Pipeline: Northwest Pipeline
Notice: Caldwell CS – Unplanned Maintenance
Notice ID: 32759
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-046
Caldwell CS – Unplanned Maintenance
posted on
Apr 13 2026 8:49AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 04/13/2026 8:45 AM MCT
Notice Eff D/T: 04/13/2026 8:45 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-046
Prior Notice:
Subject: Caldwell CS – Unplanned Maintenance
Notice Text:
Northwest is experiencing unplanned maintenance at Caldwell
Unit 4, located at MP 849.8 in Gem County, Idaho. Initial
assessments indicate this is expected to result in an extended
outage, with an estimated duration of 60 to 90 days to
complete the required repairs.
Northwest is doing everything possible to complete the work as
quickly and safely as possible to bring in this timeline. We
will provide updates on our EBB as additional information
becomes available.
Effective Gas Day Tuesday, April 14, 2026, the available
capacity at the Caldwell Compressor Station will be limited to
438,000 Dth/d northbound and 439,000 Dth/d southbound.
If primary nomination requests through the Caldwell CS exceeds
the available capacity of 438,000 Dth/d northbound or 439,000
Dth/d southbound (or whatever NWP cannot mitigate during any
day of the maintenance), pursuant to Sections 10.2 and 10.3 of
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give
notice of a Declared Deficiency Period based on a design
capacity of 452,000 Dth/d northbound or 475,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Unplanned maintenance at Jackston Prairie and declared Entitlement
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Unplanned maintenance at Jackston Prairie and declared Entitlement
Notice ID: 32689
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-038
Unplanned maintenance at Jackston Prairie and declared Entitlement
posted on
Mar 12 2026 8:59AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 03/12/2026 8:54 AM MCT
Notice Eff D/T: 03/12/2026 8:54 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-038
Prior Notice:
Subject: Unplanned maintenance at Jackston Prairie and declared Entitlement
Notice Text:
Puget Sound Energy (PSE), operator of Jackson Prairie (JP)
storage facility, has notified Northwest of a malfunctioning
component at JP Storage currently preventing injection
capability. PSE is actively working to source the part and
safely bring the facility back to full operational capacity.
Northwest will accept injection nominations at JP only to the
extent such injections can be netted against corresponding
withdrawal nominations.
Because system flexibility will be limited, Northwest is
declaring a Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station
beginning Gas Day Saturday, March 14, 2026.
Please remain diligent in managing supply and demand and avoid
banking the system. On system balancing on Northwest’s
Electronic Bulletin Board is currently designated as “No” for
all areas.
Northwest would like to thank the customers in advance for
their cooperation. We will provide further updates as more
information becomes available.
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham Notice of Recall and OFO
Notice ID: 32657
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-026
Meacham Notice of Recall and OFO
posted on
Feb 17 2026 3:46PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/17/2026 3:46 PM MCT
Notice Eff D/T: 02/17/2026 3:46 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-026
Prior Notice:
Subject: Meacham Notice of Recall and OFO
Notice Text:
Effective Gas Day Thursday, February 19, 2026 and until further
notice, Northwest is issuing an OFO Recall Advisory and
Operational Flow Order (OFO) through the Meacham compressor
pursuant to Section 14.15(d) of its Tariff.
Under the OFO Recall Advisory, Shippers are required to: (1)
recall capacity that is subject to an OFO recall provision; or
(2) take other action that is acceptable to Northwest, to
satisfy its OFO obligation.
If the southbound scheduled quantities exceed the greater of
Northwest’s design capacity of 500,000 Dth/d at Meacham or the
operationally available capacity at that location on that day,
Northwest will provide Shippers with their specific OFO
obligations by 4:00 p.m. MST. Shippers must comply with their
OFO obligations no later than the Evening nomination deadline
(5:00 p.m. MST).
Shippers can monitor throughput quantities and obtain a copy of
Northwest’s OFO procedures on Northwest’s website at
www.northwest.williams.com.
If you have any questions, please contact your Commercial
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline
Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
Notice ID: 32647
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-019
Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
posted on
Feb 5 2026 2:03PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/05/2026 1:56 PM MCT
Notice Eff D/T: 02/05/2026 1:56 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-019
Prior Notice:
Subject: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
Notice Text:
Northwest is experiencing unplanned maintenance at Chehalis
Unit 2 located at MP 1289.38 in Lewis County, Washington. New
replacement parts have been ordered and are in route to
complete the repairs as quickly as possible. To maintain the
integrity of the pipeline, the available southbound capacity
will be restricted beginning gas day Saturday, February 07,
2026, with the anticipated return to service on gas day
Tuesday, February 10, 2026.
