Iroquois Gas Transmission has declared an Operational Flow Order (OFO) effective February 23rd gas day, valid until further notice, for all points south of MLV-12. The OFO is driven by expected high volumes and forecasted weather conditions, requiring all point operators to adhere strictly to scheduled volumes to maintain pipeline pressures; OBA gas is suspended and Flow Control may be activated. No end date has been specified, introducing sustained supply risk for New York and New England markets downstream of the affected segment.
Iroquois OFO south of MLV-12 with no restoration timeline tightens deliveries into New York and New England; Iroquois Zone 2 basis was -0.140 vs Henry Hub on 2026-08-27 (five-day average -0.190), and this open-ended OFO with weather-driven demand pressure is bullish for Zone 2 and Algonquin Citygate -- expect basis to widen further as unscheduled flexibility is eliminated and power plant burn nominations are constrained.
Reroute: Limited to none: Algonquin Gas Transmission provides partial alternative supply into New England and New York markets, but Algonquin and Iroquois are the two dominant pipes serving these markets and Algonquin is frequently simultaneously constrained during high-demand weather events, leaving minimal reroute headroom for volumes south of MLV-12.
View original notice text
Operational Flow Order (OFO) Pursuant to General Terms and Conditions, Section 38, of Iroquois’ FERC Gas Tariff, effective Monday, February 23rd Gas Day, an Iroquois Operational Flow Order (OFO) is in effect, until further notice, for all points: • South of MLV-12 Due to expected high volumes and forecasted weather conditions, Iroquois is requiring all point operators in the affected area to adhere to their scheduled volumes to maintain pipeline pressures necessary for operations. No due unscheduled shipper gas (OBA) will be available. Operators are required to operate within tariff guidelines. Flow Control will be implemented and activated if necessary. Iroquois reminds all operators and agents of directly connected power plants of the related parameters as set forth by FERC Order 698. Iroquois requires all directly connected power plant operators to submit burn profiles and nominations prior to gas flow. Flexibility on burn rates is limited, and power plant operators are urged to burn ratably based on scheduled volumes. If you have any further questions, please contact your account representative or Gas Control. End date: Until Further Notice.
Iroquois Gas Transmission
Operational Flow Order
SEV 4/5
Operational AlertUntil Further Notice
Iroquois Gas Transmission has declared an Operational Flow Order (OFO) effective January 15 gas day, in effect until further notice, for all points south of MLV-12, citing expected high volumes and adverse weather. All point operators must adhere strictly to scheduled volumes to maintain pipeline pressure; no unscheduled OBA gas is available, and Flow Control will be activated if necessary. The OFO has no stated end date and directly restricts flexibility for power plants and distribution customers in the New York and southern New England service area.
Iroquois OFO south of MLV-12 with no restoration timeline restricts delivery flexibility into the NYC metro and southern New England market; Iroquois Zone 2 basis has been running at -0.140 vs Henry Hub as of 2026-08-27 but expect significant bullish pressure on Zone 2 and Algonquin Citygate as the OFO tightens operational flexibility during a high-demand weather event with zero unscheduled gas available.
Reroute: Limited to none: Algonquin Gas Transmission serves overlapping southern New England and Connecticut markets, but if Algonquin is simultaneously stressed during the same weather event, there is effectively no reroute for affected Iroquois delivery points south of MLV-12, including Long Island and NYC metro customers.
