Northwest Pipeline

Caldwell CS – Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Caldwell CS – Unplanned Maintenance
Notice ID: 32759

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-046

Caldwell CS – Unplanned Maintenance

 posted on
 
Apr 13 2026 8:49AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 04/13/2026 8:45 AM MCT
Notice Eff D/T: 04/13/2026 8:45 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-046
Prior Notice: 
Subject: Caldwell CS – Unplanned Maintenance

Notice Text:

Northwest is experiencing unplanned maintenance at Caldwell 
Unit 4, located at MP 849.8 in Gem County, Idaho. Initial 
assessments indicate this is expected to result in an extended 
outage, with an estimated duration of 60 to 90 days to 
complete the required repairs.
Northwest is doing everything possible to complete the work as 
quickly and safely as possible to bring in this timeline. We 
will provide updates on our EBB as additional information 
becomes available. 
Effective Gas Day Tuesday, April 14, 2026, the available 
capacity at the Caldwell Compressor Station will be limited to 
438,000 Dth/d northbound and 439,000 Dth/d southbound. 
If primary nomination requests through the Caldwell CS exceeds 
the available capacity of 438,000 Dth/d northbound or 439,000 
Dth/d southbound (or whatever NWP cannot mitigate during any 
day of the maintenance), pursuant to Sections 10.2 and 10.3 of 
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give 
notice of a Declared Deficiency Period based on a design 
capacity of 452,000 Dth/d northbound or 475,000 Dth/d 
southbound. The deficiency period will continue until the work 
has been completed. 
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Unplanned maintenance at Jackston Prairie and declared Entitlement

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Unplanned maintenance at Jackston Prairie and declared Entitlement
Notice ID: 32689

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-038

Unplanned maintenance at Jackston Prairie and declared Entitlement

 posted on
 
Mar 12 2026 8:59AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 03/12/2026 8:54 AM MCT
Notice Eff D/T: 03/12/2026 8:54 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-038
Prior Notice: 
Subject: Unplanned maintenance at Jackston Prairie and declared Entitlement

Notice Text:

 
Puget Sound Energy (PSE), operator of Jackson Prairie (JP)
storage facility, has notified Northwest of a malfunctioning
component at JP Storage currently preventing injection
capability. PSE is actively working to source the part and
safely bring the facility back to full operational capacity.
Northwest will accept injection nominations at JP only to the
extent such injections can be netted against corresponding
withdrawal nominations.
 
Because system flexibility will be limited, Northwest is
declaring a Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station
beginning Gas Day Saturday, March 14, 2026. 
 
Please remain diligent in managing supply and demand and avoid
banking the system. On system balancing on Northwest’s
Electronic Bulletin Board is currently designated as “No” for
all areas.
 
Northwest would like to thank the customers in advance for
their cooperation. We will provide further updates as more
information becomes available.
  
 
 
 
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Northwest Pipeline

Meacham Notice of Recall and OFO

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham Notice of Recall and OFO
Notice ID: 32657

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-026

Meacham Notice of Recall and OFO

 posted on
 
Feb 17 2026 3:46PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/17/2026 3:46 PM MCT
Notice Eff D/T: 02/17/2026 3:46 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-026
Prior Notice: 
Subject: Meacham Notice of Recall and OFO

Notice Text:

Effective Gas Day Thursday, February 19, 2026 and until further 
notice, Northwest is issuing an OFO Recall Advisory and 
Operational Flow Order (OFO) through the Meacham compressor 
pursuant to Section 14.15(d) of its Tariff. 
Under the OFO Recall Advisory, Shippers are required to: (1) 
recall capacity that is subject to an OFO recall provision; or 
(2) take other action that is acceptable to Northwest, to 
satisfy its OFO obligation.
If the southbound scheduled quantities exceed the greater of 
Northwest’s design capacity of 500,000 Dth/d at Meacham or the 
operationally available capacity at that location on that day, 
Northwest will provide Shippers with their specific OFO 
obligations by 4:00 p.m. MST. Shippers must comply with their 
OFO obligations no later than the Evening nomination deadline 
(5:00 p.m. MST).
Shippers can monitor throughput quantities and obtain a copy of 
Northwest’s OFO procedures on Northwest’s website at 
www.northwest.williams.com.  
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline

Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
Notice ID: 32647

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-019

Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

 posted on
 
Feb 5 2026 2:03PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/05/2026 1:56 PM MCT
Notice Eff D/T: 02/05/2026 1:56 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-019
Prior Notice: 
Subject: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

Notice Text:

Northwest is experiencing unplanned maintenance at Chehalis 
Unit 2 located at MP 1289.38 in Lewis County, Washington. New 
replacement parts have been ordered and are in route to 
complete the repairs as quickly as possible. To maintain the 
integrity of the pipeline, the available southbound capacity 
will be restricted beginning gas day Saturday, February 07, 
2026, with the anticipated return to service on gas day 
Tuesday, February 10, 2026. 
Effective gas day Saturday, February 07, 2026, the available 
capacity at the Chehalis Compressor Station will be limited to 
500,000 Dth/day southbound. 
Additionally, effective gas day Saturday, February 07, 2026, 
and until further notice, Northwest is issuing an OFO Recall 
Advisory and Operational Flow Order (OFO) southbound through 
the Chehalis compressor pursuant to Section 14.15(d) of its 
Tariff. 
Under the OFO Recall Advisory, Shippers are required to: (1) 
recall capacity that is subject to an OFO recall provision; or 
(2) take other action that is acceptable to Northwest, to 
satisfy its OFO obligation.
If the southbound scheduled quantities exceed Northwest’s 
design capacity of 672,000 Dth/d at Chehalis, Northwest will 
provide Shippers with their specific OFO obligations by 4:00 
p.m. MST. Shippers must comply with their OFO obligations no 
later than the Evening nomination deadline (5:00 p.m. MST).
If an OFO is necessary for a given Gas Day, Northwest will wait 
until the Evening scheduling process to provide notice of a 
Declared Deficiency period and will make deficiency cuts to 
bring the nomination requests at the Chehalis compressor from 
the design capacity of 672,000 Dth/d to the operationally 
available capacity of 500,000 Dth/d. If an OFO is not 
necessary, but a deficiency period is, Northwest will provide 
notice of a Declared Deficiency period and will make deficiency 
cuts in the Timely scheduling process to bring the nomination 
requests at the Chehalis compressor to the operationally 
available capacity of 500,000 Dth/d (or whatever NWP cannot 
mitigate during any day of the unplanned maintenance period), 
all pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in 
Northwest's Tariff. The deficiency period will continue until 
the work is completed. 
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Jackson Prairie Maintenance complete and Entitlement Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Jackson Prairie Maintenance complete and Entitlement Lifted
Notice ID: 32690

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-039

Jackson Prairie Maintenance complete and Entitlement Lifted

 posted on
 
Mar 14 2026 5:03PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 03/14/2026 5:03 PM MCT
Notice Eff D/T: 03/14/2026 5:03 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-039
Prior Notice: 26-038
Subject: Jackson Prairie Maintenance complete and Entitlement Lifted

Notice Text:

Puget Sound Energy (PSE), operator of the Jackson Prairie (JP)
storage facility, has notified Northwest that the maintenance to repair 
a malfunctioning component has been completed. 
Normal withdrawal and injection nominations can commence. 
 
Because of the increased flexibility with the full return of JP, Northwest is
lifting the Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station effective immediately.
 
Please remain diligent in managing supply and demand. 
 
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Northwest Pipeline

Meacham OFO Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32672

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-030

Meacham OFO Lifted

 posted on
 
Mar 1 2026 1:34PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 03/01/2026 1:34 PM MCT
Notice Eff D/T: 03/01/2026 1:34 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-030
Prior Notice: 26-026
Subject: Meacham OFO Lifted

Notice Text:

Effective Gas Day March 1, 2026, the Recall Advisory 
and Operational Flow Order at the Meacham compressor 
(Notice 26-026) will be lifted.
 