Effective gas day Saturday, February 07, 2026, the available
capacity at the Chehalis Compressor Station will be limited to
500,000 Dth/day southbound.
Additionally, effective gas day Saturday, February 07, 2026,
and until further notice, Northwest is issuing an OFO Recall
Advisory and Operational Flow Order (OFO) southbound through
the Chehalis compressor pursuant to Section 14.15(d) of its
Tariff.
Under the OFO Recall Advisory, Shippers are required to: (1)
recall capacity that is subject to an OFO recall provision; or
(2) take other action that is acceptable to Northwest, to
satisfy its OFO obligation.
If the southbound scheduled quantities exceed Northwest’s
design capacity of 672,000 Dth/d at Chehalis, Northwest will
provide Shippers with their specific OFO obligations by 4:00
p.m. MST. Shippers must comply with their OFO obligations no
later than the Evening nomination deadline (5:00 p.m. MST).
If an OFO is necessary for a given Gas Day, Northwest will wait
until the Evening scheduling process to provide notice of a
Declared Deficiency period and will make deficiency cuts to
bring the nomination requests at the Chehalis compressor from
the design capacity of 672,000 Dth/d to the operationally
available capacity of 500,000 Dth/d. If an OFO is not
necessary, but a deficiency period is, Northwest will provide
notice of a Declared Deficiency period and will make deficiency
cuts in the Timely scheduling process to bring the nomination
requests at the Chehalis compressor to the operationally
available capacity of 500,000 Dth/d (or whatever NWP cannot
mitigate during any day of the unplanned maintenance period),
all pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in
Northwest's Tariff. The deficiency period will continue until
the work is completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham Notice of Recall and OFO
Notice ID: 32882
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-121
Meacham Notice of Recall and OFO
posted on
Jun 15 2026 7:41AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 06/15/2026 7:38 AM MCT
Notice Eff D/T: 06/15/2026 7:38 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-121
Prior Notice:
Subject: Meacham Notice of Recall and OFO
Notice Text:
Effective Gas Day Tuesday, June 16, 2026, and until further
notice, Northwest is issuing an OFO Recall Advisory and
Operational Flow Order (OFO) through the Meacham compressor
pursuant to Section 14.15(d) of its Tariff.
Under the OFO Recall Advisory, Shippers are required to: (1)
recall capacity that is subject to an OFO recall provision; or
(2) take other action that is acceptable to Northwest, to
satisfy its OFO obligation.
If the southbound scheduled quantities exceed the greater of
Northwest’s design capacity of 500,000 Dth/d at Meacham or the
operationally available capacity at that location on that day,
Northwest will provide Shippers with their specific OFO
obligations by 4:00 p.m. MST. Shippers must comply with their
OFO obligations no later than the Evening nomination deadline
(5:00 p.m. MST).
Shippers can monitor throughput quantities and obtain a copy of
Northwest’s OFO procedures on Northwest’s website at
www.northwest.williams.com.
If you have any questions, please contact your Commercial
Services Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: SGS-2I Injections Restricted at JP
Notice ID: 32852
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-115
SGS-2I Injections Restricted at JP
posted on
May 26 2026 7:32AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: STORAGE
Post D/T: 05/26/2026 7:25 AM MCT
Notice Eff D/T: 05/26/2026 7:25 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-115
Prior Notice:
Subject: SGS-2I Injections Restricted at JP
Notice Text:
Effective Gas Day May 27, 2026, Northwest will no longer accept
SGS-2I injections into the Jackson Prairie (JP) storage
facility. Additionally, Northwest is requesting SGS-2I storage
holders with existing balances to begin reducing inventory
levels. Northwest will provide official notice to vacate,
pursuant to Section 2.3 of the SGS-2I Rate Schedule, when the
total JP inventory approaches 23 Bcf or operating conditions
require such utilized capacity to meet firm obligations or
system balancing requirements.
As a reminder, SGS-2I customers can track JP inventory levels
on Northwest’s Electronic Bulletin Board.
Please contact your Commercial Services Representative or the
hotline at 713-215-6301 if you have any questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Rangely CS - Unplanned Maintenance
Notice ID: 32969
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-149
Rangely CS - Unplanned Maintenance
posted on
Aug 19 2026 7:27AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 08/19/2026 7:18 AM MCT
Notice Eff D/T: 08/19/2026 7:18 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-149
Prior Notice:
Subject: Rangely CS - Unplanned Maintenance
Notice Text:
Northwest is experiencing unplanned maintenance at the Rangely
compressor station, located at MP 278.2 in Rio Blanco County,
Colorado. Initial assessments indicate this outage is expected
last 14 days to complete the required repairs.