View original notice text
Operational Flow Order (OFO) Pursuant to General Terms and Conditions, Section 38, of Iroquois’ FERC Gas Tariff, effective Thursday, January 15th Gas Day, an Iroquois Operational Flow Order (OFO) is in effect, until further notice, for all points: • South of MLV-12 Due to expected high volumes and forecasted weather conditions, Iroquois is requiring all point operators in the affected area to adhere to their scheduled volumes to maintain pipeline pressures necessary for operations. No due unscheduled shipper gas (OBA) will be available. Operators are required to operate within tariff guidelines. Flow Control will be implemented and activated if necessary. Iroquois reminds all operators and agents of directly connected power plants of the related parameters as set forth by FERC Order 698. Iroquois requires all directly connected power plant operators to submit burn profiles and nominations prior to gas flow. Flexibility on burn rates is limited, and power plant operators are urged to burn ratably based on scheduled volumes. If you have any further questions, please contact your account representative or Gas Control. End date: Until Further Notice.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 5, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/06/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 4, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 91%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/05/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day August 03, 2026, Iroquois nominations are at capacity and sealed from all increases for the following meter: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 92%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 08/04/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day August 02, 2026, Iroquois nominations are at capacity and sealed from all increases for the following meter: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 08/03/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 1, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/02/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 31, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/01/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 30, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/31/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 29, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/30/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 28, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/29/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 27, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/28/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 26, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/27/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 25, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/26/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 24, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/25/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 23, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/24/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 22, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/23/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 21, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/22/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 20, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/21/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 19, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/20/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 18, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/19/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 17, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/18/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 14, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/15/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 12, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 96%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/13/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 12, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 96%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/13/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 12, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 97%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/13/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day August 13, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100%, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 98%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 08/14/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 14, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/15/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 11, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 96%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/12/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 10, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 95%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/11/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 09, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 97%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/10/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 08, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 92%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/09/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day July 07, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 91%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/08/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day July 6, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100%, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 94%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 07/07/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
EMERGENT REPAIR AT DOVER COMPRESSOR STATION– Iroquois is posting notice of an emergent repair at the Dover Compressor Station. A mechanical problem has been encountered with the Dover Compressor, and the unit is currently offline and unavailable. Personnel are actively investigating and additional updates will be posted as more information becomes available. If you have any further questions, please contact your account representative or Gas Control. End date 7/9/26 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 30, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 07/01/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 29, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/30/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 28, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/29/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 27, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/28/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 26, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100%, and Secondary receipt nominations are reduced by 98% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/27/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 25, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/26/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 24, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/25/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 15, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/16/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day August 16, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 08/17/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day August 17, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 08/18/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 18, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/19/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 19, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/20/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 20, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/21/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 21, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/22/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 23, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/24/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 22, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/23/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 21, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/22/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 20, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/21/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 19, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/20/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 18, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/19/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 17, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/18/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 16, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations are reduced by 94% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/17/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 15, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100%, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 90%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/16/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 14, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100%, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 90%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/15/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 13, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations are reduced by 90% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/14/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 12, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/13/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 11, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/12/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 10, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/11/2026 09:00 AM CCT
Iroquois Gas Transmission
Operational Flow Order
SEV 3/5
Operational AlertUntil Further Notice
Iroquois Gas Transmission has issued a system-wide Operational Flow Order (OFO) effective Gas Day June 10, 2026, due to high linepack conditions, requiring all point operators and shippers to ensure actual deliveries out of the system equal or exceed scheduled deliveries. The OFO remains in effect until further notice with no stated restoration timeline. Capacity data from August 20, 2026 (one day prior to this posting, and more than two months after the OFO effective date) shows Brookfield at 95.2% utilization with only 4.8% headroom and Canajoharie fully subscribed at 100%, consistent with a congested system, though the summer-period readings may not reflect conditions at the June 10 onset.
Iroquois system-wide OFO for high linepack is supply-bearish for New York/New England near-term basis -- Iroquois Zone 2 basis has most recently printed at -0.230 vs Henry Hub (2026-08-20), weaker than the trailing 5-day average of -0.148, suggesting the OFO and associated delivery pressure are already reflected in regional pricing; no specific capacity volume stated.
Reroute: Limited to none for core New York and New England deliveries -- Algonquin Gas Transmission serves overlapping New England markets but is often simultaneously constrained; a high-linepack OFO on Iroquois with no stated end date limits the ability to redirect volumes without exacerbating downstream congestion.
