2026- ETNG Pipeline Conditions for 06/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/27/2026
Notice End Date: 06/28/2026
Posting Date: 06/26/2026
Notice Identifier: 179676
Required Response Indicator Description: No response required

For Gas Day June 27, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Wartburg
100%
100%
100%
100%
Planned Outage
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/28/2026- ETNG Pipeline Conditions for 6/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/29/2026
Notice End Date: 06/30/2026
Posting Date: 06/28/2026
Notice Identifier: 179745
Required Response Indicator Description: No response required

For Gas Day June 29, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/27/2026- ETNG Pipeline Conditions for 6/28/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 6/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/28/2026
Notice End Date: 06/29/2026
Posting Date: 06/27/2026
Notice Identifier: 179713
Required Response Indicator Description: No response required

For Gas Day June 28, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Wartburg
100%
100%
100%
100%
Planned Outage
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/29/2026- ETNG Operational Flow Order -- EFF 7/1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Operational Flow Order -- EFF 7/1
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/01/2026
Notice End Date: 09/27/2026
Posting Date: 06/29/2026
Notice Identifier: 179772
Required Response Indicator Description: No response required

Operational Areas
Gas Day June 29 and June 30
Gas Day July 1 until further notice
System Wide
No OFO
OFO in Effect : No Due Pipe 10%/500
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO
MAD
No MAD
No MAD
East Tennessee Natural Gas

06/29/2026- ETNG Pipeline Conditions for 06/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 06/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 06/30/2026
Notice End Date: 07/01/2026
Posting Date: 06/29/2026
Notice Identifier: 179802
Required Response Indicator Description: No response required

For Gas Day June 30, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

06/30/2026- ETNG Pipeline Conditions for 07/01/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/01/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/01/2026
Notice End Date: 07/02/2026
Posting Date: 06/30/2026
Notice Identifier: 179844
Required Response Indicator Description: No response required

For Gas Day July 1, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
100%
23%
OFO / Imbalance Notice
OFO
'No DP - System Wide effective 7/1/26. 500 Dth / 10% Tolerance
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/01/2026- ETNG Pipeline Conditions for 07/02/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/02/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/02/2026
Notice End Date: 07/03/2026
Posting Date: 07/01/2026
Notice Identifier: 179887
Required Response Indicator Description: No response required

For Gas Day July 2, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Boyds Creek West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
'No DP - System Wide effective 7/1/26. 500 Dth / 10% Tolerance
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/02/2026- ETNG Pipeline Conditions for 7/3/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/3/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/03/2026
Notice End Date: 07/04/2026
Posting Date: 07/02/2026
Notice Identifier: 179942
Required Response Indicator Description: No response required

For Gas Day July 3, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/03/2026- ETNG Pipeline Conditions for 7/4/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/4/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/04/2026
Notice End Date: 07/05/2026
Posting Date: 07/03/2026
Notice Identifier: 179971
Required Response Indicator Description: No response required

For Gas Day July 4, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/04/2026- ETNG Pipeline Conditions for 7/5/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/5/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/05/2026
Notice End Date: 07/06/2026
Posting Date: 07/04/2026
Notice Identifier: 180001
Required Response Indicator Description: No response required

For Gas Day July 5, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/05/2026- ETNG Pipeline Conditions for 7/6/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/6/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/06/2026
Notice End Date: 07/07/2026
Posting Date: 07/05/2026
Notice Identifier: 180034
Required Response Indicator Description: No response required

For Gas Day July 6, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/06/2026- ETNG Pipeline Conditions for 7/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/07/2026
Notice End Date: 07/08/2026
Posting Date: 07/06/2026
Notice Identifier: 180067
Required Response Indicator Description: No response required

For Gas Day July 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/07/2026- ETNG Pipeline Conditions for 7/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/08/2026
Notice End Date: 07/09/2026
Posting Date: 07/07/2026
Notice Identifier: 180111
Required Response Indicator Description: No response required

For Gas Day July 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/08/2026- ETNG Pipeline Conditions for 07/09/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/09/2026
Notice End Date: 07/10/2026
Posting Date: 07/08/2026
Notice Identifier: 180200
Required Response Indicator Description: No response required

For Gas Day July 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/09/2026- ETNG Action Alert -- EFF 7/11

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 7/11
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/13/2026
Posting Date: 07/09/2026
Notice Identifier: 180224
Required Response Indicator Description: No response required

Operational Areas
Gas Day July 9 - July 10
Gas Day July 11 - July 13
Gas Day July 14 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO/No Action Alert
East Tennessee Natural Gas

07/09/2026- ETNG Pipeline Conditions for 07/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/10/2026
Notice End Date: 07/11/2026
Posting Date: 07/09/2026
Notice Identifier: 180236
Required Response Indicator Description: No response required

For Gas Day July 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/10/2026- ETNG Pipeline Conditions for 07/11/2026 -- CORRECTION

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/11/2026 -- CORRECTION
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180308
Prior Notice Identifier: 180278
Required Response Indicator Description: No response required

For Gas Day July 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/10/2026- ETNG Pipeline Conditions for 07/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/11/2026
Notice End Date: 07/12/2026
Posting Date: 07/10/2026
Notice Identifier: 180278
Required Response Indicator Description: No response required

For Gas Day July 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DP - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/14/2026- ETNG Pipeline Conditions for 07/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/15/2026
Notice End Date: 07/16/2026
Posting Date: 07/14/2026
Notice Identifier: 180441
Required Response Indicator Description: No response required