Northwest is doing everything possible to complete the work as
quickly and safely as possible to bring in this timeline and
will provide updates on our EBB as additional information
becomes available.
Effective Gas Day Thursday, August 20, 2026, the available
capacity at the Rangely compressor station will be limited to
290,000 Dth/d northbound.
If primary nomination requests through the Rangel CS exceeds
the available capacity of 290,000 Dth/d northbound (or whatever
NWP cannot mitigate during any day of the maintenance),
pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in
Northwest's Tariff, Northwest will give notice of a Declared
Deficiency Period based on a design capacity of 350,000 Dth/d
Northbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Jackson Prairie Maintenance complete and Entitlement Lifted
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Jackson Prairie Maintenance complete and Entitlement Lifted
Notice ID: 32690
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-039
Jackson Prairie Maintenance complete and Entitlement Lifted
posted on
Mar 14 2026 5:03PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 03/14/2026 5:03 PM MCT
Notice Eff D/T: 03/14/2026 5:03 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-039
Prior Notice: 26-038
Subject: Jackson Prairie Maintenance complete and Entitlement Lifted
Notice Text:
Puget Sound Energy (PSE), operator of the Jackson Prairie (JP)
storage facility, has notified Northwest that the maintenance to repair
a malfunctioning component has been completed.
Normal withdrawal and injection nominations can commence.
Because of the increased flexibility with the full return of JP, Northwest is
lifting the Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station effective immediately.
Please remain diligent in managing supply and demand.
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32672
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-030
Meacham OFO Lifted
posted on
Mar 1 2026 1:34PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 03/01/2026 1:34 PM MCT
Notice Eff D/T: 03/01/2026 1:34 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-030
Prior Notice: 26-026
Subject: Meacham OFO Lifted
Notice Text:
Effective Gas Day March 1, 2026, the Recall Advisory
and Operational Flow Order at the Meacham compressor
(Notice 26-026) will be lifted.
If you have any questions, please contact your Commercial
Services Representative or the Hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32655
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-024
Meacham OFO Lifted
posted on
Feb 16 2026 9:07AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/16/2026 9:07 AM MCT
Notice Eff D/T: 02/16/2026 9:07 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-024
Prior Notice: 26-002
Subject: Meacham OFO Lifted
Notice Text:
Effective Gas Day February 16, 2026, the Recall Advisory and
Operational Flow Order at the Meacham compressor (Notice 26-
0002) will be lifted.
If you have any questions, please contact your Commercial
Services Representative or the Hotline at 713-215-6301.
Northwest Pipeline
Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
Notice ID: 32651
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-021
Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
posted on
Feb 9 2026 8:03AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 02/09/2026 7:51 AM MCT
Notice Eff D/T: 02/09/2026 7:51 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-021
Prior Notice: 26-020
Subject: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
Notice Text:
Northwest is pleased to inform customers that repairs on
Chehalis Unit 2, as referenced in Notice #26-019, will be
complete today. Effective Gas Day 10 the Recall Advisory and
Operational Flow Order at the Chehalis CS will be lifted.
Northwest will accept nominations up to 800,000 Dth/d
southbound through Chehalis CS starting Timely cycle on Gas
Day February 10, 2026. This will also end the current
Deficiency Period.
If you have any questions, please contact your Commercial
Services Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Compressor Station Deficiency Period
Notice ID: 32648
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-020
Chehalis Compressor Station Deficiency Period
posted on
Feb 6 2026 3:37PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/06/2026 3:33 PM MCT
Notice Eff D/T: 02/06/2026 3:33 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-020
Prior Notice:
Subject: Chehalis Compressor Station Deficiency Period
Notice Text:
As indicated in All Shippers Notice #26-019, Northwest is
currently experiencing unplanned maintenance at the Chehalis
compressor station.
Primary southbound nomination requests at the Chehalis
compressor have exceeded the available capacity of 500,000
Dth/d southbound (or whatever Northwest cannot mitigate).
Therefore, pursuant to Sections 10.2 and 10.3 of Rate Schedule
TF-1 in Northwest's Tariff, Northwest hereby gives notice of a
Deficiency Period for Gas Day February 07, 2026. The Deficiency
will be calculated based on a design capacity of 672,000 Dth/d
southbound. The Deficiency Period will continue until the work
is completed. Northwest will post on its EBB if unable to
mitigate volumes each day until the work is completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement Lifted
Notice ID: 32630
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-013
Stage III (13%) Overrun Entitlement Lifted
posted on
Jan 26 2026 10:07AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/26/2026 10:04 AM MCT
Notice Eff D/T: 01/26/2026 10:04 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-013
Prior Notice: 26-007
Subject: Stage III (13%) Overrun Entitlement Lifted
Notice Text:
Effective Gas Day January 28, 2026, Northwest is lifting the
Stage III (13%) Overrun Entitlement for all Receiving Parties
north of the Kemmerer compressor station that was originally
issued in All Shipper’s Notice 26-007.
