Sabine Pass LNG

4 active notices

Showing 4 notices
Sabine Pass LNG

CTPL 2026 Planned Outage and Maintenance Summary – Updated 08.13.26

SEV 3/5
Maintenance 0.130 Bcf/d Until Further Notice 4 Days

This is Revision 2 of CTPL's 2026 Q3 planned outage and maintenance summary for Creole Trail Pipeline serving Sabine Pass LNG. The most impactful single job is Job 2026111: Gillis Compressor Station compressor maintenance running 8/25/2026 3:00 a.m. through 8/28/2026 6:00 p.m. (4 days, Gas Days 24-28), with a stated transport impact of 130,000 Dths/day (0.130 Bcf/d) against an available capacity of 1,400,000 Dths/day. The two updated Job 2026113 entries (LEAP Meter Station filter changeouts on 9/8 and 9/9, 9 hours each) show zero transport impact and a meter capacity limit of 475,000 Dths/day at CT109461. Job 2026112 (LEAP Meter Station upgrades 9/29-10/2, 4 days) also shows zero transport impact.

The dominant job in this posting removes 0.130 Bcf/d of CTPL feedgas transport capacity to Sabine Pass LNG for 4 days beginning 8/25/2026; expect mild bearish pressure at Henry Hub as that volume stays in the domestic market, with the CT200111-CREOLE TRAIL-SPLIQ-D delivery point currently running at 88.4% utilization (1.50 Bcf/d scheduled against 1.70 Bcf/d operating capacity), leaving roughly 0.197 Bcf/d of headroom that partially absorbs the constraint.
Reroute: None: CTPL is the dedicated pipeline serving Sabine Pass LNG, and the constraint reduces feedgas transport capacity directly to the terminal with no bypass route available for the curtailed volumes.
View original notice text
Facility: Sabine Pass LNG
Notice ID: 1975
Notice Type: Planned Service Outage
Status: Active
Title: CTPL 2026 Planned Outage and Maintenance Summary – Updated 08.13.26
Effective Date/Time: 2026-08-13T12:05:00
End Date/Time: 2026-09-30T00:00:00
Posted: 2026-08-13T12:21:14
Note: Effective/End Date above is the posting's overall coverage window, NOT necessarily one continuous outage -- see Notice Text and/or the embedded image below for the actual per-job schedule.

Notice Text:
Below is a summary of the CTPL 2026 Planned Outage and Maintenance Projects.   Items marked with * denotes updates from previous posting.   This notice reflects current information as of August 13, 2026. This summary is subject to change as the year progresses to reflect the updated status of all planned outages and maintenance projects. CTPL will post updates as they become available. If you have any questions, please contact Customer Services at 713-375-5900 or email Cheniere.CTPL@Cheniere.com .

[EMBEDDED_IMAGE: notice_images/00001975_1.png]
The image above contains this notice's detailed schedule table (fields commonly include Job No., Begin/End dates, Location, Maintenance type, Transport Impact, Available Capacity, and Meter Capacity Limit). This table is NOT present anywhere in this notice as text -- Cheniere delivers it as a picture to every visitor of the page, not just to automated scrapers. Do not treat the Effective/End Date range above as a single continuous outage window: a 'Planned Outage and Maintenance Summary' notice like this one commonly bundles several independent jobs with different dates, locations, and impacts (including some with zero transport impact) into one posting. Read the table in the image directly for accurate per-job dates and capacity figures rather than inferring them from the date range alone.
Sabine Pass LNG

CTPL Quorum Database Interruption – RESOLVED – 8.3.2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Facility: Sabine Pass LNG
Notice ID: 1967
Notice Type: Computer System Status
Status: Active
Title: CTPL Quorum Database Interruption – RESOLVED – 8.3.2026
Effective Date/Time: 2026-08-03T14:09:00
End Date/Time: 2026-11-03T00:00:00
Posted: 2026-08-03T14:10:31.227
Note: Effective/End Date above is the posting's overall coverage window, NOT necessarily one continuous outage -- see Notice Text and/or the embedded image below for the actual per-job schedule.

Notice Text:
CTPL has resolved the interruption with the Quorum Database.   All data has been updated and allocated. If you have any questions, please contact Customer Services at 713-375-5900 or email  Cheniere.CTPL@Cheniere.com  with any questions.
Sabine Pass LNG

Quorum Database Interruption - August 2, 2025

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Facility: Sabine Pass LNG
Notice ID: 1965
Notice Type: Computer System Status
Status: Active
Title: Quorum Database Interruption - August 2, 2025
Effective Date/Time: 2026-08-02T12:34:00
End Date/Time: 2026-09-30T00:00:00
Posted: 2026-08-02T12:37:19.897
Note: Effective/End Date above is the posting's overall coverage window, NOT necessarily one continuous outage -- see Notice Text and/or the embedded image below for the actual per-job schedule.

Notice Text:
CTPL reports that our Quorum database did experience an interruption.   We are currently working to resolve the issue.   In the meantime, Intraday notices may be delayed.   As well as any changes made to the Customer Activities Website during this outage may not take effect. We apologize for any inconvenience this may cause you.   Please contact Customer Services at 713-375-5900 or email Cheniere.CTPL@Cheniere.com for immediate needs.
Sabine Pass LNG

CTPL Job #2026111 – Gillis Compressor Maintenance – COMPLETED 8.28.26

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Facility: Sabine Pass LNG
Notice ID: 1979
Notice Type: Planned Service Outage
Status: Revision / Supersedes Prior Notice
Title: CTPL Job #2026111 – Gillis Compressor Maintenance – COMPLETED 8.28.26
Effective Date/Time: 2026-08-28T07:57:00
End Date/Time: 2026-11-28T00:00:00
Posted: 2026-08-28T08:00:47.433
Note: Effective/End Date above is the posting's overall coverage window, NOT necessarily one continuous outage -- see Notice Text and/or the embedded image below for the actual per-job schedule.

Notice Text:
Effective immediately, the COMPRESSOR MAINTENENACE at the GILLIS COMPRESSOR STATION that began on 8/25/2026 has been completed and the station is back in-service at full pipeline capacity.        If you have any questions, please contact Customer Services at 713-375-5900 or email Cheniere.CTPL@Cheniere.com .
This notice supersedes a prior filing. Treat as a revision; check for escalation triggers vs prior notice.