For Gas Day July 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/13/2026- ETNG Pipeline Conditions for 07/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/14/2026
Notice End Date: 07/15/2026
Posting Date: 07/13/2026
Notice Identifier: 180399
Required Response Indicator Description: No response required

For Gas Day July 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/15/2026- ETNG Pipeline Conditions for 07/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/16/2026
Notice End Date: 07/17/2026
Posting Date: 07/15/2026
Notice Identifier: 180473
Required Response Indicator Description: No response required

For Gas Day July 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/16/2026- ETNG Pipeline Conditions for 07/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/17/2026
Notice End Date: 07/18/2026
Posting Date: 07/16/2026
Notice Identifier: 180519
Required Response Indicator Description: No response required

For Gas Day July 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
100%
100%
Planned Outage
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/17/2026- ETNG Pipeline Conditions for 7/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/18/2026
Notice End Date: 07/19/2026
Posting Date: 07/17/2026
Notice Identifier: 180586
Required Response Indicator Description: No response required

For Gas Day July 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/18/2026- ETNG Pipeline Conditions for 7/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/19/2026
Notice End Date: 07/20/2026
Posting Date: 07/18/2026
Notice Identifier: 180614
Required Response Indicator Description: No response required

For Gas Day July 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/19/2026- ETNG Pipeline Conditions for 7/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/20/2026
Notice End Date: 07/21/2026
Posting Date: 07/19/2026
Notice Identifier: 180644
Required Response Indicator Description: No response required

For Gas Day July 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/20/2026- ETNG Pipeline Conditions for 07/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 07/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/21/2026
Notice End Date: 07/22/2026
Posting Date: 07/20/2026
Notice Identifier: 180664
Required Response Indicator Description: No response required

For Gas Day July 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/21/2026- ETNG Pipeline Conditions for 7/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/22/2026
Notice End Date: 07/23/2026
Posting Date: 07/21/2026
Notice Identifier: 180698
Required Response Indicator Description: No response required

For Gas Day July 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/06/2026- ETNG Action Alert -- LIFTED EFF 4/6

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/6
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176163
Prior Notice Identifier: 175998
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 5
Gas Day April 6 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
MAD
No MAD
No MAD*
East Tennessee Natural Gas

04/21/2026- ETNG Action Alert -- LIFTED EFF 4/21

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/21
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/21/2026
Notice End Date: 07/20/2026
Posting Date: 04/21/2026
Notice Identifier: 176873
Prior Notice Identifier: 176722
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 20
Gas Day April 21 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO or Action Alert*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
East Tennessee Natural Gas

04/27/2026- ETNG Action Alert -- LIFTED EFF 4/27

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/27
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/27/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177126
Prior Notice Identifier: 176953
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 26
Gas Day April 27 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO or Action Alert*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
East Tennessee Natural Gas

05/14/2026- ETNG Action Alert -- EFF 5/16

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 5/16
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/16/2026
Notice End Date: 05/18/2026
Posting Date: 05/14/2026
Notice Identifier: 177915
Required Response Indicator Description: No response required

Operational Areas
Gas Day May 14 - May 15
Gas Day May 16 - May 17
Gas Day May 18 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO/No Action Alert
East Tennessee Natural Gas

05/17/2026- ETNG Pipeline Conditions for 5/18/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/18/2026
Notice End Date: 05/19/2026
Posting Date: 05/17/2026
Notice Identifier: 178044
Required Response Indicator Description: No response required

For Gas Day May 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/21/2026- ETNG Pipeline Conditions for 05/22/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/22/2026
Notice End Date: 05/23/2026
Posting Date: 05/21/2026
Notice Identifier: 178198
Required Response Indicator Description: No response required

For Gas Day May 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/20/2026- ETNG Pipeline Conditions for 05/21/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 05/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/21/2026
Notice End Date: 05/22/2026
Posting Date: 05/20/2026
Notice Identifier: 178155
Required Response Indicator Description: No response required

For Gas Day May 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

05/27/2026- ETNG Pipeline Conditions for 5/28/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 5/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 05/28/2026
Notice End Date: 05/29/2026
Posting Date: 05/27/2026
Notice Identifier: 178428
Required Response Indicator Description: No response required

For Gas Day May 28, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyds Creek West
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 5/28/26. 500 Dth / 8% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/02/2026- ETNG Operational Flow Order -- LIFTED EFF 7/3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Operational Flow Order -- LIFTED EFF 7/3
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 07/03/2026
Notice End Date: 09/30/2026
Posting Date: 07/02/2026
Notice Identifier: 179926
Prior Notice Identifier: 179772
Required Response Indicator Description: No response required

Operational Areas
Gas Day July 2
Gas Day July 3 and until further notice
System Wide
OFO in Effect : No Due Pipe 10%/500
No OFO
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO
MAD
No MAD
No MAD
East Tennessee Natural Gas

07/12/2026- ETNG Pipeline Conditions for 7/13/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 7/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 07/13/2026
Notice End Date: 07/14/2026
Posting Date: 07/12/2026
Notice Identifier: 180357
Required Response Indicator Description: No response required

For Gas Day July 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide effective 7/11/26. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

07/11/2026- ETNG Pipeline Conditions for 7/12/2026

UNSCORED
Informational
View original notice text
07/11/2026- ETNG Pipeline Conditions for 7/12/2026