Northwest requests that shippers continue to be diligent in
managing their supply and demand needs.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Albany ESD, Washougal Valve Repl, & Baker ESD - Maintenance Reminder
Notice ID: 32937
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-139
Albany ESD, Washougal Valve Repl, & Baker ESD - Maintenance Reminder
posted on
Jul 23 2026 8:33AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 07/23/2026 8:32 AM MCT
Notice Eff D/T: 07/23/2026 8:32 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-139
Prior Notice:
Subject: Albany ESD, Washougal Valve Repl, & Baker ESD - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing maintenance at the
following locations next week:
-
Albany CS: located at MP 83.46 in Linn County, Oregon
beginning gas day July 27, 2026, through gas day
July 31, 2026.
-
Washougal North Constraint: located at MP 1216.22 in
Clark County, Washington beginning gas day July 27, 2026,
through gas day August 01, 2026.
-
Baker CS: located at MP 948.95 in Baker County, Oregon
beginning gas day July 28, 2026, through gas day July
30, 2026.
The Albany CS will be limited to 116,000 Dth/d southbound for
the duration of the outage.
If primary nomination requests through the Albany CS exceeds
the available capacity of 116,000 Dth/d southbound (or whatever
NWP cannot mitigate during any day of the maintenance),
pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in
Northwest's Tariff, Northwest will give notice of a Declared
Deficiency Period based on a design capacity of 120,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
The Washougal North Constraint will be limited to net 0 Dth/d
northbound and net 0 Dth/d southbound for the duration of the
outage.
Please note, the Grants Pass Lateral will have to be
completely supplied with gas coming from the Gorge during
this
outage.
If primary nomination requests through the Washougal North
Constraint exceeds the available capacity of net 0 Dth/d
northbound or net 0 Dth/d southbound (or whatever NWP cannot
mitigate during any day of the maintenance), pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest will give notice of a Declared Deficiency
Period based on a design capacity of 305,000 Dth/d northbound
or 521,000 Dth/d southbound. The deficiency period will
continue until the work has been completed.
The Baker CS will be limited to 357,000 Dth/d northbound and
463,000 Dth/d southbound for the duration of the outage.
If primary nomination requests through the Baker CS exceeds the
available capacity of 357,000 Dth/d northbound or 463,000 Dth/d
southbound (or whatever NWP cannot mitigate during any day of
the maintenance), pursuant to Sections 10.2 and 10.3 of Rate
Schedule TF-1 in Northwest's Tariff, Northwest will give notice
of a Declared Deficiency Period based on a design capacity of
446,000 Dth/d northbound or 491,000 Dth/d southbound. The
deficiency period will continue until the work has been
completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: La Plata B to Pleasant View Pig Run Impact
Notice ID: 32849
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-113
La Plata B to Pleasant View Pig Run Impact
posted on
May 19 2026 11:39AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 05/19/2026 11:36 AM MCT
Notice Eff D/T: 05/19/2026 11:36 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-113
Prior Notice:
Subject: La Plata B to Pleasant View Pig Run Impact
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest is currently performing pig runs through the
La Plata B to Pleasant View corridor with the last run
scheduled to be completed on gas day May 21, 2026. Northwest
was not anticipating any impacts to customers, however, due to
current pipeline conditions the available northbound capacity
through the La Plata B CS will need to be limited to maintain
the integrity of the pig run.
Effective for gas day May 21, 2026, the La Plata B CS (located
in La Plata County, Colorado at MP 0.1) will be limited to
100,000 dth/d northbound.
If primary nomination requests through the La Plata B CS
exceeds the available capacity of 100,000 Dth/d northbound (or
whatever NWP cannot mitigate during any day of the
maintenance), pursuant to Sections 10.2 and 10.3 of Rate
Schedule TF-1 in Northwest's Tariff, Northwest will give notice
of a Declared Deficiency Period based on a design capacity of
283,000 Dth/d northbound. The deficiency period will continue
until the work has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Pegram ESD & Pocatello M&ERP Tie-in ML - Maintenance Reminder
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Pegram ESD & Pocatello M&ERP Tie-in ML - Maintenance Reminder
Notice ID: 32934
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-137
Pegram ESD & Pocatello M&ERP Tie-in ML - Maintenance Reminder
posted on
Jul 16 2026 2:12PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 07/16/2026 2:10 PM MCT
Notice Eff D/T: 07/16/2026 2:10 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-137
Prior Notice:
Subject: Pegram ESD & Pocatello M&ERP Tie-in ML - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing maintenance at the
following locations next week:
-
Pegram CS: located at MP 495.54 in Bear Lake County,
Idaho beginning gas day July 20, 2026, through gas day
July 24, 2026.