View original notice text
Operational Flow Order (OFO) – Balanced Actual Deliveries Pursuant to Section 38 of the General Terms and Conditions of Iroquois’ FERC Gas Tariff, an Operational Flow Order (OFO) is in effect beginning Gas Day Wednesday, June 10, 2026. Affected Area System-wide (all points). Affected Parties All point operators and shippers. Reason for OFO To maintain system operational integrity under high linepack conditions, Iroquois is issuing this Operational Flow Order (OFO) to all affected parties. Required Actions During the duration of this OFO, all parties must ensure that actual gas deliveries out of the system are equal to or greater than their scheduled deliveries. Shippers are expected to actively monitor their positions throughout the gas day and take any necessary corrective actions to remain in balance. Failure to comply with these requirements may result in further action by the pipeline. Iroquois also reminds all operators and agents of directly connected power plants of the requirements outlined in FERC Order 698. All directly connected power plant operators must submit burn profiles and nominations prior to gas flow. Operational flexibility is limited; therefore, operators are strongly encouraged to maintain ratable burn rates consistent with scheduled volumes. Additional Information This OFO will remain in effect until further notice. A termination notice will be issued once system conditions improve and high linepack conditions are resolved. For questions or additional information, please contact your account representative or Gas Control. End date Until Further Notice
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 09, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/10/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 08, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/09/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 07, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/08/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day June 06, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 06/06/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 5, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/06/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 4, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/05/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 3, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/04/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 22, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/23/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 23, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/24/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 24, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/25/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 25, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/26/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 26, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/27/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day May 30, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 05/31/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Operational Flow Order (OFO) – Balanced Actual Deliveries Pursuant to Section 38 of the General Terms and Conditions of Iroquois’ FERC Gas Tariff, an Operational Flow Order (OFO) is in effect beginning Gas Day Wednesday, April 29, 2026. Affected Area System-wide (all points). Affected Parties All point operators and shippers. Reason for OFO To maintain system operational integrity under high linepack conditions, Iroquois is issuing this Operational Flow Order (OFO) to all affected parties. Required Actions During the duration of this OFO, all parties must ensure that actual gas deliveries out of the system are equal to or greater than their scheduled deliveries. Shippers are expected to actively monitor their positions throughout the gas day and take any necessary corrective actions to remain in balance. Failure to comply with these requirements may result in further action by the pipeline. Iroquois also reminds all operators and agents of directly connected power plants of the requirements outlined in FERC Order 698. All directly connected power plant operators must submit burn profiles and nominations prior to gas flow. Operational flexibility is limited; therefore, operators are strongly encouraged to maintain ratable burn rates consistent with scheduled volumes. Additional Information This OFO will remain in effect until further notice. A termination notice will be issued once system conditions improve and high linepack conditions are resolved. For questions or additional information, please contact your account representative or Gas Control. End date Until Further Notice
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day September 8, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park and Interruptible receipt nominations at the Brookfield Interconnect are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 95%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 09/09/2026 09:00 CCT
Iroquois Gas Transmission
EMERGENT REPAIR AT DOVER COMPRESSOR STATION – COMPLETE - (Update to Notice ID 7317)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
EMERGENT REPAIR AT DOVER COMPRESSOR STATION – COMPLETE - (Update to Notice ID 7317) Iroquois hereby provides an update to the Emergent Repair at Dover Compressor Station. Repairs have been completed and the unit is now on line. If you have any further questions please contact Gas Control or your account representative. End date 07/02/2026 19:30 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
EMERGENT REPAIR AT DOVER COMPRESSOR STATION – (Update to Notice ID 7317) Iroquois hereby provides the following update regarding the emergent repair at the Dover Compressor Station. Additional resources are on site at the facility and troubleshooting efforts are underway. At this time no effect to Gas Day 2 scheduled volumes are anticipated. Further updates will be provided as they become available. If you have any further questions, please contact your account representative or Gas Control. End date 07/09/2026 09:00 CCT
Iroquois Gas Transmission
Operational Flow Order Lifted (Update to Notice 7287)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Operational Flow Order - Balanced Actual Deliveries Lifted Effective Gas Day June 12, 2026, 09:00am (CCT), Iroquois will be lifting the Operational Flow Order (OFO), Notice ID 7287, which was in effect from Gas Day June 10, 2026 through Until Further Notice, affecting the following points: - System Wide (all points) Iroquois will continue to monitor nominations and reserves the ability to restrict if necessary. Please contact your account representative or Gas Control for further information. End date 6/12/2026 09:00 am (CCT)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 27, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/28/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 28, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/29/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 2, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/03/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day June 1, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/02/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day May 31, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 06/01/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day May 29, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 05/30/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 29, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/30/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 30, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 08/31/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day August 31, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/01/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 1, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/02/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 2, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/03/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 3, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/04/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 4, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/05/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 5, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/06/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day September 6, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 09/07/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day September 7, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 09/08/2026 09:00 CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day September 9, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible and Secondary receipt nominations are reduced by 100%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 09/10/2026 09:00 AM CCT
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Effective Timely Cycle, Gas Day September 10, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Park, Interruptible and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 09/11/2026 09:00 CCT
Iroquois Gas Transmission
Operational Flow Order Lifted (Update to Notice ID 7237)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Critical Notice Operational Flow Order - Balanced Actual Deliveries Lifted Effective Gas Day June 1, 2026, 09:00am (CCT), Iroquois will be lifting the Operational Flow Order (OFO), Notice ID 7237, which was in effect from Gas Day April 29, 2026, through Until Further Notice, affecting the following points: - System Wide (all points) Iroquois will continue to monitor nominations and reserves the ability to restrict if necessary. Please contact your account representative or Gas Control for further information. End date 6/1/2026 09:00 am (CCT)