All
Force Majeure
Maintenance
Capacity
Compressor
Sev 4–5 Only
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned Index 129 Pipeline Maintenane
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 3/5
Maintenance
0.770 Bcf/d
Until Further Notice
11 Days
Gulf South Pipeline is performing planned maintenance on the Index 129 Pipeline from May 10 to May 21, 2026. North-to-south capacity on the West 30 segment (Goodrich to South Texas deliveries) will be reduced by up to 0.770 Bcf/d, with south-to-north capacity through Goodrich compressor station impacted by up to 0.180 Bcf/d. The maintenance has the potential to affect all service classes including Primary Firm Service, with specific shut-ins at Loc 12780 (Teco Polk County - Enterprise) and 12 CenterPoint Farm Taps.
Gulf South planned maintenance removes up to 0.770 Bcf/d of north-to-south capacity on the West 30 segment for 11 days starting May 10; watch for basis widening at Transco Zone 4 and Henry Hub versus Southeast delivery points, with Primary Firm Service at risk creating potential for physical tightness in the South Texas corridor.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping Gulf Coast and Southeast markets and may absorb some displaced volumes, but the 0.770 Bcf/d magnitude of the north-to-south restriction and simultaneous southbound and northbound impacts may limit full offset, particularly for South Texas delivery points.
Gulf South Pipeline
Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3263, Loc 20709, Loc 9153, Loc 3011
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Pipeline Incident Impacting Service
SEV 3/5
Operational Alert
Until Further Notice
Gulf South Pipeline detected a gas release on Line 266-L in Jackson and Ouachita parishes, northern Louisiana at approximately 9:30 PM on May 14, 2026, prompting an immediate line shutdown and temporary residential evacuations. The affected section will remain offline until repairs are complete and all safety and regulatory requirements are satisfied, with no restoration timeline provided. Locations Townsend #1 Well (Loc 21228) and one ATMOS Farm Tap have been scheduled to zero effective May 15, 2026.
Unplanned pipeline incident on Gulf South Line 266-L removes an indeterminate volume of northern Louisiana supply with no restoration timeline, applying mild bullish pressure at Henry Hub and Transco Zone 4 Southeast basis; no specific capacity figure disclosed so market impact is primarily sentiment-driven until further updates quantify the outage.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets, providing partial alternatives for affected shippers, though the specific receipt-point scheduling zeros at Townsend #1 Well and the ATMOS Farm Tap limit the volumes that can be physically rerouted.
Gulf South Pipeline
Index 266-L Pipeline Incident
SEV 3/5
Force Majeure
Until Further Notice
On May 14, 2026 at approximately 9:30 PM, Gulf South Pipeline detected a gas release on Line 266-L in Jackson and Ouachita parishes, northern Louisiana, and immediately shut down the affected section. Multiple well locations and one ATMOS farm tap are scheduled to zero with no restoration timeline -- repairs must be completed and safety/regulatory requirements met before the line returns to service. This is a Revision 1 supersede notice referencing Prior Notice 5038138, confirming the event is ongoing.
Unplanned pipeline incident on Gulf South Line 266-L removes multiple northern Louisiana Haynesville-area receipt locations from service with no restoration date; no specific volume stated but supply curtailment is mildly bullish for Henry Hub and Transco Zone 4 basis until repairs are complete.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets from the Louisiana production area, but the specific well and farm tap receipts zeroed on Line 266-L are tied directly to this gathering segment and cannot be rerouted without alternative gathering connectivity at the wellhead level.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery (Citgo)
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned: Index 129 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 59-22 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 03/27/2026 - 04/02/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 287-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 301-6 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 819-2 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 04/03/2026 - 04/09/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 818 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Arnaudville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 130 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Index 301-8-11-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Unplanned Index 129 Pipeline Maintenane
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Revised: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 192 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Marksville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 59-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 70 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 70-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 70-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 270-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Olla Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 129-20 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update:Index 70-6 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update:Index 70-7 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 04/10/2026 - 04/16/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 46 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 70-4 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 819-2 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Petal Compressor and Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 04/17/2026 - 04/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
White Oak Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/01/2026- 05/07/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 249-1 Pipeline Maintanence
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Bistineau Compressor & Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
2026 Projected Outages Overview
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 205 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 04/24/2026 - 04/30/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/01/2026- 05/07/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 387 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Ch
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Ch
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 130 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to take confirmed quantities Loc 3011, Loc 20709, Loc 9153
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 287 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge.
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9311 Westlake: Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/08/2026- 05/14/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 266 & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Clarence Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 266L & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/15/2026- 05/21/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge.
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery (Citgo)
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 818 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 266L & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 20862
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 266-L Pipeline Incident
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for 5/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 21738
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/22/2026- 05/28/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/29/2026- 06/04/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Index 70-15 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Update: Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Posted Maintenance Events for 05/29/2026- 06/04/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
Black Creek Compressor Station Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
GasQuest and Informational Postings – URL Updates
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
The ID2 Scheduled Quantities Posting Delayed 5/26/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for 6/2/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.