-
Pocatello CS: located at MP 607.28 in Power County, Idaho
beginning gas day July 24, 2026, through gas day August
15, 2026.
The Pegram CS will be limited to 602,000 Dth/d northbound for
the duration of the outage.
If primary nomination requests through the Pegram CS exceeds
the available capacity of 602,000 Dth/d northbound (or whatever
NWP cannot mitigate during any day of the maintenance),
pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in
Northwest's Tariff, Northwest will give notice of a Declared
Deficiency Period based on a design capacity of 654,000 Dth/d
northbound. The deficiency period will continue until the work
has been completed.
The Pocatello CS will be limited to 398,000 Dth/d northbound
for the duration of the outage.
If primary nomination requests through the Pocatello CS exceeds
the available capacity of 398,000 Dth/d northbound (or whatever
NWP cannot mitigate during any day of the maintenance),
pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in
Northwest's Tariff, Northwest will give notice of a Declared
Deficiency Period based on a design capacity of 610,000 Dth/d
northbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Buhl M&ERP and Lava Hot Springs Solar Inspections - Maintenance Reminder
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Buhl M&ERP and Lava Hot Springs Solar Inspections - Maintenance Reminder
Notice ID: 32879
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-119
Buhl M&ERP and Lava Hot Springs Solar Inspections - Maintenance Reminder
posted on
Jun 4 2026 3:40PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 06/04/2026 3:31 PM MCT
Notice Eff D/T: 06/04/2026 3:31 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-119
Prior Notice:
Subject: Buhl M&ERP and Lava Hot Springs Solar Inspections - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing maintenance at the
following locations next week:
-
Buhl CS: located at MP 729.8 in Twin Falls County,
Idaho beginning gas day June 08, 2026, through gas day
October 31, 2026.
-
Lava Hot Springs CS: located at MP 567.42 in Bannock
County, Idaho beginning gas day June 09, 2026, through
gas day June 11, 2026.
The Buhl CS will be limited to 499,000 Dth/d northbound for
the duration of the outage.
If primary nomination requests through the Buhl CS exceeds the
available capacity of 499,000 Dth/d northbound (or whatever NWP
cannot mitigate during any day of the maintenance), pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest will give notice of a Declared Deficiency
Period based on a design capacity of 578,000 Dth/d northbound.
The deficiency period will continue until the work has been
completed.
The Lava Hot Springs CS will be limited to 582,000 Dth/d
northbound and for the duration of the outage.
If primary nomination requests through the Lava Hot Springs CS
exceeds the available capacity of 582,000 Dth/d northbound (or
whatever NWP cannot mitigate during any day of the
maintenance), pursuant to Sections 10.2 and 10.3 of Rate
Schedule TF-1 in Northwest's Tariff, Northwest will give notice
of a Declared Deficiency Period based on a design capacity of
650,000 Dth/d northbound. The deficiency period will continue
until the work has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32935
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-138
Meacham OFO Lifted
posted on
Jul 20 2026 9:19AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 07/20/2026 9:17 AM MCT
Notice Eff D/T: 07/20/2026 9:17 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-138
Prior Notice: 26-121
Subject: Meacham OFO Lifted
Notice Text:
Effective Gas Day July 21, 2026, the Recall Advisory
and Operational Flow Order at the Meacham compressor
station (Notice 26-121) will be lifted.
If you have any questions, please contact your Commercial
Services Representative or the Hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Notice to Vacate SGS-2I Inventory at JP
Notice ID: 32883
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-122
Notice to Vacate SGS-2I Inventory at JP
posted on
Jun 15 2026 8:46AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: STORAGE
Post D/T: 06/15/2026 8:44 AM MCT
Notice Eff D/T: 06/15/2026 8:44 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-122
Prior Notice: 26-115
Subject: Notice to Vacate SGS-2I Inventory at JP
Notice Text:
The total Jackson Prairie (JP) inventory has reached 23 Bcf. To
make working gas storage space available for firm storage
holders at JP, Northwest is requiring all SGS-2I Shippers with
existing Working Gas Inventory to eliminate their balance by
the end of Gas Day June 30, 2026. If operational circumstances
require a change to that date, Northwest will issue an
additional posting in accordance with Section 2.3 of the SGS-2I
Rate Schedule.