If you have any questions, please contact your Commercial 
Services Representative or the Hotline at 713-215-6301.
Northwest Pipeline

Meacham OFO Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32655

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-024

Meacham OFO Lifted

 posted on
 
Feb 16 2026 9:07AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/16/2026 9:07 AM MCT
Notice Eff D/T: 02/16/2026 9:07 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-024
Prior Notice: 26-002
Subject: Meacham OFO Lifted

Notice Text:

Effective Gas Day February 16, 2026, the Recall Advisory and 
Operational Flow Order at the Meacham compressor (Notice 26-
0002) will be lifted.
If you have any questions, please contact your Commercial 
Services Representative or the Hotline at 713-215-6301.
Northwest Pipeline

Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
Notice ID: 32651

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-021

Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

 posted on
 
Feb 9 2026 8:03AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 02/09/2026 7:51 AM MCT
Notice Eff D/T: 02/09/2026 7:51 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-021
Prior Notice: 26-020
Subject: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

Notice Text:

Northwest is pleased to inform customers that repairs on
Chehalis Unit 2, as referenced in Notice #26-019, will be
complete today. Effective Gas Day 10 the Recall Advisory and
Operational Flow Order at the Chehalis CS will be lifted. 
Northwest will accept nominations up to 800,000 Dth/d
southbound through Chehalis CS starting Timely cycle on Gas
Day February 10, 2026. This will also end the current
Deficiency Period.
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline

Chehalis Compressor Station Deficiency Period

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Compressor Station Deficiency Period
Notice ID: 32648

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-020

Chehalis Compressor Station Deficiency Period

 posted on
 
Feb 6 2026 3:37PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/06/2026 3:33 PM MCT
Notice Eff D/T: 02/06/2026 3:33 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-020
Prior Notice: 
Subject: Chehalis Compressor Station Deficiency Period

Notice Text:

As indicated in All Shippers Notice #26-019, Northwest is 
currently experiencing unplanned maintenance at the Chehalis 
compressor station. 
Primary southbound nomination requests at the Chehalis 
compressor have exceeded the available capacity of 500,000 
Dth/d southbound (or whatever Northwest cannot mitigate). 
Therefore, pursuant to Sections 10.2 and 10.3 of Rate Schedule 
TF-1 in Northwest's Tariff, Northwest hereby gives notice of a 
Deficiency Period for Gas Day February 07, 2026. The Deficiency 
will be calculated based on a design capacity of 672,000 Dth/d 
southbound. The Deficiency Period will continue until the work 
is completed. Northwest will post on its EBB if unable to 
mitigate volumes each day until the work is completed.
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Stage III (13%) Overrun Entitlement Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement Lifted
Notice ID: 32630

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-013

Stage III (13%) Overrun Entitlement Lifted

 posted on
 
Jan 26 2026 10:07AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/26/2026 10:04 AM MCT
Notice Eff D/T: 01/26/2026 10:04 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-013
Prior Notice: 26-007
Subject: Stage III (13%) Overrun Entitlement Lifted

Notice Text:

Effective Gas Day January 28, 2026, Northwest is lifting the 
Stage III (13%) Overrun Entitlement for all Receiving Parties 
north of the Kemmerer compressor station that was originally 
issued in All Shipper’s Notice 26-007.
Northwest requests that shippers continue to be diligent in 
managing their supply and demand needs.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Underrun Entitlement Warning Lifted

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning Lifted
Notice ID: 32754

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-043

Underrun Entitlement Warning Lifted

 posted on
 
Apr 6 2026 11:31AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 04/06/2026 11:31 AM MCT
Notice Eff D/T: 04/06/2026 11:31 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-043
Prior Notice: 26-041
Subject: Underrun Entitlement Warning Lifted

Notice Text:

Effective immediately, Northwest is lifting the Underrun 
Entitlement Warning that was originally issued in All Shipper’s 
Notice 26-041.
Northwest requests that shippers continue to be diligent in 
managing their supply and demand needs.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Stage III (13%) Overrun Entitlement

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement
Notice ID: 32622

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-007

Stage III (13%) Overrun Entitlement

 posted on
 
Jan 21 2026 3:24PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/21/2026 3:24 PM MCT
Notice Eff D/T: 01/21/2026 3:24 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-007
Prior Notice: 
Subject: Stage III (13%) Overrun Entitlement

Notice Text:

Due to forecasted cooler weather across the nation, Northwest is 
requesting customers to secure adequate supply to meet demand and 
avoid drafting the system. Northwest is declaring a Stage III 
(13%) Overrun Entitlement for all Receiving Parties north of the 
Kemmerer compressor station effective Gas Day Friday, January 23, 
2026. This entitlement includes all points on the Spokane, 
Wenatchee and Grants Pass laterals, and shall continue until 
further notice.
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.