Pursuant to Section 2.3 of the SGS-2I Rate Schedule, if a
Shipper fails to reduce its Working Gas Inventory to the level
specified above, then Northwest shall take title to Shipper’s
Working Gas Inventory that exceeds the Working Gas Inventory
level specified above.
Please contact your Commercial Services Representative or the
Northwest Pipeline Hotline at 713-215-6301 if you have any
questions.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Burley Compressor Station Deficiency Period
Notice ID: 32979
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-155
Burley Compressor Station Deficiency Period
posted on
Aug 19 2026 3:27PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: CURTAILMENT
Post D/T: 08/19/2026 3:25 PM MCT
Notice Eff D/T: 08/19/2026 3:25 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-155
Prior Notice: 26-142
Subject: Burley Compressor Station Deficiency Period
Notice Text:
As indicated in All Shippers Notice #26-142, Northwest is
currently performing maintenance at the Burley CS through gas
day August 24, 2026.
Primary northbound nomination requests at the Burley CS have
exceeded the available capacity of 336,000 Dth/d northbound (or
whatever Northwest cannot mitigate). Therefore, pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest hereby gives notice of a Deficiency Period
for Gas Day August 20, 2026. The Deficiency will be calculated
based on a design capacity of 579,000 Dth/d northbound. The
Deficiency Period will continue until the work is completed.
Northwest will post on its EBB if unable to mitigate volumes
each day until the work is completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Sumas ESD & Meter Upgrade Part 1 - Maintenance Reminder
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Sumas ESD & Meter Upgrade Part 1 - Maintenance Reminder
Notice ID: 32980
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-156
Sumas ESD & Meter Upgrade Part 1 - Maintenance Reminder
posted on
Aug 21 2026 10:10AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 08/21/2026 10:09 AM MCT
Notice Eff D/T: 08/21/2026 10:09 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-156
Prior Notice:
Subject: Sumas ESD & Meter Upgrade Part 1 - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing two separate maintenance
outages at the following location next week:
-
Sumas CS: located at MP 1484.48 in Whatcom County,
Washington on gas day August 25, 2026, for the first
outage and beginning gas day August 28, 2026, through gas
day September 01, 2026, for the second outage.
The Sumas CS will be limited to 907,000 Dth/d southbound
for the first outage on gas day August 25, 2026.
If primary nomination requests through the Sumas CS exceeds the
available capacity of 907,000 Dth/d southbound (or whatever NWP
cannot mitigate during any day of the maintenance), pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest will give notice of a Declared Deficiency
Period based on a design capacity of 1,409,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
The Sumas CS will be limited to 968,000 Dth/d southbound
for the second outage beginning on gas day August 28, 2026,
through gas day September 01, 2026.
If primary nomination requests through the Sumas CS exceeds the
available capacity of 968,000 Dth/d southbound (or whatever NWP
cannot mitigate during any day of the maintenance), pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest will give notice of a Declared Deficiency
Period based on a design capacity of 1,409,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline
Overrun Entitlement Warning North of Muddy Creek North Constraint
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Overrun Entitlement Warning North of Muddy Creek North Constraint
Notice ID: 32985
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-158
Overrun Entitlement Warning North of Muddy Creek North Constraint
posted on
Aug 25 2026 5:02PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 08/25/2026 5:02 PM MCT
Notice Eff D/T: 08/25/2026 5:02 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-158
Prior Notice:
Subject: Overrun Entitlement Warning North of Muddy Creek North Constraint
Notice Text:
Due to excessive drafting, Northwest is issuing an Overrun
Entitlement Warning for all Receiving Parties north of the Muddy
Creek North Constraint beginning Gas Day Thursday, August 27,
2026 until further notice.
As a reminder and pursuant to Section 14.6(c) of its Tariff,
customer-specific entitlements may be issued to Receiving
Parties that:
1)
has contributed to the adverse operating conditions for at
least two consecutive days; and
2)
whose actual measured deliveries have deviated from
scheduled deliveries for the previous Gas Day by the greater of
10,000 Dth or 5 percent.
Please remain diligent in managing supply and demand and avoid
drafting the system. Off system balancing on Northwest’s
Electronic Bulletin Board is currently designated as “No” for all
areas.
If you have any questions, please contact your Commercial
Services Representative or the Scheduling Hotline at 713-215-
6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning Lifted
Notice ID: 32754
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-043
Underrun Entitlement Warning Lifted
posted on
Apr 6 2026 11:31AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 04/06/2026 11:31 AM MCT
Notice Eff D/T: 04/06/2026 11:31 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-043
Prior Notice: 26-041
Subject: Underrun Entitlement Warning Lifted
Notice Text:
Effective immediately, Northwest is lifting the Underrun
Entitlement Warning that was originally issued in All Shipper’s
Notice 26-041.
Northwest requests that shippers continue to be diligent in
managing their supply and demand needs.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement
Notice ID: 32622
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-007
Stage III (13%) Overrun Entitlement
posted on
Jan 21 2026 3:24PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/21/2026 3:24 PM MCT
Notice Eff D/T: 01/21/2026 3:24 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-007
Prior Notice:
Subject: Stage III (13%) Overrun Entitlement
Notice Text:
Due to forecasted cooler weather across the nation, Northwest is
requesting customers to secure adequate supply to meet demand and
avoid drafting the system. Northwest is declaring a Stage III
(13%) Overrun Entitlement for all Receiving Parties north of the
Kemmerer compressor station effective Gas Day Friday, January 23,
2026. This entitlement includes all points on the Spokane,
Wenatchee and Grants Pass laterals, and shall continue until
further notice.
If you have any questions, please contact your Commercial
Services Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Roosevelt ESD - Maintenance Reminder
Notice ID: 32956
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-146
Roosevelt ESD - Maintenance Reminder
posted on
Aug 6 2026 8:26AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 08/06/2026 8:22 AM MCT
Notice Eff D/T: 08/06/2026 8:22 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-146
Prior Notice:
Subject: Roosevelt ESD - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing maintenance at the
following location next week:
-
Roosevelt CS: located at MP 1097.6 in Klickitat County,
Washington beginning gas day August 10, 2026, through gas
day August 14, 2026.
The Roosevelt CS will be limited to 383,000 Dth/d northbound
and 350,000 Dth/d southbound for the duration of the outage.
If primary nomination requests through the Roosevelt CS exceeds
the available capacity of 383,000 Dth/d northbound or 350,000
Dth/d southbound (or whatever NWP cannot mitigate during any
day of the maintenance), pursuant to Sections 10.2 and 10.3 of
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give
notice of a Declared Deficiency Period based on a design
capacity of 546,000 Dth/d northbound or 414,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning Lifted
Notice ID: 32951
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-143
Underrun Entitlement Warning Lifted
posted on
Jul 31 2026 11:46AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 07/31/2026 11:28 AM MCT
Notice Eff D/T: 07/31/2026 11:28 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-143
Prior Notice: 26-131
Subject: Underrun Entitlement Warning Lifted
Notice Text:
Effective Gas Day 08/02/2026, Northwest is lifting the Underrun
Entitlement Warning that was originally issued in All Shipper’s
Notice 26-131.
Northwest requests that shippers continue to be diligent in
managing their supply and demand needs.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning
Notice ID: 32908
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-131
Underrun Entitlement Warning
posted on
Jun 29 2026 10:07AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 06/29/2026 10:03 AM MCT
Notice Eff D/T: 06/29/2026 10:03 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-131
Prior Notice:
Subject: Underrun Entitlement Warning
Notice Text:
Northwest has limited balancing flexibility with Jackson Prairie
filling as expected. Additionally, on the south end of the system,
Northwest is also subject to injection allocation at the Clay
Basin facility. These factors severely limit Northwest’s ability
to absorb banked gas on the system. Northwest is issuing an
Underrun Entitlement Warning effective Gas Day June 30, 2026, and
urge shippers to balance their supply and demand needs.
As a reminder and pursuant to Section 14(c) of its Tariff,
customer-specific entitlements may be issued to Receiving
Parties that:
1)
have contributed to the adverse operating conditions for
at least two consecutive days; and
2)
whose actual measured deliveries have deviated from
scheduled deliveries for the previous Gas Day by the greater of
10,000 Dth or 5 percent.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Jackson Prairie Maintenance Reminder
Notice ID: 32930
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-136
Jackson Prairie Maintenance Reminder
posted on
Jul 10 2026 10:17AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 07/10/2026 10:13 AM MCT
Notice Eff D/T: 07/10/2026 10:13 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-136
Prior Notice:
Subject: Jackson Prairie Maintenance Reminder
Notice Text:
Puget Sound Energy, operator of Jackson Prairie (JP) storage
facility, has notified Northwest that maintenance will be
performed at JP beginning Gas Day July 14, 2026, through Gas
Day July 22, 2026.
The facility will be shut-in and neither withdrawals nor
injections will be available during this period.
Due to Northwest’s limited balance flexibility during this
time, please stay on rate and avoid drafting or banking the
system during this outage. For those with the need for
system balancing, Northwest will work with you to adjust those
balances prior to or after the JP outage.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Sumas Meter Upgrade Part 2 - Maintenance Reminder
Notice ID: 32994
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-162
Sumas Meter Upgrade Part 2 - Maintenance Reminder
posted on
Aug 27 2026 11:45AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 08/27/2026 11:44 AM MCT
Notice Eff D/T: 08/27/2026 11:44 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-162
Prior Notice:
Subject: Sumas Meter Upgrade Part 2 - Maintenance Reminder
Notice Text:
As posted in the maintenance schedule on Northwest Pipeline's
website, Northwest will be performing maintenance at the
following location next week:
-
Sumas CS: located at MP 1484.48 in Whatcom County,
Washington beginning gas day September 02, 2026, through
gas day September 09, 2026.
The Sumas CS will be limited to 821,000 Dth/d southbound for
the duration of the outage.
If primary nomination requests through the Sumas CS exceeds the
available capacity of 821,000 Dth/d southbound (or whatever NWP
cannot mitigate during any day of the maintenance), pursuant to
Sections 10.2 and 10.3 of Rate Schedule TF-1 in Northwest's
Tariff, Northwest will give notice of a Declared Deficiency
Period based on a design capacity of 1,409,000 Dth/d
southbound. The deficiency period will continue until the work
has been completed.
Please reference the Maintenance Schedule tab at
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Technical Issues for Gas 8/28/26 Timely Cycle
Notice ID: 32998
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-163
Technical Issues for Gas 8/28/26 Timely Cycle
posted on
Aug 27 2026 4:08PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: COMPUTER SYSTEM STATUS
Post D/T: 08/27/2026 4:04 PM MCT
Notice Eff D/T: 08/27/2026 4:04 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-163
Prior Notice:
Subject: Technical Issues for Gas 8/28/26 Timely Cycle
Notice Text:
Northwest Pipeline experienced technical issues during the Timely cycle for Gas Day August 28,
2026 and was unable to fully schedule volumes. We are working diligently to resolve the issues and
will have the volumes reinstated for the Evening cycle.
If you have any questions please contact your Commercial Services representative, or call the
hotline at (713) 215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Technical Issues Resolved for Gas 8/28/26
Notice ID: 33000
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-164
Technical Issues Resolved for Gas 8/28/26
posted on
Aug 27 2026 7:32PM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: COMPUTER SYSTEM STATUS
Post D/T: 08/27/2026 7:29 PM MCT
Notice Eff D/T: 08/27/2026 7:29 PM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-164
Prior Notice: 26-163
Subject: Technical Issues Resolved for Gas 8/28/26
Notice Text:
The technical issues experienced during the Timely cycle for Gas Day August 28, 2026 have been resolved. Passage is completing and confirming cycles as expected.
If you have any questions please contact your Commercial Services representative, or call the
hotline at (713) 215-6301.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Overrun Entitlement Warning Lifted
Notice ID: 33005
Capacity
Operationally Available
Unsubscribed
Gas Quality
Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
Gas Quality Resolution Report
RNG Operating Policy
Index of Customers
Locations
Notices
Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat
Posted Imbalances
Regulatory
FERC Watch
Proposed Tariff Filings
Standards of Conduct
Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent
Tariff
Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
Entire Tariff
Sheet/Section Index
Transactional Reporting
Capacity Release
Firm
Interruptible
Capacity Release Indices
TSP Capacity Offering
Maintenance Schedule
Commercial Contacts
Agreements/Forms
Portal History
Other
Downloads
Search
Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal
Customer Activities
Site Map
Northwest Pipeline LLC Notice Detail
Print
Northwest Pipeline LLC
NOTICE # 26-168
Overrun Entitlement Warning Lifted
posted on
Sep 1 2026 8:02AM
TSP Name: Northwest Pipeline LLC TSP: 67977322
Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 09/01/2026 8:00 AM MCT
Notice Eff D/T: 09/01/2026 8:00 AM MCT
Notice End D/T:
Reqrd Rsp Desc: No response required
Rsp D/T:
Notice ID: 26-168
Prior Notice: 26-158
Subject: Overrun Entitlement Warning Lifted
Notice Text:
Effective immediately, Northwest is lifting the Overrun
Entitlement Warning that was originally issued in All Shipper’s
Notice 26-158.
Northwest requests that shippers continue to be diligent in
managing their supply and demand needs.
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.